Original source · versioned page text
Existing Council MCU RAL and OPW Approval
Very large file (16.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 45, section 2. The text section number identifies this passage in the reader.
layer
with D-Class Grate with D-Class Grate with D-Class Grate
SW
3. FAWB (Facility for Advancing Water Biofiltration) accredited
S.L. - 119.86 S.L. - 119.86 S.L. - 119.86
certification for filtration media to be forwarded to the engineer 10. Completion of sandy loam filtration media layer
prior to placement.
450mm sq Pit Proposed stepped bio-retention basin to
11. Flush out points are to be fitted with a fixed inspection opening
accept stormwater discharge from all
with D-Class Grate
SW
building roofs, majority hardstands and 4. Subsoil drainage pipes to be unlocked slotted uPVC laid at 1:200 cap. screw on caps are not acceptable.
S.L. - 119.86 landscape areas. Refer detail on C01. minimum grade
OUTLET 4/5 12. Sandy loam filtration media layers is to be protected by a geofabric
Rock lined batter. 5. All right angle subsoil pipe bends are to be created using 2x 45° or approved equivalent for the duration of construction.
OUTLET 9/1 Existing Stormwater Pit 1 in 2 batter.
SW
to be removed. bends.
SW
Proposed bio-retention basin to
accept stormwater discharge from
all building roofs, majority hardstands
SW
SW
and landscape areas. Refer detail on C04. PIT 3/4 450Ø RCP at 1.5% below bio-basin. 100Ø slotted underdrain collector PIT 2/4 Sandstone retaining wall. PIT 1/4 SW
Total surface area = 250m2 Not shown for clarity. Refer bio-basin pipes with slotted pipe clean-out
Typical along stepped
Filter media Area - 120m2 details. risers (capped) at ends. Typical. SW
bio-retention basin.
900Ø I.L. - T.B.C. SW SW SW SW SW
SW SW SW SW SW SW SW SW SW SW SW SW SW SW
450Ø RCP at 1.5% below bio-basin.
Not shown for clarity. Refer bio-basin
EXISTING PIT 4/4 details.
Issue Made By Date Description PROPOSED COMMERCIAL DEVELOPMENT Scale : 1:200 AT A1 NOTES:
0 PC 06/07/18 Preliminary ONLY - for DA Approval
at NO. 5 TAYLOR COURT, COOROY
REVISION
A PC 06/07/18 Issue for BA Job No.: 18-0165 1. Do not scale drawings.
2. Scale is correct at A1.
B PC 19/10/18 SW tanks changed to blockwork CLIENT: HASS HOLDINGS PTY LTD
Dwg No.: C03 3. Check and verify all dimensions
C BJW O6/11/18 Bio-basins updated Designed By : B.J. WINNING BEngTech (Civil) Drawn By : PC Date : 29/05/18 prior to commencement of work.
D BJW O7/11/18 General amendments Certified By : B.R. CROMAR BEng (Civil), MIEAust, CPEng, RPEQ, NPER Date : 11/09/18 Ph: (07) 5444 5578 Email: [email protected] STORMWATER DRAINAGE
Document Set ID: 20742236
Version: 1, Version Date: 28/11/2018 Print Date: 28 November 2018, 4:15 PM
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.