Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

Existing Council MCU RAL and OPW Approval

of 87

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (16.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 51, section 1. The text section number identifies this passage in the reader.

Noosa Council documents




                                               General Notes
                                               NOTE: This landscape plan must be read in conjunction with the appropriate                    TOPSOIL                                                                                MAINTENANCE TASKS
                                               statutory approvals and Australian Standards.                                                 ·   Collect topsoil sample(s) and have it tested by a NATA Certified Lab for           ·  Landscape Construction Contractor to maintain whole of landscape works for
                                                                                                                                                 horticultural suitability, i.e. planting trees and turf. Furnish test results to      establishment period of 13 weeks and hand over to Owner once completed.
                                               GENERAL                                                                                           Landscape Architect.                                                               ·  Maintain landscape streetscape works for an additional 39 week period to
                                               ·  For more detail refer to the project architect's and engineer's drawings.                  ·   Cultivate garden and turf areas 150mm deep.                                           complete Council's standard 52 week On-maintenance Period and hand over
                                                                                                                                             ·   Ameliorate subgradse and site topsoils per testing results.                           to Council once completed.
                                               ·    Planting shown reflects the design intent, exact numbers and locations will              ·   Install ameliorated site topsoils or approved imported topsoil that complies       ·  The following tasks are to be actioned during Establishment and in Perpetuity;
                                                    require confirmation on site by the superintendent. Any changes to be made                   with MRTS 16 (Main Roads Technical Specification) to planting areas if
                                                    to the landscape plan must be approved by the landscape architect and                        ameliorated site topsoil is not available.                                         Irrigation and Watering
                                                    superintendent.                                                                          ·   All soil stockpiles are to be maintained to control weeds routinely and guard      ·     Every day for the first two weeks (unless it rains adequately)
                                                                                                                                                 against dispersion by wind or water. Stockpiles shall be limited to a maximum      ·     Every 2-3 days during the balance of the establishment period or as needed if
                                               ·    All landscape plans presented assume that all base and survey information is                 height of 2m and may require covering or retaining. Stockpiles are not                   hot and dry (unless it rains adequately).
                                                    accurate and to scale. The contractor shall check landscape plans presented                  permitted within close proximity to residential properties.                        ·     Once a week there after.
                                                    for any discrepancies with the existing site conditions or other drawings                ·   Generally soil to be used shall comply with the following specification;
                                                    presented prior to any construction work taking place. If discrepancies do               (1) friable and free draining sandy loam                                               Turf Mowing
                                                    occur these shall be highlighted at once to the superintendent prior to any              (2) good texture and structure for selected use                                        ·    First Mow - Once after 10 days if there is rapid growth or 14 days after
                                                    construction work taking place. Dimensions take precedence.                              (3) acceptable conductivity and pH levels for specified plants                              installation.
                                                                                                                                                                                                                                    ·    Mowing Thereafter - Once a week during summer, once every two weeks in
                                               THE CONTRACTOR SHALL:                                                                         CONCRETE                                                                                    spring and autumn, and once a month in winter or as required if there is a lot
                                               ·   Install silt control and vegetation protection fencing as required.                                                                                                                   of growth or as desired.
                                               ·   Remove all unwanted material from landscape work area.                                    EDGING
                                               ·   Confirm all dimensions on site prior to construction.                                     ·   Install Timber Garden Edging to all individual and grouped street trees as per     Turf Trimming
                                               ·   Seek instruction from superintendent where level discrepancies, specification                 Finishes Schedule and Detail.                                                      ·    As required. Maintain 5mm gap between turf and hard surfaces.
                                                   substitutions and poor soil structure occurs.
                                                                                                                                             MULCH                                                                                  Additional Maintenance Tasks
                                               SERVICES                                                                                      ·  All mulch proposed to be used on site shall be free of deleterious materials        ·   Weed removal and wick wiping: As required to reduce competition and
                                               ·   The contractor shall confirm the location of all services with relevant                      and foreign matter including anthropogenic waste, rock, soil, sediment                  seeding.
                                                   authorities prior to planting and excavation.                                                contamination, weeds and sticks.                                                    ·   Plant Replacement: Immediately replace plants that die or fail to thrive, are
