15 December 2020                                                                                 Project No. 20332-001-Rev0

Total Concept Homes
Attention: Mr Tim English

Email: [email protected]
Copy to: Mr John Gillespie, CadCon Surveying & Town Planning ([email protected])


SLOPE STABILITY ASSESSMENT
PROPOSED SUBDIVISION
108 BLACK MOUNTAIN RANGE ROAD, BLACK MOUNTAIN


Dear Tim,

1.0     INTRODUCTION
As requested, Tectonic has undertaken a slope stability assessment for a proposed residential subdivision
at 108 Black Mountain Range Road, Black Mountain. This report presents the results of our slope stability
assessment, together with geotechnical advice for the development. In summary, subject to
implementation of the recommendations made herein, it is assessed that there would be a Low Risk of
slope instability affecting the proposed development in accordance with the Australian Geomechanics
Society Guidelines for Landslide Risk Management, dated March 2007 (AGS 2007).

1.1    Details of Site and Development

The subject site is described as Lot 2 on RP131369 and covers a total area of 59,774 m2. The site has
frontage to Black Mountain Range Road to the western boundary. The surrounds feature similar rural
residential blocks to the north, east and south. Text Figure 1 below illustrates the site position. A detailed
description of the site features is given in Section 2.




                                                                       Approx. site of proposed residence




                                               Existing residence

                                                                                                Existing Lot boundary


Text Figure 1: 2019 Aerial Image of site and surrounds (courtesy Noosa Council [NC] Interactive Maps)




                                                     Tectonic Geotechnical Pty Ltd
                                                    PO Box 899, Buderim, QLD 4556
                                        Office: 07 5478 9016 Email: [email protected]
                                                        www.tectonicgeo.com.au
                                                          A.B.N. 83 165 727 828
Log in to download the original file

Appendix G - Geotechnical Report.pdf · 6.0 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 32 pages

Page 2

Total Concept Homes                                                                                       20332-001-Rev0
                                                                                                        15 December 2020

We have been supplied with a proposed layout plan for the subdivision by Alta Projects (Ref. Alta, Job No.
A6578/20, Dwg. No. A6578/20/P01 to P04), which indicates that it is proposed to retain an existing residence
on a larger portion of the existing allotment extending to the east and south-east. The north-western portion
of the allotment would be divided from the existing allotment, where a new residence would be located.

Drawings show that an existing access for the house would be upgraded, initially being shared between the
two future allotments off Black Mountain Range Road to the west; before splitting along the proposed
southern boundary of the new lot, extending to the position of the future residence.

Sections provided as part of the drawing package show that much of the driveway alignment would be at
grade with the existing track, with filling of up to 1.5 m height required towards the central area of the
alignment. The fill would be retained, and it is understood that the primary design option being considered is
gabion baskets. Some minor cutting is expected on the upslope side of the driveway to the eastern side of
the alignment.

The property does not have access to mains sewerage or a piped, potable water supply, and therefore
collection of rainwater in tanks and on-site disposal of effluent will be required.

An extract of the design drawings is given below in Text Figure 2.

                                                             Indicative area for proposed future residence




                                                    Proposed subdivision boundary




                                                                                                             Driveway alignment
                                                                  Existing Lot boundary




Text Figure 2: Extract of overall subdivision layout (LHS); and driveway alignment to future residence (courtesy Alta)


1.2    Method and Scope of Investigation
As part of our slope stability assessment, a desk-top study was carried out comprising a review of
published geological maps, aerial photos, and a site classification report prepared by Ground Drill also
prepared a report to address on-site effluent disposal design and feasibility. Both reports are attached (Ref.
Job No. 20/373, dated 3 December 2020).

A walk-over survey was conducted in order to make an appraisal of the general condition of the site in
regard to topography, drainage, vegetation cover, geology, erosion and slope stability and existing
structures. The walk-over survey was carried out by an experienced engineering geologist from Tectonic
on 26 November 2020 concurrent with the drilling by Ground Drill.

The results of the desk-top study and walk-over survey are included in Section 2 below.

1.3    Qualifications of Responsible Engineer
This report has been reviewed by Mr Ashley Davey, an RPEQ with more than 25 years’ experience in
geotechnical engineering, including a number of slope stability projects.




                                                           2/14

Page 3

Total Concept Homes                                                                                        20332-001-Rev0
                                                                                                         15 December 2020

2.0      DESCRIPTION OF EXISTING CONDITIONS
2.1    Geology and Subsurface Conditions
The 1:100,000 scale Gympie Special Geological Map 1 (Ref. Text Figure 3 below) indicates that the site is
underlain by materials derived of the early to middle Triassic age Kin Kin Beds (pale green blue shading),
which are described as “arenite, argillite and phyllite.”




                                                         Approx. site location




Text Figure 3: Extract of Gympie Special Geology Map
The Ground Drill investigation comprised drilling of two boreholes (designated BH1 and BH2) to the north
and south of the approximate proposed residence on the future divided allotment, with an additional borehole
(denoted borehole BH6) drilled to capture part of the driveway alignment to the east. Boreholes BH1 and
BH2 were terminated in the underlying weathered rock at a target depth of 2 m below ground level (BGL);
with borehole BH6 extending to auger drilling refusal at 2.5 m BGL.
Additional shallow boreholes were also drilled to the east of the prosed residence on the future allotment, to
provide information for the on-site effluent disposal design. These were taken to a target depth of 1.5 m BGL.
All boreholes were drilled using a 4WD utility mounted drill rig, with solid flight augering equipment. In situ
strength testing comprised the dynamic cone penetrometer (DCP) method, taken from surface adjacent and
at selected depths downhole.
The subsurface profile logged in each of the boreholes was relatively consistent, and comprised the profile
indicated on the following page:




1
 State of Queensland, Department of Mines and Energy, Nambour Special 1:100,000 Geological Series, Sheet 9445 and Part 9545,
First Edition 1999




                                                             3/14

Page 4

Total Concept Homes                                                                                  20332-001-Rev0
                                                                                                   15 December 2020

          An upper layer of residual, medium plasticity, stiff silty clays to between 0.6 m and 0.7 m BGL;
           overlying;
          Extremely weathered (XW) material comprising stiff to very stiff silty clays, to between 1 m and
           1.4 m BGL; then grading to
          Weathered Phyllite, inferred to be very low to low strength to the borehole termination/target
           depths.

Groundwater seepage was not encountered during the drilling of either borehole BH1 or BH2, with all
soils being described as “dry.”
The site was classified by Ground Drill as Class P in accordance with AS2870-2011 due to the presence
of mature trees. In not for this factor the site would have been classified Class M with characteristic
surface movements (ys) of up to 35 mm reported by Ground Drill.

Along the southern edge of the existing access track, and in the cutting behind the existing residence
exposures of weathered rock were observed. These were noted to consist of moderately weathered, very
low to low strength, pale yellow brown phyllite; which had a well developed foliated fabric. To the south-
east of the existing residence this was interlayered with XW materials, although the lateral extent of this
was not clear, and such materials may be restricted to the near-surface of the exposed rock mass.

A view of the exposed weathered rock above the highest section of proposed earthworks filling is shown
below in Text Figure 4.




Text Figure 4: Exposed weathered phyllite in cutting above highest section of earthworks filling

2.2       Topography
As illustrated in Text Figure 5 on the following page, the wider area around the site consists of a series of
approximately parallel ridgelines and gullies, aligned east-west. The ridgelines within the subject allotment
lead east from Black Mountain Range Road, which traces a crest forming a drainage divide between
eastward and westward draining creek lines.

Just off Black Mountain Range Road, to the south-west of the overall existing allotment, a rounded gully
head was present, with sideslopes ranging from about 25° (47 %) at the site entrance to between 15° and
20° (27 % and 36 %) nearer the existing residence. Minor existing cut and fill earthworks had been
undertaken sidelong to the slope to facilitate the existing track, being 1 m to 1.5 m depth and around 1 m
height respectively. Below the existing residence, to the north, a series of cut terraces had been formed for
horticultural purposes. These were in the order of 2.5 m width, with cut batters of around 0.6 m depth or less.
Across the existing earthworks features on site, no signs of significant slumping were observed.




