Council archive · source document
OPW16/0014 - Conditions
1. APPLICATION DETAILS Application No: OPW16/0014 Street Address: Raintree Terraces 3/22 Mitti St NOOSA HEADS QLD 4567 Real Property Description: Lot 3 GTP 1450 Planning Scheme: The Noosa Plan (16 September 2013) 2. DECISION DETAILS The following type of approval has been issued: Development Permit for Operational Work Engineering Works - Footpath 3. RELEVANT PERIOD OF APPROVAL The relevant period for this development approval is 2 years starting the day that this development approval takes effect. 4. ASSESSMENT MANAGER CONDITIONS APPROVED PLANS Development undertaken in accordance with this approval shall be generally in accordance with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions. Plan No. Rev. Plan Description Date Job No:S8500 Sheet: 5-01 B Boardwalk- Pathway Layout, prepared by GEO Consulting 17/02/2016 Job No:S8500 Sheet: 5-02 B Boardwalk- Pathway Framing Schedule, prepared by GEO Consulting 17/02/2016 Job No:S8500 Sheet: 5-03 B Boardwalk- Pathway Elevation, prepared by GEO Consulting 17/02/2016 Job No:S8500 Sheet: 5-04 B Pathway Chainage & Longitudinal Section – Part A, prepared by GEO Consulting 17/02/2016 Job No:S8500 Sheet: 5-05 B Pathway Chainage & Longitudinal Section – Part B,, prepared by GEO Consulting 17/02/2016 Job No:S8500 Sheet: 5-06 B Boardwalk- Lighting Plan, prepared by GEO Consulting 17/02/2016 Job No:S8500 Sheet: 5-07 B Boardwalk- Pathway Foundation Details, prepared by GEO Consulting 17/02/2016 SITE SPECIFIC CONDITIONS Elevated private pathway/boardwalk within the road reserve: To ensure adequate fall protection to all users, the applicant must provide suitable fall protection and lighting to the proposed private footpath within the road reserve generally in accordance with approved plans and in consultation with the supervising engineer. The current owners and any subsequent owners of the property serviced by the proposed pathway are responsible for all ongoing maintenance of the footpath and associated fall protection and lighting to ensure their safety to users. The current owners and any subsequent owners are wholly responsible for all liabilities attributed to the constructed footpath and associated fall protection and lighting *. (*) Refer to property notes. PRIOR TO COMMENCEMENT OF WORKS The principal contractor must have all the appropriate insurance and public liability documentation to carry out the works. The principal contractor is also responsible to ensure that any subcontractors also have the appropriate insurance and public liability documentation. A qualified consulting arborist (minimum level 5 AQF) must be engaged for the duration of the works to supervise tree protection prior to, during and following construction in accordance with AS 4970, Protection of trees on development sites. Council must be contacted at least 5 working days prior to any works commencing to organise a prestart. The contact number to arrange a pre-start meeting is 5329 6244. The pre-start meeting must include the relevant parties for the following aspects of the works: Arboriculture works. Civil engineering works. Prior to requesting a prestart meeting a Tree Protection Bond* of $5,000 must be lodged at Council. *(Refer to Advisory Note) A Construction Management Plan must be submitted to Council prior to the pre-start meeting and must particularly address the following: Providing Traffic Management during all aspects of the construction including: Preparing a Traffic Management Control Plan in accordance with Manual of Uniform Traffic Control Devices (MUTCD) detailing all temporary signage and traffic control measures during the construction phase. Maintenance of safe pedestrian access across the frontage of the site both during daily construction and after daily construction has ceased. Proposed fencing to the site during the construction phase of the development. Providing safe parking arrangements for all machinery, appliances and workers during construction phase without adversely impacting on the traffic flows, traffic safety and the availability of parking spaces along the local streets. No queuing of trucks is permitted on residential streets, especially prior to 7.00am. Any parked trucks must have engines turned off. Maintenance and protection of water quality of stormwater flows and existing drainage lines through the construction site through the implementation of appropriate erosion and sediment control measures. Works programme identifying key components of the works and their respective durations. Establishment of a communication protocol with the general public, adjoining owners and relevant emergency public services to advise of agreed construction times, impacts on traffic and delivery of services and other relevant issues. identification of complaint management procedures including: contact details for the on-site manager dispute resolution procedures DURING CONSTRUCTION General All works shall be supervised by a Registered Professional Engineer