Council archive · source document
Road Assessment_compressed · MCU22/0052
Figure 1 Proposed subdivision and access point locations
2. Road Formation
Eastern Branch Road commences from the Pomona Kin Kin Road approximately 3.4km
to the north. The Pomona Kin Kin Road is a sealed road while the full length of the
Eastern Branch Road is a gravel formation that terminates at a dead end
approximately 550m to the south of the project site. There are several creek crossings
along the Eastern Branch Road of which some are concreted. The road formation at
the frontage of the project site is a gravel formation of approximately 5m to 5.3m in
width. There is also opportunity for vehicles to pass at the site entrance without any
modifications.
There are scattered mature trees on the both the eastern and western side verges. All
vegetation along the road frontage is clear of the formation and does not appear to
pose a risk for vehicle sight stopping distance.
3. Recommended Improvements
It is considered that the gravel formation of the Eastern Branch Road at the site
frontage is in fair condition with some minor erosion and scour visible.
A drainage path is noted across Eastern Branch Road and appears to have formed
from the adjacent property access. While this does not appear to pose a significant
risk to road users, the frontage could benefit from reshaping to prevent such scour
and a new gravel surface laid as part of council’s ongoing maintenance programme.
Page 2 of 5
2261 david low way, peregian beach, qld 4573 acn: 626671092 [email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Road Assessment_compressed.pdfRelated documentApplication case desk ↗
About this file
- File size
- 807 KB (small file)
- File type
No other editions are linked here.