OPW15/0194 - Operational Works Application - 6 Hoop Pine Rd

of 25

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (11.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

5.     Are there any current approvals             (e.g. a preliminary    approval)   associated   with this application?    (Non-
       mandatory requirement)


~      No          D     Yes-provide        details below


List of approval reference/s                                Date approved (dd/mm/yy)                Date approval lapses (dd/mm/yy)




6.     Is owner's      consent   required     for this application?      (Refer to notes at the end of this form for more information.)


~      No
D Yes-complete            either Table F, Table G or Table H as applicable


Table F

 ~ame of ownerls of the land

l!We, the above-mentioned        ownerls of the land, consent to the making of this application.

Signature of ownerls of the land


Date

Table G

Name of ownerls of the land                   I
D The owner's written consent is attached or will be provided separately to the assessment manager.
Table H

Name of ownerls of the land                   I
D By making this application, I, the applicant, declare that the owner has given written consent to the making of the application.
 !.     Identify   if any of the following        apply to the premises      (Tick applicable box/es.)


D      Adjacent to a water body, watercourse or aquifer (e.g. creek, river, lake, canal)-complete                 Table I

                                                                                                   Table J
D      On strategic port land under the Transport Infrastructure Act 1994-complete

D In a tidal water area-complete Table K
D On Brisbane core port land under the Transport Infrastructure Act 1994 (No table requires completion.)
D On airport land under the Airport Assets (Restructuring and Disposal] Act 2008 (no table requires completion)
D      Listed on either the Contaminated Land Register (CLR) or the Environmental
       the Environmental Protection Act 1994 (no table requires completion)
                                                                                                   Management      Register (EMR) under



Table I

 Name of water body, watercourse or aquifer




                                                                                                             IDAS form 1-Application details
                                                                                                                    Version 4.1-4 July 2014
Log in to download the original file

OPW15_0194 - Operational Works Application - 6 Hoop Pine Rd.pdf · 11.0 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.