                                                           4/14

Page 5

      Total Concept Homes                                                                                     20332-001-Rev0
                                                                                                            15 December 2020

      The proposed subdivision boundary runs south-west to north-east across the site, just off the southern edge
      of a spur. The proposed residence on the future allotment would be sited on this spur, with the top sloping at
      around 5° (9 %) to the north and south, then extending to 9° to 10° (16 % to 18 %) around mid slope; and
      steepening further to around 20° (36 %) around 30 m downslope of the residence. Slopes were noted to
      increase consistently, with no irregular surface features observed which would indicate slope instability.




Initial gully forming off Black Mtn Range Rd




                                                                                         Overall existing lot boundary




      Text Figure 5: Image showing ground surface contours (courtesy NC Interactive Maps)

      Text Figures 6 and 7 below illustrate the site conditions at the time of our inspection.



                                                               Drill rig
                                                                                      Large trees to west of proposed residence




      Text Figure 6: View looking south over area of proposed residence (drill rig at borehole BH1)


                                                                                                       Ground sloping at 15° to 20°




                                          XW to moderately weathered
                                          phyllite exposed in cut




      Text Figure 7: View looking west over existing access alignment, where fill is proposed highest on new driveway




                                                                           5/14

Page 6

Total Concept Homes                                                                           20332-001-Rev0
                                                                                            15 December 2020

2.3    Groundwater
No signs of groundwater seepage (‘springs’) were observed during our walk-over, and neither was any
seepage encountered during borehole drilling. Groundwater conditions may vary seasonally, and could
rise to shallower depths, particularly following periods of prolonged or heavy rainfall.

2.4    Surface Drainage
Broadly, the natural surface drainage follows the ground surface contours, which over the proposed
development areas tended to fall to the north. Surface water flows affecting the proposed residence and
eastern part of the driveway alignment would be considered negligible, given the topographical position
towards the crest of a well developed spur. The natural ground does rise above the western part of the
driveway alignment, where a catchment over the area of an existing residence may proliferate.

No significant erosion was noted during our walkover inspection.
Surface water is expected to drain well from the site considering the moderate to steep natural gradients
and low permeability of the soils in the immediate subsurface, and relatively shallow depth to rockhead.

2.5    Vegetation
The immediate periphery of the proposed driveway consisted of periodically slashed grass, which was quite
long at the time of our inspection. Small to medium size mature trees were noted on the sloping ground to
the north of the proposed driveway, which were observed to be relatively ‘plumb’.

Around the area of the proposed residence, slashed grass was also present over most of the area, with
some large mature trees just to the west of the proposed building location. These were also noted to be
quite straight at the time of our inspection, with no tilting or distorted growth present, which can be an
indicator of slope instability.

2.6    Buildings and Other Structures
The existing residence comprised a one storey, low set, masonry walled structure, constructed over a cut
and fill earthworks pad. The residence was mostly on cut to the south, which ranged up to around 1.5 m
depth. Fill on the northern side of the residence was supported by a grouted rock wall and ranged up to 2 m
height. The grouted rock facing supporting the fill did not show any signs of global instability having affected
the structure; with the residence generally being in good structural condition, other than some minor cracking
to the concrete apron to the slab. It was noted that the cracking was coincident with the daylighting point for
underslab pipework (assumed to be for wastewater and water).

Although not within the subject site, a retaining wall was present along the south-western boundary, which
would be adjacent to the proposed driveway access. This was estimated to be in the order of about 4 m
height, and was constructed of large concrete blocks, spread over two tiers. This is shown below in Text
Figure 8.




Text Figure 8: Looking south-west over retaining wall on neighbouring allotment

It was presumed that this had been recently constructed, and it was not clear whether upslope surface water
flows were being captured by the structure, and if so, where discharge was being directed to.




                                                          6/14

Page 7

Total Concept Homes                                                                            20332-001-Rev0
                                                                                             15 December 2020

3.0     ASSESSMENT OF LAND STABILITY
3.1   Existing Conditions
The crest area of the spur running south-west to north-east through the site, which incorporates the area of
the existing residence, and the proposed residence on the future subdivided allotment allotment has been
mapped by NC as presenting a Low/Very Low landslide susceptibility (clear/no shading). However the initial
flanks of the crest are mapped as a Moderate hazard area (pale yellow brown shading), which does cover a
part of the proposed building envelope for the future residence, and the driveway alignment. Towards the
inverts of gullies away from construction areas, High risk areas have been assigned (pale orange shading).
An extract of the NC mapping is given below in Text Figure 9.



                                                                                  Overall existing Lot boundary




Text Figure 9: Extract from NC Landslide Hazard Mapping

It should be noted that the NC map is a broad-scale indication of the potential landslide susceptibility only,
largely based on ground slope, and is superseded by this site specific assessment.

The site does not exhibit any indicators of global, natural slope instability. No landslide back scarps or
areas of natural ‘hummocky’ ground were observed, the existing structures on site were in good condition,
with no significant erosion or slumping observed over the existing access track alignment, or other minor
earthworks features (e.g. horticultural terraces). In addition the subsurface conditions were favourable
with stiff to very stiff soils present from surface, and weathered phyllite rock logged at relatively shallow
depth in both the boreholes and exposed in earthworks cuttings.

3.2   Qualitative Stability Assessment
The risk assessment for this project has been carried out following AGS 2007 Practice Note Guidelines for
Landslide Risk Management. Relative levels of risk and their implications are given in Table 1 on the
following page and the Qualitative Terminology for Use in Assessing Risk to Property is also attached.




                                                          7/14

Page 8

Total Concept Homes                                                                                 20332-001-Rev0
                                                                                                  15 December 2020

Table 1: Stability Risk Levels
 Risk Level           Example Implications(1)
                      Unacceptable without treatment. Extensive detailed investigation and research, planning
       Very High
 VH                   and implementation of treatment options essential to reduce risk to Low; may be too
       Risk
                      expensive and not practical. Work likely to cost more than value of property.
                      Unacceptable without treatment. Detailed investigation, planning and implementation of
 H     High Risk      treatment options required to reduce risk to Low. Work would cost a substantial sum in
                      relation to the value of the property.
                      May be tolerated in certain circumstances (subject to regulators’ approval) but requires
       Moderate
 M                    investigation, planning and implementation of treatment options to reduce risk to Low.
       Risk
                      Treatment options to reduce to Low risk should be implemented as soon as practicable.
                      Usually acceptable to regulators. Where treatment has been required to reduce the risk
 L     Low Risk
                      to this level, ongoing maintenance required.
       Very Low
 VL                   Acceptable. Manage by normal slope maintenance procedures.
       Risk
 Note: (1) The implications for a particular situation are to be determined by all parties to the risk assessment and
 may depend on the nature of the property at risk; these are only given as a general guide.



Considering the existing site conditions (Ref. Section 2), and proposed development works, it is assessed that
there would be a Low (L) Risk of global slope instability affecting the proposed development subject to the
implementation of recommendations given below. Regulators (NC) normally require that a Very Low or Low
Risk of landslide affecting the property must be demonstrated to enable development approval. Summarised
in Table 2 on the page below is our qualitative assessment of landslide risk for the site. A summary of
qualitative terminology for use in assessing risk to property is attached (taken from AGS 2007).




                                                         8/14

Page 9

Total Concept Homes                                                                                      20332-001-Rev0
                                                                                                       15 December 2020

Table 2: Details of Qualitative Risk Assessment for Property (AGS 2007
                                                              Assessed
 Hazard                            Likelihood   Consequence
                                                                Risk
                                                                         Comments

                                                                         The driveway alignment exploits an existing track in
                                                                         some parts, and although the central portion of the
                                                                         driveway is proposed sidelong to a moderately
                                                                         steep slope; given the presence of stiff to very stiff
                                                                         residual soils and XW materials from surface, no
 1: Proposed driveway -                                                  evidence of existing instability (including relatively
shallow failure through existing                                         good performance of existing fill embankments),
natural soil materials (fill        Unlikely       Minor          Low    apparent lack of shallow groundwater, and the
subgrades or earthworks cuts);                                           proposed engineer designed retention of future fill
or future fill materials                                                 for the driveway, it is considered Unlikely that a
                                                                         landslip would develop, subject to implementation of
                                                                         the recommendations in Section 4 (e.g. foundations
                                                                         levels and fill quality). Given a potential Medium
                                                                         impact from such shallow instability the resultant risk
                                                                         would be Low as per AGS 2007.