of Queensland (RPEQ) who is independent of the Developer and Principal Contractor, and they must certify that all works conform to the Operational Works permit. The integrity and condition of any existing public or Council infrastructure and services (above ground and/or underground) must not be adversely affected by the proposed works. Where applicable, any conflict between the development and an existing utility service must be referred to the relevant service authority for determination prior to commencement of works. The developer must meet any costs to repair damage to any Public or Council asset during construction, where damage is a result of the development works. Damage to assets must be repaired immediately where it creates a hazard to the community. In circumstances where the damage does not create a hazard to the community, it must be repaired immediately on completion of the works associated with the development. All works must be constructed and work procedure undertaken in accordance with: The approved plans and conditions detailed in this Decision Notice. All relevant Noosa Council Planning Scheme Policies, standard drawings, standard specifications and guidelines. The applicable Australian Standards. All works associated with permit must be constructed in compliance with relevant standards and such as to not pose a trip or fall hazards to the public and the intended users. Pathway Construction The proposed boardwalk pathway and associated structures must comply with the following: The pathway must be constructed in accordance with the requirements of the relevant standards and best engineering practice. The pathway must be constructed to ensure pedestrian safety using non-slip materials and have an evenly graded surface finish. Have a minimum distance of 200mm between any existing trees and palms greater than 100mm DBH (Diameter at Breast Height). Any redundant pathway/s must be removed and areas be reinstated. Retention of Existing Trees and Vegetation All trees and vegetation identified for retention must be protected in accordance with AS 4970, Protection of trees on development sites. Rehabilitation after Vegetation Clearing Rehabilitation of cleared areas must be undertaken immediately following completion of the works and result in the area being stable and revegetated in accordance with the approved plans. Stormwater Drainage The construction of the pathway must not cause adverse impact on the existing drainage conditions by creating additional stormwater ponding or concentrating or directing stormwater runoff on other properties or the road formation. Where applicable, any proposed surface drainage grate must be located wholly within private property. Environment (Erosion and Sediment Control) all reasonable and practicable measures must be taken to prevent or minimise erosion and the release and concentration of contamination. The contractor must ensure non-essential exposure of soil is prevented by restricting the extent of works and minimising the duration of soil exposure to adverse weather conditions. Exposed areas must be suitably covered/stabilised/reinstated as soon as practicable and prior to any predicted rainfall occurring. Erosion and sediment control measures must be installed and maintained to minimise erosion on the site and to minimise the export of sediment and associated pollutants from the site, particular attention must be given to prevent sediment from entering into Council’s street stormwater drainage system. The erosion and sediment control measures must be designed, installed and maintained in accordance with current best practice standards (refer to advisory notes). FOLLOWING CONSTRUCTION Certification by a suitably qualified person (eg Building Certifier, registered engineer) that states that the pathway, landing and fall protection are constructed in accordance with best practice methods and the relevant standards must be submitted to Council. This certification must be submitted to Council prior to the final inspection by Council. A final inspection and approval of the new driveway and completed frontage and reinstatement works by Council’s Inspector is required. Please contact Council on 53296244 to arrange for the inspection. 5. REFERRAL AGENCIES Not Applicable. 6. REFERENCED DOCUMENTS Not Applicable. 