                                                                                                                                             ·  Mulch garden areas 100mm deep settled, keeping 50mm clear of plant stems,               damaged or stolen, with plants of the same species and of similar size and
                                               DRAINAGE                                                                                         to ensure site water conservation requirements are achieved.                            quality unless otherwise specified.
                                               ·   Ensure drainage works correlate with adjacent land and specified finished                                                                                                        ·   Stakes and Guys: Adjust and/or replace stakes and ties where required.
                                                   levels.                                                                                   GENERAL PLANTING                                                                           Remove staking and guying when instructed by the superintendent.
                                                                                                                                             ·  Plant stock is to be approved by contractor and qualified arborist prior to         ·   Re-mulching: As required to maintain a consistent depth, 100mm settled, until
                                               GRADES                                                                                           acceptance of delivery.                                                                 plants are established.
                                               ·  Site shall be positively drained, i.e. no ponding areas, 2% minimum to pits or             ·  For planting, excavate garden areas to a depth of 300mm, cultivate subgrade         ·   Trim / prune plants to remove dead, dying and diseased growth and for
                                                  legally sheet flowing off-site.                                                               to a depth of 150mm and treat as per soils testing results.                             character and form as required.
                                               ·  Mulched garden bed areas should not exceed a 1:3 grade and turf areas should               ·  Install ameliorated site topsoil or specified topsoil 300mm deep, settled, and      Monitoring: Provide a monthly report on completed tasks.
                                                  not exceed a 1:4 grade.                                                                       mulch as specified.
                                                                                                                                             ·  No synthetic, granular blended fertilisers to be used on site. Slow release         WARRANTIES
                                                                                                                                                organic tree tablets shall be used at establishment.                                ·  Warranties or guarantees specified shall name the Principal as warrantee.
                                                                                                                                             ·  All plantings shall incorporate the inclusion of a slow release native plant           Register with manufacturers as necessary. Retain copies delivered with and
                                                                                                                                                fertilizer (as per manufacturers specification) and the use of a soil moisture         components and equipment to the Principal.
                                                                                                                                                retention additive (as per manufacturers specification), placed adjacent the        ·  Warranties and/or guarantees to be submitted to the Superintendent for
                                                                                                                                                plant root ball at the time of planting.                                               transmission to the Principal within fourteen (14) days after practical
                                                                                                                                             ·  Trees >25 Litre Bags are to be certified by a qualified arborist as NATSPEC            completion.
                                                                                                                                                compliant prior to delivery to site. Qualified arborist to select NATSPEC           ·  Commence Warranty periods at practical completion or at acceptance of
                                                                                                                                                compliant trees at nursery and check on delivery to site. Furnish certification        installation, if acceptance is not concurrent with practical completion.
                                                                                                                                                to superintendent and landscape architect prior to practical completion.            ·  If installation is not by manufacturer and product warranty is conditional on
                                                                                                                                             ·  Do not install trees within:                                                           the manufacturer's approval of the installer, submit the manufacturer's
                                                                                                                                             -  1m of underground services                                                             written approval of the installing firm.
                                                                                                                                             -  1.5 of sewers, horizontally and vertically
                                                                                                                                             -  3m of driveway crossovers                                                           CERTIFICATIONS
                                                                                                                                             -  4m of street lights and power poles                                                 ·   Provide NATSPEC, MRTS 16 Topsoil, Mulch, and Turf certifications to
                                                                                                                                             -  5m of bus stops - departure side                                                        superintendent and landscape architect prior to practical completion.
                                                                                                                                             -  15m of bus stops - arrival side
                                                                                                                                                                                                                                    SOURCES
                                                                                                                                             TURF AREAS                                                                             ·  Survey - Project Urban
             Information Request Response