                                                                         Given the presence of stiff residual soils at surface,
                                                                         and stiff to very stiff XW materials below at shallow
                                                                         depth, the rounded nature of the spur crest where
                                                                         construction is proposed, and negligible catchment
 2: Proposed residence on
                                                                         for water above the site and apparent lack of
subdivided Lot - Failure
                                                                         groundwater, and no evidence of existing instability
through natural soils or XW         Unlikely      Medium          Low
                                                                         in the vicinity of the proposed residence, it is
materials above the foundation
                                                                         considered Unlikely that a landslip would develop,
depth
                                                                         subject to implementation of the recommendations
                                                                         in Section 4. With a potential Medium impact from
                                                                         such shallow instability the resultant risk would be
                                                                         Low as per AGS 2007.




                                                                         The likelihood of a deep failure through the weathered
                                                                         phyllite rock below the foundation depth is assessed
 3: Proposed residence on
                                                                         as Barely Credible due to the strength of these
subdivided Lot, or proposed
                                    Barely                               materials, no evidence of existing instability, and
driveway alignment - Deep                          Major      Very Low
                                   Credible                              relatively consistent nature of the sloping ground
seated failure in weathered rock
                                                                         across the development area. Although the
below the foundation depth
                                                                         consequence of such a failure could be Major, the
                                                                         resultant risk is Very Low as per AGS 2007.




The potential impacts on slope stability of the development components have been assessed, and the
measures recommended below in Section 4 have been designed to mitigate those impacts.




                                                           9/14

Page 10

Total Concept Homes                                                                             20332-001-Rev0
                                                                                              15 December 2020

4.0        RECOMMENDATIONS
General recommendations to help maintain the stability of the site are given in the document Some
Guidelines for Hillside Construction, which is attached. This document should be referred to by those
preparing the concept and designs for future residential development at the site.

4.1       Site Layout and Geotechnical Constraints
Preliminary operational works plans (Ref. Section 2) were available for review at the time of this assessment,
however no bulk earthworks or building design details were are available regarding the proposed residence.
We understand that future building works would be located proximal to the area indicated in Text Figure 2
(not including areas for effluent disposal).

There should generally be no limitations on the methodology adopted for the future residence e.g. low set or
high set construction, or a split level structure built ‘in to’ the existing slope profile, however earthworks
should be limited to cut and fill of up to 1.5 m high/depth.
The general building location denoted in Text Figure 2 on the future subdivided allotment are considered
suitable from a slope stability viewpoint, although this should not encroach on the break of slope present to
the north and south, where ground slopes around 20° (36 %) were noted. Tectonic must be consulted to
assess the impacts on slope stability if development is proposed elsewhere on the site or if cut or fill
earthworks are to exceed 1.5 m in height/depth for the residence.

For the proposed driveway alignment, given the moderately steep to steep ground slopes present over
ground to the northern edge, all fill embankments >0.5 m height should be retained, and this is shown as the
intent on the supplied drawings (Ref. Section 2).

4.2       Earthworks
In construction areas, all vegetation, tree stumps and large roots must be ‘grubbed out’, existing uncontrolled
fill (e.g. along the proposed driveway alignment) with any organic rich topsoil stripped from the site. It is
recommended that subgrades be proof rolled using a minimum 4 tonne rubber tyred vehicle or drum roller to
identify any ‘soft spots’. Any such soft spots should be overexcavated and replaced with compacted select
fill.

Although trafficability should generally be good in ‘dry’ conditions, the soils could be subject to strength loss
from repetitive vehicle loading (particularly from rubber tyred plant) or if they become wet. Due to the
potential for poor trafficability during and after wet periods, placement of a minimum 150 mm thick granular
working platform may be required, particularly along access ways.

Fill materials should be compacted at moisture contents within the range of -2 % to +2 % of optimum
moisture content for Standard Compaction. Confirmatory compaction testing must be carried out at regular
intervals and further details for control and testing of fill are given in Australian Standard AS 3798-2007
Guidelines on Earthworks for Commercial and Residential Developments.

Fill (site won and imported) should have a maximum particle size of 100 mm for an uncompacted layer
thickness of 200 mm; and shall be compacted by repeated rolling with a roller to achieve a dry density ratio
of at least 95 % of the Standard Maximum Dry Density for cohesive soils, or 70 % Dry Density Index for any
imported cohesionless soils. Topsoil must not be re-used as structural fill, but may be used for landscaping.

Any imported fill should comprise a good quality material meeting the following specifications:

          Soaked CBR ≥ 10 %
          Shrink-swell index (Iss) ≤1 %
          Maximum particle size ≤ 100 mm

Following stripping of topsoil and any organic laden surface soils, fill must be ‘benched’ into the natural soil,
with batters over filled by 0.5 m (horizontally) and then trimmed back to the well compacted material.

It is anticipated that site earthworks could generally be completed by medium size excavators (8 tonne to 10
tonne) with toothed bucket attachments. However, the ground profile indicated by the Ground Drill boreholes




                                                       10/14

Page 11

Total Concept Homes                                                                                20332-001-Rev0
                                                                                                 15 December 2020

suggests that weathered rock could be expected within 1 m to 1.5 m of the ground surface. Such materials
may require the use of ripping attachments, or selected pneumatic breaking.

Temporary batters in natural soils of stiffer (or stiffer) consistency, and future controlled fill may be formed at
1V:1H; with permanent batters formed no steeper than 1V:2H. Flatter batters may be required if
groundwater seepage is encountered. Permanent batters will require erosion protection such as covering
with erosion matting or vegetation. Where spatial constraints prevent adoption of the above recommended
batter slopes, cut or fill batters would need to be supported by retaining walls.

The above recommendations do not supersede any existing safety regulations or legislation applicable to
excavations (e.g. limits on personnel entry into trenches).

Any excavations required adjacent to existing structures, will need to be specifically designed to ensure that
the structures are not adversely affected (e.g. 'undermined').

Ground surfaces should be graded to shed surface water runoff away from construction areas. It should be
noted that during wet weather, the natural soils may cause turbid stormwater run-off. Appropriate erosion
and sediment control measures must be installed prior to commencement of earthworks at this site,
especially given the presence of natural gullies and dams within the site boundary downslope of the
proposed construction areas.

4.3    Footing Design
Footings for the proposed building and any ancillary structures (e.g. retaining walls) must penetrate through
any future fill to ‘socket’ at least 0.5 m into natural residual soil comprising stiff (or stiffer) clay or a minimum
of 0.3 m in to weathered rock. Based on the Ground Drill boreholes, depending on the construction
methodology adopted, normally dimensioned, conventional high-level footings would be appropriate, or
possibly extended locally via the use of steel reinforced concrete bored piles (or ‘bucket piles’).

Footings could be designed with an allowable bearing capacity of 100 kPa when founded in stiff (or stiffer)
natural residual clays or 400 kPa in weathered rock.

Footing design should also account for the characteristic surface movement (ys), indicated by the site
classification report by Ground Drill to be equivalent to Class M. The re-use of the site-won clay materials for
filling works could result in greater estimates of characteristic ground surface movement and should be
considered by the design engineer once earthworks details have been confirmed.

All footings should found such that they are not adversely affected by any adjacent excavations, batter
slopes, trenches, or retaining walls that are not designed to support building loads. Footings should found at
least below a plane extending 1 m horizontally from the base of trenches/excavations/retaining walls, then
rising up at 1V:1H, as illustrated in Text Figure 10 overleaf.