7. ADVISORY NOTES The following notes are included for guidance and information purposes only and do not form part of the assessment manager conditions: General Advisory Notes As the pathway is a private structure, the property owners and its subsequent owners bear full responsibly for the standard of its construction, maintenance and any liabilities associated with its construction and maintenance. It must be noted that Council will not remove trees or permit the removal of tree in the vicinity to for the pathway/boardwalk for the ongoing use. Council has undertaken an audit check of the Operational Works drawings in relations to the proposed works. A detailed check of the drawings and survey information has not been undertaken, as they have been certified by a RPEQ. The RPEQ bears full responsibility for all aspects of the engineering design. Council reserves the right to require further amendments and/or additions at a later date should design errors become apparent. Prestart, Inspections Request Contact Council on 5329 6244 to arrange a prestart or an inspection giving a minimum of 5 business days notice of preferred inspection time. It should be noted prior to arranging a pre-start meeting the Appeal Period of 20 business days must have passed or the applicant must have provided Council with written confirmation that the applicant has accepted the conditions of Decision Notice and waived their appeal rights. If Council officers are required to undertake additional inspections of the same works, a reinspection fee may apply in accordance with Council’s Fees and Charges register applicable at the time. Council has undertaken an audit check of the Operational Works drawings in relations to the proposed works. A detailed check of the calculations and drawings has not been undertaken, as they have been certified by a RPEQ. The RPEQ bears full responsibility for all aspects of the engineering design. Bond Tree Protection Bond: May be drawn upon by Council if any trees are damaged to the point where they cannot be saved. Will be returned upon receiving certification from the site Arborist that approved works have not caused irreparable damage and/or impacted significantly on the health of the trees. Environmental Advisory notes The Environmental Protection Act 1994 states that a person must not carry out any activity that causes, or is likely to cause, environmental harm unless the person takes all reasonable and practicable measures to prevent or minimise the harm. Environmental harm includes environmental nuisance. In this regard persons and entities, involved in the civil, earthworks, construction and landscaping phases of this development are to adhere to their ‘general environmental duty’ to minimise the risk of causing environmental harm. Erosion and Sediment Control Accepted best practice standards include: the Sunshine Coast Regional Council Manual for Erosion and Sediment Control V1.2 or other superseding document subsequently adopted by Council; Best Practice Erosion and Sediment Control, International Erosion Control Association (2008) Aboriginal Cultural Heritage Act 2003 There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003. The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries out an activity must take all reasonable and practicable measures to ensure the activity does not harm Aboriginal cultural heritage.” It is an offence to fail to comply with the duty of care. Substantial monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions may also be issued by the Land and Resources Tribunal, and the Minister administering the Act can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural heritage or the cultural heritage value of Aboriginal cultural heritage. You should contact the Cultural Heritage Co-ordination Unit on 07 3239 3647 to discuss any obligations under the ACH Act. 8. PROPERTY NOTES The following property notes or similar will be placed against the subject property in Council’s property record system: Owners of the property are responsible for all ongoing maintenance of the private wooden pathway, the associated fall protection (eg railing) and lighting within the road reserve to ensure their safety. Owners are also wholly responsible for all liabilities attributed to the constructed private stairs, fall protection and lighting. 9. PRELIMINARY APPROVAL OVERRIDING PLANNING SCHEME Not Applicable. 10. FURTHER DEVELOPMENT PERMITS REQUIRED Not Applicable 11. SELF ASSESSABLE CODES Not Applicable. 12. SUBMISSIONS Not Applicable. 13. REASONS / GROUNDS FOR APPROVAL DESPITE CONFLICT WITH SCHEME Not Applicable. 14. RIGHTS OF APPEAL You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the Sustainable Planning Act 2009 is attached. During the appeal period, you as the applicant may suspend your appeal period and make written representations to Council about the conditions contained within the development approval. If Council agrees or agrees in part with the representations, a “negotiated decision notice” will be issued. Only one “negotiated decision notice” may be given. Taking this step will defer your appeal period, which will commence again from the start the day after you receive a “negotiated decision notice”. 15. OTHER DETAILS If you wish to obtain more information about Council’s decision, electronic copies are available on line at www.noosa.qld.gov.au, or at Council Offices. Yours faithfully Monkeith Kadhum Development Engineer Enc: Approved Plans/Documents Appeal Rights cc Unitywater
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
OPW16/0014 - ConditionsRelated documentApplication case desk ↗
About this file
- File size
- 51 KB (small file)
- File type
- DOCX
No other editions are linked here.