Original PDF page 15, section 1. The text section number identifies this passage in the reader.
Noosa Council documents
j. Cymbopogan refractus
k. Melaleuca thymifolia
87. Where landscaping/garden beds are proposed adjacent to the bioretention basin, or where
the basin is located adjacent to naturally forested areas, a 900mm deep root barrier must be
installed to the interface between the landscape/garden/forest area and the bioretention
basin to prevent root intrusion to the biobasin infrastructure.
88. Landscaping to the surface of the bioretention basin filter media area must not commence
until 80% of building work within each contributing catchment is complete or after 3 years,
whichever occurs first. An uncompleted works bond of 150% of the value of the planting to
the surface of the bioretention basin filter media area must be provided to Council prior to
the release of the Plan of Survey.
89. Where required, mulch within the batters of bioretention basins must be installed in a manner
that it will not escape into receiving stormwater drainage infrastructure or water courses.
Bioretention Devices - Education
90. The development shall be provided with approved permanent signage to educate the public
on the function of the bioretention basin. The wording for the signage for each bioretention
basin is to include: “BIORETENTION BASIN - This bioretention basin reduces the pollution
of our waterways by reducing the amount of heavy metals, litter, suspended solids, and
nutrients discharged to Lake MacDonald”.
5. REFERRAL AGENCIES
Not applicable.
6. ADVISORY NOTES
The following notes are included for guidance and information purposes only and do not form part
of the assessment manager conditions:
Engineering Notes
1. All private infrastructures for the development must be designed to meet the requirements of
the planning scheme and the relevant service provider unless otherwise agreed by the
relevant authority.
2. Council has undertaken an audit check of the Operational Works drawings in relations to the
proposed works. A detailed check of the calculations and drawings has not been undertaken,
as they have been certified by a RPEQ. The RPEQ bears full responsibility for all aspects
of the engineering design. Council reserves the right to require further amendments and/or
additions at a later date should design errors become apparent.
3. The Setout Tables in the approved plans, their contents and details are not part of Council’s
assessment and approval.
4. Council reserves the right to call up any performance bond held or levy charges against the
property, should emergency works be required to be undertaken by Council to make the work
site safe due to inactivity on the development site for extended periods of time.
5. Prestart Meeting: Contact Council on 5329 6245 to arrange a prestart or an inspection giving
a minimum of 5 business days notice of preferred inspection time.
It should be noted prior to arranging a prestart meeting the Right of Appeal Period of 20
business days should have been passed or the applicant has have confirmed by a letter or
an email that he/she has accepted the conditions of Decision Notice and waived his/her
appeal right.
6. If Council officers are required to undertake additional inspections of the same works, a
reinspection fee will be applicable in accordance with Council’s Fees and Charges register
applicable at the time.
Page 15 of 19
Document Set ID: 20742186
Version: 6, Version Date: 28/11/2018 Print Date: 28 November 2018, 4:15 PM
See the original
The page text is free to read. Viewing or downloading an original file needs an account.