                                                        11/14

Page 12

Total Concept Homes                                                                                  20332-001-Rev0
                                                                                                   15 December 2020




             Text Figure 10: Footing depth required to minimise the risk of undermining and surcharge loading

Footing bases must be cleaned following mechanical excavation to expose undisturbed materials over the
full base area. Should bored piles be adopted, it is recommended that the piling contractor have a ‘mud
bucket’ or similar device to enable clean out of the pile bases. ‘Spinning’ of the augers is not acceptable
and will not sufficiently remove drill spoil from pile bases. A suitably qualified and experienced engineer
should inspect the footing excavations to confirm appropriate foundation materials and cleanliness prior to
pouring concrete.
If any soil conditions encountered during construction are found to differ from those noted above, Tectonic
must be notified immediately and an inspection carried out to determine if changes to footing design are
required.

4.4       Retaining Structures
Any retaining walls must be founded as described in Section 4.3 above. Engineer design and certification of
retaining walls is required where such walls:
          Exceed 1 m height.
          Are subjected to surcharge loads (e.g. from backslope, adjacent structures, etc.).
          Are located within close proximity to existing structures.

Retaining structures should be engineer designed in accordance with AS4678-2002 Earth-retaining
structures. We suggest the following parameters may be adopted for retaining wall design:




                                                          12/14

Page 13

Total Concept Homes                                                                             20332-001-Rev0
                                                                                              15 December 2020

Table 3: Retaining Wall Design Parameters
                                                                Lateral earth pressure coefficients
                         Unit       Friction
Retained material      weight        angle
                                                         Ka                    Ko
                       (kN/m3)     (Degrees)                                                          Kp
                                                  (Cantilever wall)    (Non-yielding wall)


Stiff to Very Stiff
                          18           26                0.39                  0.56                   2.56
Natural Clays


Weathered Phyllite
                          21           35                0.27                  0.43                   3.69
Rock



These parameters do not include allowance for surcharge above the wall, or additional loads imposed by
sloping ground.
Subsurface drainage must be installed behind any retaining walls in order to prevent the development of
hydrostatic pressure (e.g. slotted ‘aggi’ pipe wrapped in filter ‘sock’ placed in gravel backfill).

4.5     Drainage
Adequate site drainage should be installed to ensure that stormwater runoff is directed away from the
building walls and footings (e.g. swales in landscaped areas or grated drains across pavements up slope of
structures including retaining walls for the driveway). Diversion drainage should be installed above the crest
of all cut/fill batters, and toe of all cut batters. Uncontrolled flow of stormwater over embankment batters (e.g.
from gutter overflow during high intensity storms, or if formal arrangements are not in place for the retaining
wall on the neighbouring property to the south-west) has the potential to saturate and weaken the
embankment materials, potentially leading to slumping failure. Future building and landscaping must be
carried out to maintain good drainage.

Subsurface drainage must be installed behind any retaining walls in order to prevent the development of
hydrostatic pressure (e.g. slotted ‘aggi’ pipe wrapped in filter ‘sock’ placed in gravel backfill).

All excess stormwater collected on site must be directed by pipes to the legal point of discharge, at least 5 m
down slope from the proposed or existing structures. Surface dissipation, such as a rock weir or similar,
must be installed at the stormwater outlet(s) to minimse the risk of soil erosion at the discharge point..
Subsurface disposal of stormwater must not be undertaken.



5.0       SUMMARY & CONCLUSIONS
Based on the findings of our assessment we consider that there would be a Low Risk of slope instability
impacting the proposed development. This advice is subject to implementation of the recommendations
given in this report.




                                                      13/14

Page 14

Total Concept Homes                                                                               20332-001-Rev0
                                                                                                15 December 2020

6.0     LIMITATIONS
Your attention is drawn to the document Limitations, which is attached to this letter report.
Please contact the undersigned should you wish to discuss any of the above matters.

Yours faithfully

TECTONIC GEOTECHNICAL PTY LTD




Robert Gibb BSc (Hons)                                        Ashley Davey BEng (Geological) RPEQ 8159
Engineering Geologist                                         Principal Geotechnical Engineer



Attachments: Ground Drill Site Classification Report & Effluent Disposal Report (Ref. Job No. 20/373, dated
             3 December 2020)
             Qualitative Terminology for Use in Assessing Risk to Property
             Some Guidelines for Hillside Construction
             Limitations




                                                      14/14

Page 15

                                                    Ground Drill Pty Ltd ATF The Bennett
                                                    Family Trust ABN - 15204820396
                                                    M – 0407035220
                                                    W- www.grounddrill.com.au
                                                    E [email protected]
                                                    QBCC Lic – 15034580
                                                    Pomona QLD 4568




                    Site Classification Report


Job No: 20/373                  Client Ref: N/A


Date: 03/12/20


Client: Tectonic Geotechnical


Site Address: Proposed Lot 2, 108 Black Mountain Range Road, Black Mountain


Proposed Structure: Proposed Residence


Information Provided by Client: No house plans were available

Page 16

Introduction

The purpose of this report is to classify the site in accordance with AS2870-2011. This report
is based on the field investigation/lab testing and information if any provided by the client.
This Report relates exclusively to the tested locations and the above-mentioned structure.
Further investigation may be required. Further investigation is recommended when deeper
depths of fill or marine clays are thought to be present, by way of deeper boreholes/other
test methods/use of prior investigation within the area. Bore logging in accordance with
AS1726-2017 Geotechnical Site Investigations.

Site Classification

                                       Class “P”
                              (Due to large mature trees)

  Based on the soil profiles the site would have the characteristics of an
        'M' site with an approximate Ys of 21-35mm if not a “P”.

                             Important Notes Relating to the classification

  This report does not address slope stability, if a slope stability report is required the services of a
                    suitably qualified Geotechnical Engineer should be sought.




Allowable Bearing Capacity

An approximate bearing capacity of 100kpa was encountered at a depth of 100mm
below existing ground surface level in the SILTY CLAY at location BH1 and location
BH2.

This is a suggested minimum founding depth; greater depth may be required due to the
following. Bearing capacity can be highly variable over the allotment these depths are
specific to the test locations. Actual founding depth should be nominated by the designing
engineer whilst taking construction and footing type, fill, underground services, retaining
walls, settlement, proposed cut/fill and any trees into account. Soft and/or settling soils may
present within the investigated depths or at deeper depths, further investigation may be
required to establish this.

Page 17

Lab Results/Predicted Surface Movement

Bore Hole                                 BH 1 200-500

Shrink-Swell (Indicative)                 1.0%

Ys                                        N/A


Site Description

Future Site Works: Unknown
Existing Earthworks: Nil
Retaining Walls: Nil
Vegetation: Heavily grassed, scattered large mature trees
Slope: 11-25%
Allotment Type: Acreage
Surrounding Allotments: Acreage
Surface Water: Surface water from adjoining allotments may traverse this site
Water Table: Not encountered
Rock: encountered
Watercourses: Nil nearby
Road Status: Sealed




By using this report, you are agreeing to the statements and limitations mentioned in this
report.


Authorised Signatory




Matthew Bennett
on behalf of Ground Drill Pty Ltd
QBCC Lic # 15034580

Page 18

Limitations of Report & Notes

This report is based on information gathered from the field investigation and information provided by
the client if any. Ground Drill should be notified immediately if ground conditions are found to differ
from this report during initial earthworks.

