OPW15/0194 - Operational Works Application - 6 Hoop Pine Rd

of 25

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (11.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

    13.   List below all of the forms and supporting information that accompany this application (Include alilDAS
          forms, checklists, mandatory supporting information etc. that will be submitted as part of this application. Note:
          this question does not apply for applications made online using MyDAS)

    Description    of attachment   or title of attachment                                           Method of lodgement to
                                                                                                    assessment manager

    Cover Letter                                                                                    By Mail

    IDAS Form 1 and Checklist 4                                                                     By Mail

    IDAS Form 6 - Building or Operational Work against a planning scheme                            By Mail

    Associated Engineering Drawings by Tod Consulting ref 15633-C01 to C07                          By Mail




114.       Applicant's   declaration

    [;8] By making this application, I declare that all information in this application is true and correct (Note: it is unlawful to
    lrovide false or misleading information)

Notes for completing        this form

•     Section 261 of the Sustainable Planning Act 2009 prescribes when an application is a properly-made application.
      Note, the assessment manager has discretion to accept an application as properly made despite any non-
      compliance with the requirement to provide mandatory supporting information under section 260(1)(c) ot the
      Sustainable Planning Act 2009

Applicant details
• Where the applicant is not a natural person, ensure the applicant entity is a real legal entity.

Question 1
 •  Schedule 3 of the Sustainable Planning Regulation 2009 identifies assessable development and the type of
    assessment. Where schedule 3 identifies assessable development as "various aspects of development" the
    applicant must identify each aspect of the development on Tables A, Band C respectively and as required.

Question 6
• Section 263 of the Sustainable Planning Act 2009 sets out when the consent of the owner of the land is required for
  an application. Section 260(l)(e) ot the Sustainable Planning Act 2009 provides that if the owner's consent is
   required under section 263, then an application must contain, or be accompanied by, the written consent of the
  owner, or include a declaration by the applicant that the owner has given written consent to the making of the
   application. It a development application relates to a state resource, the application is not required to be supported
   by evidence of an allocation or entitlement to a state resource. However, where the state is the owner of the
   subject land, the written consent of the state, as landowner, may be required. Allocation or entitlement to the state
   resource is a separate process and will need to be obtained before development commences.

Question 7
•   If the premises is listed on either the Contaminated Land Register (CLR) or the Environmental
    Management Register (EMR) under the Environmental Protection Act 1994 it may be necessary to
    seek compliance assessment. Schedule 18 of the Sustainable Planning Regulation 2009 identifies
    where compliance assessment is required.

Question 11
• The Building and Construction Industry (Portable Long SeNice Leave) Act 1991 prescribes when the portable long
  service leave levy is payable.
• The portable long service leave levy amount and other prescribed percentages and rates for calculating the levy
  are prescribed in the Building and Construction Industry (Portable Long Service Leave) Regulation 2002.




                                                                                                          IDAS fonn 1-App/icalion delails
                                                                                                                 Version 4.1-4 July 2014
Log in to download the original file

OPW15_0194 - Operational Works Application - 6 Hoop Pine Rd.pdf · 11.0 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.