Existing Council MCU RAL and OPW Approval

of 87

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (16.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 45, section 2. The text section number identifies this passage in the reader.

layer
                                                                                                                                                                                                                                                                                                                                                                                with D-Class Grate                                                                                with D-Class Grate                                        with D-Class Grate




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               SW
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  3.     FAWB (Facility for Advancing Water Biofiltration) accredited
                                                                                                                                                                                                                                                                                                                                                                                S.L. - 119.86                                                                                     S.L. - 119.86                                             S.L. - 119.86
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         certification for filtration media to be forwarded to the engineer        10.    Completion of sandy loam filtration media layer
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         prior to placement.
                                                                                                                                                                                                                                                                                    450mm sq Pit                                                                                                                         Proposed stepped bio-retention basin to
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   11.    Flush out points are to be fitted with a fixed inspection opening
                                                                                                                                                                                                                                                                                                                                                                                                                         accept stormwater discharge from all
                                                                                                                                                                                                                                                                                    with D-Class Grate




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       SW
                                                                                                                                                                                                                                                                                                                                                                                                                         building roofs, majority hardstands and                                                                                                                                                                                                                                                                                                                                  4.      Subsoil drainage pipes to be unlocked slotted uPVC laid at 1:200                cap. screw on caps are not acceptable.
                                                                                                                                                                                                                                                                                    S.L. - 119.86                                                                                                                        landscape areas. Refer detail on C01.                                                                                                                                                                                                                                                                                                                                            minimum grade
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             OUTLET 4/5                                                                                                                                                                                                                                                                                            12.    Sandy loam filtration media layers is to be protected by a geofabric
                                                                                                                                                        Rock lined batter.                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        5.     All right angle subsoil pipe bends are to be created using 2x 45°                or approved equivalent for the duration of construction.
                                                                                                                                                                                                                                            OUTLET 9/1                               Existing Stormwater Pit                                  1 in 2 batter.




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          SW
                                                                                                                                                                                                                                                                                     to be removed.                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      bends.




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              SW
                                                                                                               Proposed bio-retention basin to
                                                                                                               accept stormwater discharge from
                                                                                                               all building roofs, majority hardstands

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  SW
                                                                                                                                                                                                                                                       SW




                                                                                                               and landscape areas. Refer detail on C04.                                                                                                                  PIT 3/4                              450Ø RCP at 1.5% below bio-basin.                100Ø slotted underdrain collector         PIT 2/4                                                             Sandstone retaining wall.                       PIT 1/4                                                                                                                                                          SW
                                                                                                               Total surface area = 250m2                                                                                                                                                                      Not shown for clarity. Refer bio-basin           pipes with slotted pipe clean-out
                                                                                                                                                                                                                                                                                                                                                                                                                                                                              Typical along stepped
                                                                                                               Filter media Area - 120m2                                                                                                                                                                       details.                                         risers (capped) at ends. Typical.                                                                                                                                                                                                                                                                        SW
                                                                                                                                                                                                                                                                                                                                                                                                                                                                              bio-retention basin.
                                                                                                                                                                                                      900Ø                  I.L. - T.B.C.                                                                                                                                                                                                                                                                                     SW               SW                         SW                                   SW                              SW
                                                                                                                                                                                            SW                              SW                              SW                SW                      SW                  SW                    SW                  SW                SW                      SW                  SW                   SW                  SW                  SW
                                                                                                                                                                                                                                                                                                                                                                                                                                 450Ø RCP at 1.5% below bio-basin.
                                                                                                                                                                                                                                                                                                                                                                                                                                 Not shown for clarity. Refer bio-basin
                                                                                                                                                                                                      EXISTING PIT 4/4                                                                                                                                                                                                           details.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      Issue    Made By    Date        Description                                                                            PROPOSED COMMERCIAL DEVELOPMENT                                                                                                                                                                                                  Scale : 1:200 AT A1                                                  NOTES:
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      0        PC         06/07/18    Preliminary ONLY - for DA Approval
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             at NO. 5 TAYLOR COURT, COOROY
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           REVISION




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      A        PC         06/07/18    Issue for BA                                                                                                                                                                                                                                                                                                            Job No.: 18-0165                                                     1. Do not scale drawings.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   2. Scale is correct at A1.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      B        PC         19/10/18    SW tanks changed to blockwork                                                          CLIENT: HASS HOLDINGS PTY LTD
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              Dwg No.: C03                                                         3. Check and verify all dimensions
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      C        BJW        O6/11/18    Bio-basins updated                                                                     Designed By : B.J. WINNING BEngTech (Civil)                        Drawn By : PC                  Date : 29/05/18                                                                                                                                                                                       prior to commencement of work.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      D        BJW        O7/11/18    General amendments                                                                     Certified By : B.R. CROMAR BEng (Civil), MIEAust, CPEng, RPEQ, NPER                               Date : 11/09/18                              Ph: (07) 5444 5578    Email: [email protected]                       STORMWATER DRAINAGE

Document Set ID: 20742236
Version: 1, Version Date: 28/11/2018                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   Print Date: 28 November 2018, 4:15 PM
Log in to download the original file

Existing Council MCU RAL and OPW Approval.pdf · 16.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.