Unless otherwise stated this report does not address the following issues;

    •   Mining Subsidence.
    •   Slope Stability (If the site is in a known slip area or is steep, it is recommended that a
        Geotechnical Engineer be engaged to conduct a Slope Stability assessment).
    •   Deep soft or settling soils
    •   Soils within investigated depths or deeper may be subject to settlement with additional load of
        structure and any fill placed, the designing engineer is to allow for this potential settlement.
    •   Deep settling marine clays may be present.
    •   Soil Contamination, hazardous materials and or acid sulphate.
    •   Any slopes, dimensions or plans in this report are not to scale and only show approximate
        testing locations.
    •   Flood levels (It is the client’s responsibility to inform us of any flood levels on the allotment).
    •   If water is found in the boreholes this depth may vary greatly over time. This report does not
        address the influence any natural springs may have on the structure.
    •   It is the client’s responsibility to inform us of any nearby underground services that have been
        or will be installed near the proposed structure.
    •   Earthworks could affect the site classification and or founding depth.
    •   If any fill is placed on the allotment post investigation the founding depth will change,
        furthermore placement of reactive fill may change the sites classification.
    •   All topsoil and vegetation is to be removed.
    •   Surface water is to be diverted away from structure.
    •   Do not plant trees near the structure which could interfere with the footing’s performance.
    •   It is the owner’s responsibility to read and understand the CSIRO BTF 18 Foundation
        Maintenance and Footing Performance: A Home-owner’s Guide.
    •   Strength of founding material can be highly variable dependent upon moisture content.
    •   This investigation undertaken consisted of the included boreholes/test pits, given the size of
        the site it is possible that a problem could have been missed. eg. Filled dam/gully, soft soils,
        fill, springs, boulders, rock etc. We cannot give a definitive assurance that none of these
        problems exist on the site unless we did a greater number of boreholes which would be
        uneconomical and impractical.
    •   This report may not provide all necessary information to design an adequate footing system,
        further investigation may be required using larger drill rigs and/or different testing methods.
    •   This report relates exclusively to single or two storey residential structures, or structures with
        similar loads. Larger commercial or greater than 2 storey structures may need further
        investigation and this report is to be used as an initial guide only.
    •   If trees/palms are present, or have been removed from, within or near to the proposed
        structure footprint, it is the responsibility of the designing engineer to use the principals of
        AS2870-2011 Appendix H “Guide to Design of Footings for Trees”. The classification therefore
        excludes the effect of trees on the site unless otherwise stated.
        Distance from proposed structure that trees can affect footings:
        0.75 x 'h'          'M' sites
        1.0 x 'h'           'H' sites
        1.5 x 'h'           'E' Sites
        'h' is the mature height of the tree. Where there are rows of trees the distance should be
        increased.
    •   It is the designing engineer’s responsibility to calculate the yt and add it to the ys.
    •   As per the Plumbing and Drainage Regulation 2019, all sites classified H1, H2, E or P must
        have an articulating plumbing joint where connected to sanitary drainage. This should be
        designed by a competent person (E.g. RPEQ or similar).

Page 19

      Borelogs

BH 1                 Soil Description           DCP BH 2               Soil Description            DCP
0        SILTY CLAY (CI) – Medium plasticity,        0      SILTY CLAY (CI) – Medium plasticity,
         pale brown/orange, dry, stiff.                     pale brown/orange, dry, stiff.
100                                             3    100                                           3
200                                             4    200                                           4
300                                             5    300                                           5
400                                             4    400                                           4
500                                             5    500                                           5
600      EXTREMELY WEATHERED MATERIAL 7              600    EXTREMELY WEATHERED MATERIAL 9
         SILTY CLAY (CI) – Medium plasticity,               SILTY CLAY (CI) – Medium plasticity,
         pale brown, dry, stiff-very stiff.                 pale brown, dry, stiff-very stiff.
700                                             7    700                                           8
800                                             12   800                                           7
900                                             12   900                                           12
1000                                            14   1000                                          11
1100                                                 1100                                          11
1200                                                 1200
1300                                                 1300
1400     DISTINCTLY WEATHERED PHYLLITE               1400 DISTINCTLY WEATHERED PHYLLITE
         (DW) – pale brown, dry, very low                 (DW) – pale brown, dry, very low
         strength rock.                                   strength rock.
1500                                                 1500
1600                                                 1600
1700                                                 1700
1800                                                 1800
1900                                                 1900
2000     Hole Terminated.                            2000 Hole Terminated.
      *- DCP restarted down the borehole
      SWL -Standing Water Level
      PP- Pocket Penetrometer
      ISS-Indicative Shrink-Swell
      SS – Shrink-Swell

Page 20

      Proposed Driveway Borehole
      (This borehole does not form part of the Site Classification Report)

BH 6                 Soil Description           DCP
0        SILTY CLAY (CI) – Medium plasticity,
         brown, dry, stiff.
100                                             3
200                                             4
300                                             5
400                                             4
500                                             4
600                                             5
700      EXTREMELY WEATHERED MATERIAL 5
         SILTY CLAY (CI) – Medium plasticity,
         pale brown, dry, stiff-very stiff.
800                                             5
900                                             8
1000                                            4
1100                                            11
1200                                            10
1300     DISTINCTLY WEATHERED PHYLLITE          18
         (DW) – pale brown, dry, very low
         strength rock.
1400
1500
1600
1700
1800
1900
2000
2100     DISTINCTLY WEATHERED PHYLLITE
         (DW) – pale brown, dry, low strength
         rock.
2200
2300
2400
2500     Auger Refusal

Page 21

Site Photos


[OCR of page images]
Site Photos

 

 

Page 22

Ground Drill Pty Ltd                                    PH - 0407035220
ATF The Bennett Family Trust                            W - www.grounddrill.com.au
ABN - 15204820396                                       E - [email protected]
QBCC Lic – 15034580                                     Pomona QLD 4568




                            Effluent Disposal Report



Job No: 20/373


Date: 03/12/20


Client: Tectonic Geotechnical


Site Address: Proposed Lot 2, 108 Black Mountain Range Road, Black Mountain


Proposed Structure: Proposed 4-bedroom residence on tank water


Information Provided by the Client: No house plans were available


Local Authority: Noosa Shire Council

Page 23

Introduction

The purpose of this report is to evaluate and design a suitable on-site treatment system and disposal
area in accordance with AS 1547 – 2012, the Queensland Plumbing and Wastewater Code and the
Plumbing and Drainage Act. The report relates exclusively to the above site and the proposed and or
existing buildings shown on the plan only. All measurements and levels shown are as accurate as
possible with the information provided these are to be used for locating the onsite effluent disposal
system only.


Site Description

 Weather Conditions                                                      Fine
 Slope                                                                  5-15%
 Slope Stability                                                          N/a
 Vegetation                                                        Heavily Grassed
 Fill                                                                     Nil
 Flooding                                                                 Nil
 Watercourses                                                             Nil
 Site exposure                                                        Sun & wind
 Salinity                                                                 Nil
 Surface condition                                        Nil cracks, seepage or compaction
 Boulders & Rock outcrops                                                 Nil
 Will water from uphill traverse the area                                 No
 Water table                                                              Nil

Soil Category (AS1547-2012 Table M1)

 Borehole                        0-0.2m                0.2m-0.6m
 BH3-BH5                          Cat 4                   Cat 5
                              Clay Loams               Light Clays
                            Weakly Structured      Moderately Structured
                              0.12-0.5m/d              0.06-12m/d

Recommended Design Irrigation Rate

 Test Result                                                             0.10
 Recommended Design Irrigation Rate                                    3mm/day
 Adopted Rate                                                         3/mm/day

Calculations

 Bedrooms                                                              4
 Persons                                                               6
 DIR (mm/day)                                                          3
 Litres per person per day (Tank supply)                              120
 Calculations                                                   6x120=720 /3= 240
 Disposal Area Required                                   240m2 Covered surface pressure
                                                             compensating irrigation

Page 24

Risk Assessment

                      Risk                                         Risk Mitigation
                 Surface Runoff                                        Mounds
                 Human Contact                         Signs and mound to identify area. Apply by
                                                                       setbacks
         Overloading of system and LAA                   Use correct DIR, flow allowances and
                                                                 maximum occupancy

