Levels shown are approximate
                                                                       No plans were available for the proposed residence at the time of investigation
and are sourced from local
council mapping or information                                                                                                                                                                                     N
provided by the client. These
levels are solely to demonstrate
the functionality of the system.
Actual floor height is to be
confirmed with the builder prior
to installation.
All pipe work from the structure
to the proposed system should
be covered and adequately
vented and be vermin/insect
proof.
All work carried out should meet                                                                                                                                                Proposed Covered Surface
relevant codes/standards and be                                                                                                                                                 Irrigation Area - 240sqm
done by an appropriately                                                                                                                                                        (20 x 12m)
                                                                                            220m A                                                                              (Approx RL 187-186)
qualified and licensed person.                                                                     pprox.
Proposed system should be
constructed in a way to
maximize evapotranspiration
and minimize potential pooling
and runoff.
If plans were not available at
the time of investigation further
reporting and design work may
be needed prior to council                                                                    Proposed                          Proposed Lot 2
submission and installation.                                                                  Residence




                                                                                                                                                                                            26m
Care is to be taken not to                                                                    (Approx RL 188.5)                                                Slope
sompact,smear or damage the                                                                                                                                    37%
                                                                                                                                                                          Reserve Area
                                             Blac




soil structure during installation
(This can lead to premature
                                                  k




failure).                                                                                                                                                                       BH4
                                                Mou




                                                                                                                                                         BH2                                               Slope
If structures have been built                                                                                                                                     Slope         PT2                        5-15%
                                                                                                                                                                                                  BH5
                                                    nt




since our initial investigation                                                                                                                                   25%
                                                      ain




                                                                                                                                                                                                  PT3
(Including neighboring
                                                                                                                                                                       15m
                                                       Ran




structures) please contact us to
confirm this will not adversely
                                                         ge R




effect the design.                                                                                                                                                        BH3
Final landscaping and installation                                                                                                                                        PT1
                                                            oad




should discourage and limit                                                                                                                           BH1 Slope




                                                                                                                                                                                            2m
causal pedestrian access.(By                                                                                                                              11-13%
way of plantings, border,                                                                                                 Trees 10-25m
mounds, visual and or physical
deterrents)                                                                                     BH6
The owner should obtain
knowledge on how to use and                                                                                                                                     Proposed Advanced
maintain the proposed system.                                                                                                        Proposed Lot 1             Secondary ASTP
Most of this is available from                                                                              Existing                                            (Approx RL 188)
your chosen supplier/installer.                                                                             Residence
This report must be approved by
the local council prior to any
work commencing.
The effluent disposal report
must be accompanied by a
Site Classification Report. If
the Site Classification is
H1,H2, E or P an articulation
joint will need to be designed
by a person licensed to do
so.




Client- Tectonic Geotechnical
Site - Proposed Lot 2, 108 Black Mountain Range Road, Black Mountain
                                                                                                                                                                                                  Ground Drill Pty Ltd
Date - 07/12/20
                                                                                                                              Abbreviations                                                       Sunshine Coast, QLD.
Job# - 20/373
                                                                                                                              BH : Borehole           DCP : Dynamic Cone Penetrometer             QBCC # 150 345 80
Scale - 1 : 1100 @ A4 (Site features are approximate-Do not scale)
                                                                                                                              PT : Percolation Test   HD : Heavy Droplet Lilac Sprinkler          E: [email protected]
                                                                                                                              TV : Turf Valve         RWT : Rain Water Tank                       W: www.grounddrill.com.au
                                                                                                                                                                                                  P: 0407 035 220
Log in to download the original file

Appendix G - Geotechnical Report.pdf · 6.0 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.