                                                                                                                                             ·  Excavate turf areas to a depth of 150mm, cultivate subgrade to a depth of           ·  Civil Engineering - HR Design
                                                                                                                                                150mm and treat as per soils testing results.                                       ·  Architecture - Rhad Leonardi
                                                                                                                                             ·  Install 150mm of ameliorated site topsoil or imported topsoil as specified.
                                                                                                                                             ·  Finished turf grades/contours to be generally smooth, coordinate on site with
                                                                                                                                                superintendent and ensure levels are approved prior to turfing.
                                                                                                                                             ·   Turf laid on low side of hard surfaces shall be 20mm below adjacent hard
                                                                                                                                                surface to not impede storm water flow.
                                                                                                                                             ·  Supply and lay turf as indicated on the drawings.
                                                                                                                                             ·  Water turf in well and refer to suppliers maintenance requirement for
                                                                                                                                                establishment.
                                                                                                                                             ·  Apply water to maintain soil moisture until established during maintenance




                                                                                                                                                                                                                                                                                                                                                                             MCU18/0120 RAL18/0013 OPW18/0197
                                                                                                                                                periods to maintain vibrant green turf colour and health.




                                                                                                                                                                                                                                                                                                                                                                                     APPROVED PLAN
                                                                                                                                                                                                                                                                                                                                                                                     NOOSA COUNCIL


                                                                                                                                                                                                                                                                                                                                                                                        21 NOV 2018
                                                                                                                                                                                                                                                                                                                                                                         -
                                                                                                                                                                                                                                                                                                                          PROJECT. NO.               LANDSCAPE ARCHITECTURE
                                                                                                        SCALE                                                                                                                                                                                                                                                  URBAN DESIGN

                                                                                                        A1 NA
                                                                                                                     © COPYRIGHT
                                                                                                                     This drawing is copyright and the property of James Birrell Design Lab
                                                                                                                                                                                              Hass Holdings Pty Ltd
                                                                                                                                                                                              Client
                                                                                                                                                                                                                                                                        Lot 5 Taylor Court, Cooroy
                                                                                                                                                                                                                                                                        Project Address
                                                                                                                                                                                                                                                                                                                          254 1718
                                                                                                                                                                                                                                                                                                                                                           FURNITURE DESIGN

                                                                                                                                                                                                                                                                                                                                                              56 Sixth Avenue
           12.11.18   D                     INFORMATION REQUEST RESPONSE                 BB      JB     A3 NA        and must not be retained, copied, reproduced or used without prior                                                                                 Landscape Documentation Package                   DWG. NO.       ISSUE         Maroochydore Qld 4558
           08.11.18   C                     INFORMATION REQUEST RESPONSE                 BB      JB                  written authority. Do not scale from PDF plans.
           24.07.18
           18.07.18
             Date
                      B
                      A
                    Issue
                                            OPERATIONAL WORKS
                                            OPERATIONAL WORKS
                                                            Description
                                                                                         BB
                                                                                         BB
                                                                                                 JB
                                                                                                 BB
                                                                                        Drawn Checked
                                                                                                                                                                                                                                                                        GENERAL NOTES                                     L002           D
                                                                                                                                                                                                                                                                                                                                                                (07) 5443 2069
                                                                                                                                                                                                                                                                                                                                                      [email protected]
                                                                                                                                                                                                                                                                                                                                                 www.jamesbirrelldesignlab.com


Document Set ID: 20742236
                  20733355
Version: 1, Version Date: 28/11/2018
                          12/11/2018                                                                                                                                                                                                                                                                                                                                              Print Date: 28 November 2018, 4:15 PM
Log in to download the original file

Existing Council MCU RAL and OPW Approval.pdf · 16.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.