Recommendations

   •   An approved Advanced Secondary ASTP is to be installed. (Installer to ensure tank
       position does not damage to existing or proposed structures)
   • A covered surface irrigation area of 240m2 consisting of pressure compensating lines
       laid atop of the existing ground surface level and spaced approximately 800-1000mm
       apart and covered with 150mm of mulch.
   • The tank must be installed and anchored if necessary, to prevent flotation.
   • Installer to confirm sufficient fall is available to the treatment plant prior to installation once
       the floor height is known.
   • Top of treatment plant shall be at least 150mm above any flood levels that are present.
   • A filter must be installed in between treatment plant and irrigation area.
   • Pump must have sufficient power to pressurise irrigation lines.
   • All pipework and fittings used must meet relevant Australian Standards be buried, withstand
       150% of pump shut-off-head and be fit for use.
   • The supply line from the treatment plant to the irrigation area shall be buried 25-32mm
       purple line poly within a 200mm layer sand bed to prevent damage.
   • A flush out valve should be installed on the end of the irrigation area and used regularly.
   • Flexible joints should be used from the treatment to the proposed/existing structure where
       the site is “H1” or higher.
   • A reserve area equal to the above area is to be kept free of development and vehicle traffic
       as per plan.
   • The area shall be surrounded by a 150mm high earth mound.
   • The area shall be mulched to a depth of 150mm and evergreen plants planted to maximise
       evapotranspiration.
   • Two signs are to be erected stating ‘Recycled water-buried pipes-Do not dig’
   • All Storm water from the residence and uphill slopes is to be diverted away from the area.
   • Set back distances as per local council policies and AS1547 -2012 are to be met some of
       these setbacks when Advanced Secondary ASTP with Surface Irrigation are;
10M from a watercourse, dam, table drain, bore etc.
10M from a dwelling or habitable building.
2M from a boundary/driveway if it slopes away or is level with that boundary/driveway.
4M from boundary/driveway if it slopes towards that boundary/driveway
6M from an inground water tank
6M from pool edge.
Authorised Signatory

Matthew Bennett
on behalf of Ground Drill Pty Ltd
QBCC Lic # 15034580

Page 25

Limitations of Report & Notes

This report is based on information gathered from the field investigation and information provided by the
client if any. Ground Drill should be notified immediately if ground conditions are found to differ from this
report.

Unless otherwise stated this report does not address the following issues;

    •   Mining Subsidence.
    •   Slope Stability (If the site is in a known slip area or is steep, it is recommended that a Geotechnical
        Engineer be engaged to conduct a Slope Stability assessment).
    •   Deep soft or settling soils
    •   Soil Contamination, hazardous materials and or acid sulphate.
    •   Any slopes, dimensions, levels, site features or plans in this report are approximate only show
        approximate testing locations.
    •   Flood levels (It is the client’s responsibility to inform us of any flood levels on the allotment).
    •   If water is found in the boreholes this depth may vary greatly over time. This report does not address
        the influence any natural springs may have on the structure.
    •   It is the client’s responsibility to inform us of any nearby underground services that have been or will
        be installed near the proposed area.
    •   Earthworks could affect the design.
    •   If any fill is placed on the allotment post investigation this could change the design.
    •   Surface water is to be diverted away from the area.
    •   This investigation undertaken consisted of the occluded boreholes/test pits, given the size of the site
        it is possible that a problem could have been missed. eg. Filled dam/gully, soft soils, fill, springs,
        boulders, rock etc. We cannot give a definitive assurance that none of these problems exist on the site
        unless we did a greater number of boreholes which would be uneconomical and impractical.


                                    Maintenance and Operation of System
    •    Scrape all dishes to remove fats, grease, etc. before washing
    •    Don't use a garbage grinder
    •    Use biodegradable soaps
    •    Use a low-phosphorus detergent
    •    Don't use powerful bleaches
    •    Don't put sanitary napkins and other hygiene products into the system
    •    Spray or irrigation areas should have access restricted
    •    Divert surface water away from land application area
    •    No vehicles or stock should be allowed on trenches, beds or irrigation area.
    •    Deep rooting trees or shrubs should not be grown over absorption trenches or pipes
    •    Vegetable gardens and/or fruit trees should not be planted within or near area, where there is a
         possibility of airborne spray coming into contact with the plant.
    •    Structures should not be constructed near areas that encourage people to congregate.
    •    Play areas and equipment should be well away from areas where there is no possibility of spray
         coming into contact with humans.
    •    Treatment plants and septic tanks are to be desludged every 3-5 years.
    •    Ground Drill will not be liable for any Council Inspection, submission or reviewing fees due to
         changes in report or plan requested by client or Council.
    •    If any part of this design is unclear, please call before buying products or installing.
    •    This report must be approved by the local authority and appropriate permits issued before any works
         can be undertaken.
    •    Installer is to contact Noosa Shire Council prior to burying the system for a site inspection and
         certification.
    •    Follow the manufacturer's instructions, relevant codes, standards and guidelines for installation,
         servicing, maintaining and cleaning the system and irrigation area/trenches/beds

Page 26

                                                         Soil Profiles

BH 3              Soil Description            BH 4              Soil Description         BH 5             Soil Description
0      SILTY CLAY (CI) – Medium               0      SILTY CLAY (CI) – Medium            0      SILTY CLAY (CI) – Medium
       plasticity, orange, dry, stiff.               plasticity, orange, dry, stiff.            plasticity, orange, dry, stiff.
100                                           100                                        100
200                                           200                                        200
300                                           300                                        300
400                                           400                                        400
500                                           500                                        500
600    EXTRMELY WEATHERED                     600    EXTRMELY WEATHERED                   600   EXTRMELY WEATHERED
       MATERIAL (XW) – SILTY CLAY                    MATERIAL (XW) – SILTY CLAY                 MATERIAL (XW) – SILTY CLAY
       (CI) – Medium plasticity, red/brown,          (CI) – Medium plasticity, red/brown,       (CI) – Medium plasticity,
       dry, very stiff.                              dry, very stiff.                           red/brown, dry, very stiff.
700                                           700                                        700
800                                           800                                        800
900                                           900                                        900

1000 DISTINCTLY WEATHERED             1000           DISTINCTLY WEATHERED             1000      DISTINCTLY WEATHERED
     PHYLLITE (DW) – Pale brown, dry,                PHYLLITE (DW) – Pale brown, dry,           PHYLLITE (DW) – Pale brown,
     very low strength rock.                         very low strength rock.                    dry, very low strength rock.
1100                                          1100                                       1100
1200                                          1200                                       1200
1300                                          1300                                       1300
1400                                          1400                                       1400
1500 Hole Terminated.                         1500   Hole Terminated.                    1500   Hole Terminated.

Page 27

                                    Covered Surface Irrigation Diagram




             150mm cover of mulch
                                                                         Pressure
                                                                         compensating
             150m earth mound                                            dripper lines




    Native nitrogen
    tolerant shrubs with
    non-invasive root
    systems




                                                                                                        Flush out valve

Covered Surface layout               Ground Drill Pty Ltd
NTS                                  Sunshine Coast, QLD.
                                     QBCC # 150 345 80                        C:\Users\Ground Drill Desktop\Documents\Advertising\print\logo.jpg

                                     E: [email protected]
                                     W: www.grounddrill.com.au
                                     P: 0407 035 220

Page 28

 Notes
Levels shown are approximate
                                                                       No plans were available for the proposed residence at the time of investigation
and are sourced from local
council mapping or information                                                                                                                                                                                     N
provided by the client. These
levels are solely to demonstrate
the functionality of the system.
Actual floor height is to be
confirmed with the builder prior
to installation.
All pipe work from the structure
to the proposed system should
be covered and adequately
vented and be vermin/insect
proof.
All work carried out should meet                                                                                                                                                Proposed Covered Surface
relevant codes/standards and be                                                                                                                                                 Irrigation Area - 240sqm
done by an appropriately                                                                                                                                                        (20 x 12m)
                                                                                            220m A                                                                              (Approx RL 187-186)
qualified and licensed person.                                                                     pprox.
Proposed system should be
constructed in a way to
maximize evapotranspiration
and minimize potential pooling
and runoff.
If plans were not available at
the time of investigation further
reporting and design work may
be needed prior to council                                                                    Proposed                          Proposed Lot 2
submission and installation.                                                                  Residence




                                                                                                                                                                                            26m
Care is to be taken not to                                                                    (Approx RL 188.5)                                                Slope
sompact,smear or damage the                                                                                                                                    37%
                                                                                                                                                                          Reserve Area
                                             Blac




soil structure during installation
(This can lead to premature
                                                  k




failure).                                                                                                                                                                       BH4
                                                Mou




                                                                                                                                                         BH2                                               Slope
If structures have been built                                                                                                                                     Slope         PT2                        5-15%
                                                                                                                                                                                                  BH5
                                                    nt




since our initial investigation                                                                                                                                   25%
                                                      ain




                                                                                                                                                                                                  PT3
(Including neighboring
                                                                                                                                                                       15m
                                                       Ran




structures) please contact us to
confirm this will not adversely
                                                         ge R




effect the design.                                                                                                                                                        BH3
Final landscaping and installation                                                                                                                                        PT1
                                                            oad




should discourage and limit                                                                                                                           BH1 Slope




                                                                                                                                                                                            2m
causal pedestrian access.(By                                                                                                                              11-13%
way of plantings, border,                                                                                                 Trees 10-25m
mounds, visual and or physical
deterrents)                                                                                     BH6
The owner should obtain
knowledge on how to use and                                                                                                                                     Proposed Advanced
maintain the proposed system.                                                                                                        Proposed Lot 1             Secondary ASTP
Most of this is available from                                                                              Existing                                            (Approx RL 188)
your chosen supplier/installer.                                                                             Residence
This report must be approved by
the local council prior to any
work commencing.
The effluent disposal report
must be accompanied by a
Site Classification Report. If
the Site Classification is
H1,H2, E or P an articulation
joint will need to be designed
by a person licensed to do
so.




Client- Tectonic Geotechnical
Site - Proposed Lot 2, 108 Black Mountain Range Road, Black Mountain
                                                                                                                                                                                                  Ground Drill Pty Ltd
Date - 07/12/20
                                                                                                                              Abbreviations                                                       Sunshine Coast, QLD.
Job# - 20/373
                                                                                                                              BH : Borehole           DCP : Dynamic Cone Penetrometer             QBCC # 150 345 80
Scale - 1 : 1100 @ A4 (Site features are approximate-Do not scale)
                                                                                                                              PT : Percolation Test   HD : Heavy Droplet Lilac Sprinkler          E: [email protected]
                                                                                                                              TV : Turf Valve         RWT : Rain Water Tank                       W: www.grounddrill.com.au
                                                                                                                                                                                                  P: 0407 035 220

Page 29

                                      PRACTICE NOTE GUIDELINES FOR LANDSLIDE RISK MANAGEMENT 2007
                                                              APPENDIX C: LANDSLIDE RISK ASSESSMENT
                                    QUALITATIVE TERMINOLOGY FOR USE IN ASSESSING RISK TO PROPERTY


   QUALITATIVE MEASURES OF LIKELIHOOD

Approximate Annual Probability
                                             Implied Indicative Landslide
                                                                                                                     Description                                           Descriptor               Level
Indicative          Notional                    Recurrence Interval
  Value             Boundary
   10-1                5x10-2
                                              10 years                           The event is expected to occur over the design life.                                ALMOST CERTAIN                   A
                                                                    20 years     The event will probably occur under adverse conditions over the
        -2
   10                                      100 years
                                                                                 design life.
                                                                                                                                                                     LIKELY                           B
                            -3
     -3               5x10                                       200 years
   10                                      1000 years                            The event could occur under adverse conditions over the design life.                POSSIBLE                         C
                      5x10-4                                     2000 years
                                                                                 The event might occur under very adverse circumstances over the
   10-4                                   10,000 years
                                                                                 design life.
                                                                                                                                                                     UNLIKELY                         D
     -5               5x10-5                                     20,000 years
   10                                                                            The event is conceivable but only under exceptional circumstances
                                         100,000 years                                                                                                               RARE                             E
                                                                                 over the design life.
     -6                5x10-6                                    200,000 years
   10                                   1,000,000 years                          The event is inconceivable or fanciful over the design life.                        BARELY CREDIBLE                  F
   Note:     (1)   The table should be used from left to right; use Approximate Annual Probability or Description to assign Descriptor, not vice versa.


   QUALITATIVE MEASURES OF CONSEQUENCES TO PROPERTY

  Approximate Cost of Damage
                                                                                               Description                                                                 Descriptor               Level
Indicative           Notional
  Value              Boundary
                                         Structure(s) completely destroyed and/or large scale damage requiring major engineering works for
   200%                                                                                                                                                             CATASTROPHIC                      1
                                         stabilisation. Could cause at least one adjacent property major consequence damage.
                     100%
                                         Extensive damage to most of structure, and/or extending beyond site boundaries requiring significant
   60%                                                                                                                                                              MAJOR                             2
                                         stabilisation works. Could cause at least one adjacent property medium consequence damage.
                       40%
                                         Moderate damage to some of structure, and/or significant part of site requiring large stabilisation works.
   20%                                                                                                                                                              MEDIUM                            3
                                         Could cause at least one adjacent property minor consequence damage.
                       10%
    5%                 1%                Limited damage to part of structure, and/or part of site requiring some reinstatement stabilisation works.                 MINOR                             4
                                         Little damage. (Note for high probability event (Almost Certain), this category may be subdivided at a
   0.5%                                                                                                                                                             INSIGNIFICANT                     5
                                         notional boundary of 0.1%. See Risk Matrix.)
   Notes:    (2)   The Approximate Cost of Damage is expressed as a percentage of market value, being the cost of the improved value of the unaffected property which includes the land plus the
                   unaffected structures.
             (3)   The Approximate Cost is to be an estimate of the direct cost of the damage, such as the cost of reinstatement of the damaged portion of the property (land plus structures), stabilisation
                   works required to render the site to tolerable risk level for the landslide which has occurred and professional design fees, and consequential costs such as legal fees, temporary
                   accommodation. It does not include additional stabilisation works to address other landslides which may affect the property.
             (4)   The table should be used from left to right; use Approximate Cost of Damage or Description to assign Descriptor, not vice versa


                                                                    Australian Geomechanics Vol 42 No 1 March 2007
Form No. 68039
  68039        RL2Risk
         Landslide August 2010
                       Management Issued 10/7/07

Page 30

                                       PRACTICE NOTE GUIDELINES FOR LANDSLIDE RISK MANAGEMENT 2007
               APPENDIX C: – QUALITATIVE TERMINOLOGY FOR USE IN ASSESSING RISK TO PROPERTY (CONTINUED)


      QUALITATIVE RISK ANALYSIS MATRIX – LEVEL OF RISK TO PROPERTY
                     LIKELIHOOD                                                  CONSEQUENCES TO PROPERTY (With Indicative Approximate Cost of Damage)
                                          Indicative Value of         1: CATASTROPHIC                 2: MAJOR                3: MEDIUM                4: MINOR                    5:
                                         Approximate Annual                 200%                         60%                      20%                     5%                INSIGNIFICANT
                                             Probability                                                                                                                         0.5%
A –    ALMOST CERTAIN                             10-1                          VH                         VH                      VH                       H                   M or L (5)
                                                    -2
B -    LIKELY                                     10                            VH                         VH                       H                       M                       L
C -    POSSIBLE                                   10-3                          VH                          H                       M                       M                      VL

D -    UNLIKELY                                   10-4                           H                         M                        L                       L                      VL
                                                    -5
E -    RARE                                       10                             M                          L                       L                      VL                      VL
                                                    -6
F -    BARELY CREDIBLE                            10                             L                         VL                      VL                      VL                      VL
      Notes:   (5)   For Cell A5, may be subdivided such that a consequence of less than 0.1% is Low Risk.
               (6)   When considering a risk assessment it must be clearly stated whether it is for existing conditions or with risk control measures which may not be implemented at the current
                     time.


      RISK LEVEL IMPLICATIONS
                        Risk Level                                                                                  Example Implications (7)
                                                                 Unacceptable without treatment. Extensive detailed investigation and research, planning and implementation of treatment
        VH                      VERY HIGH RISK                   options essential to reduce risk to Low; may be too expensive and not practical. Work likely to cost more than value of the
                                                                 property.
                                                                 Unacceptable without treatment. Detailed investigation, planning and implementation of treatment options required to reduce
         H                           HIGH RISK
                                                                 risk to Low. Work would cost a substantial sum in relation to the value of the property.
                                                                 May be tolerated in certain circumstances (subject to regulator’s approval) but requires investigation, planning and
         M                      MODERATE RISK                    implementation of treatment options to reduce the risk to Low. Treatment options to reduce to Low risk should be
                                                                 implemented as soon as practicable.
                                                                 Usually acceptable to regulators. Where treatment has been required to reduce the risk to this level, ongoing maintenance is
         L                           LOW RISK
                                                                 required.
                                                                 Acceptable. Manage by normal slope maintenance procedures.
         VL                      VERY LOW RISK

       Note:   (7)   The implications for a particular situation are to be determined by all parties to the risk assessment and may depend on the nature of the property at risk; these are only
                     given as a general guide.




                                                                      Australian Geomechanics Vol 42 No 1 March 2007
 Form No. Landslide
    68039 68039 RL2Risk
                    August 2010
                        Management           Issued 10/7/07

Page 31

           PRACTICE NOTE GUIDELINES FOR LANDSLIDE RISK MANAGEMENT 2007



                 APPENDIX G - SOME GUIDELINES FOR HILLSIDE CONSTRUCTION

                        GOOD ENGINEERING PRACTICE                                                            POOR ENGINEERING PRACTICE
      ADVICE
      GEOTECHNICAL      Obtain advice from a qualified, experienced geotechnical practitioner at early       Prepare detailed plan and start site works before
      ASSESSMENT        stage of planning and before site works.                                             geotechnical advice.
      PLANNING
      SITE PLANNING     Having obtained geotechnical advice, plan the development with the risk              Plan development without regard for the Risk.
                        arising from the identified hazards and consequences in mind.
      DESIGN AND CONSTRUCTION
                        Use flexible structures which incorporate properly designed brickwork, timber        Floor plans which require extensive cutting and
                        or steel frames, timber or panel cladding.                                           filling.
       HOUSE DESIGN
                        Consider use of split levels.                                                        Movement intolerant structures.
                        Use decks for recreational areas where appropriate.
      SITE CLEARING     Retain natural vegetation wherever practicable.                                      Indiscriminately clear the site.
          ACCESS &      Satisfy requirements below for cuts, fills, retaining walls and drainage.            Excavate and fill for site access before
         DRIVEWAYS      Council specifications for grades may need to be modified.                           geotechnical advice.
                        Driveways and parking areas may need to be fully supported on piers.
      EARTHWORKS        Retain natural contours wherever possible.                                           Indiscriminatory bulk earthworks.
                        Minimise depth.                                                                      Large scale cuts and benching.
            CUTS        Support with engineered retaining walls or batter to appropriate slope.              Unsupported cuts.
                        Provide drainage measures and erosion control.                                       Ignore drainage requirements
                        Minimise height.                                                                     Loose or poorly compacted fill, which if it fails,
                        Strip vegetation and topsoil and key into natural slopes prior to filling.           may flow a considerable distance including
                        Use clean fill materials and compact to engineering standards.                       onto property below.
            FILLS       Batter to appropriate slope or support with engineered retaining wall.               Block natural drainage lines.
                        Provide surface drainage and appropriate subsurface drainage.                        Fill over existing vegetation and topsoil.
                                                                                                             Include stumps, trees, vegetation, topsoil,
                                                                                                             boulders, building rubble etc in fill.
        ROCK OUTCROPS   Remove or stabilise boulders which may have unacceptable risk.                       Disturb or undercut detached blocks or
         & BOULDERS     Support rock faces where necessary.                                                  boulders.
                        Engineer design to resist applied soil and water forces.                             Construct a structurally inadequate wall such as
                        Found on rock where practicable.                                                     sandstone flagging, brick or unreinforced
         RETAINING
                        Provide subsurface drainage within wall backfill and surface drainage on slope       blockwork.
           WALLS
                        above.                                                                               Lack of subsurface drains and weepholes.
                        Construct wall as soon as possible after cut/fill operation.
                        Found within rock where practicable.                                                 Found on topsoil, loose fill, detached boulders
                        Use rows of piers or strip footings oriented up and down slope.                      or undercut cliffs.
          FOOTINGS
                        Design for lateral creep pressures if necessary.
                        Backfill footing excavations to exclude ingress of surface water.
                        Engineer designed.
                        Support on piers to rock where practicable.
      SWIMMING POOLS    Provide with under-drainage and gravity drain outlet where practicable.
                        Design for high soil pressures which may develop on uphill side whilst there
                        may be little or no lateral support on downhill side.
         DRAINAGE
                        Provide at tops of cut and fill slopes.                                              Discharge at top of fills and cuts.
                        Discharge to street drainage or natural water courses.                               Allow water to pond on bench areas.
           SURFACE      Provide general falls to prevent blockage by siltation and incorporate silt traps.
                        Line to minimise infiltration and make flexible where possible.
                        Special structures to dissipate energy at changes of slope and/or direction.
                        Provide filter around subsurface drain.                                              Discharge roof runoff into absorption trenches.
                        Provide drain behind retaining walls.
         SUBSURFACE
                        Use flexible pipelines with access for maintenance.
                        Prevent inflow of surface water.
                        Usually requires pump-out or mains sewer systems; absorption trenches may            Discharge sullage directly onto and into slopes.
           SEPTIC &
                        be possible in some areas if risk is acceptable.                                     Use absorption trenches without consideration
           SULLAGE
                        Storage tanks should be water-tight and adequately founded.                          of landslide risk.
          EROSION       Control erosion as this may lead to instability.                                     Failure to observe earthworks and drainage
         CONTROL &      Revegetate cleared area.                                                             recommendations when landscaping.
        LANDSCAPING
      DRAWINGS AND SITE VISITS DURING CONSTRUCTION
         DRAWINGS       Building Application drawings should be viewed by geotechnical consultant
         SITE VISITS    Site Visits by consultant may be appropriate during construction/
      INSPECTION AND MAINTENANCE BY OWNER
          OWNER’S       Clean drainage systems; repair broken joints in drains and leaks in supply
       RESPONSIBILITY   pipes.
                        Where structural distress is evident see advice.
                        If seepage observed, determine causes or seek advice on consequences.




                                 Australian Geomechanics Vol 42 No 1 March 2007                                                                113
Form No. 68029 RL2 August 2010

Page 32

          PRACTICE NOTE GUIDELINES FOR LANDSLIDE RISK MANAGEMENT 2007




    114                      Australian Geomechanics Vol 42 No 1 March 2007

Form No. 68029 RL2 August 2010

Page 33

                                               LIMITATIONS


This document has been prepared for the purpose outlined in Tectonic’s proposal and no responsibility is
accepted for the use of this document, in whole or in part, for any other purpose.

The scope of Tectonic’s Services are as described in Tectonic’s proposal, and are subject to restrictions
and limitations. Tectonic did not perform a complete assessment of all possible conditions or
circumstances that may exist at the site referenced in the report. If a service is not expressly indicated, do
not assume it has been provided. If a matter is not addressed, do not assume that any determination has
been made by Tectonic in regards to it.

Conditions may exist which were undetectable given that economic and time constraints limit the practical
extent of geotechnical investigation. Variations in conditions may occur between investigation locations,
and there may be special conditions pertaining to the site which have not been revealed by the
investigation and which have not therefore been taken into account in the document. Where variations exist
on site, additional studies and actions may be required.

Tectonic’s opinions are based upon information that existed at the time that the work was performed. The
passage of time, man-made or natural events, may alter the site conditions. It is understood that the
Services undertaken allowed Tectonic to form an opinion of the actual conditions of the site at the time the
site was visited and cannot be used to assess the effect of any subsequent changes in the quality of the
site, or its surroundings, or any laws or regulations.

Any assessments made in the preparation of this document are based on the conditions indicated from
published sources and the findings of the investigation described. Actual subsurface conditions may differ
from those indicated in the document (e.g. between boreholes or test pits). No warranty is included, either
express or implied, that the actual conditions will conform exactly to the assessments contained in this
document.

Where data supplied by the client or other external sources, including previous site investigation data, have
been used, it has been assumed that the information is correct unless otherwise stated. No responsibility is
accepted by Tectonic for incomplete or inaccurate data supplied by others.

This document is provided for the sole use by the Client and its professional advisers. No responsibility
whatsoever for the contents of this document will be accepted to any person other than the Client. Any use
which a third party makes of this document, or any reliance on or decisions to be made based on it, is the
responsibility of such third parties. Tectonic accepts no responsibility for damages, if any, suffered by any
third party as a result of decisions made or actions based on this document.




Rev 1 (March 2016)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.