Council archive · source document
Response to Information Request Letter 10-6-2025 · OPW25/0042
d. proposed haulage route – including the scheduled duration of excavation/haulage
works, number of haulage vehicles exiting the site per hour, and the type of
haulage vehicle (i.e., truck or truck and dog); and
e. the receiving location(s) of the exported spoil.
Response
Refer attached Traffic Impact Assessment, Traffic Management Plan and Traffic guidance scheme.
END INFORMATION RESPONSE
Part 3: Information Request has now concluded, and the application is now in Part 5: Decision.
Should you have any questions with respect to the above, please do not hesitate to contact me
direct.
Yours faithfully
PROJECT URBAN
Scott Sobey
DIRECTOR
Email: [email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Response to Information Request Letter 10-6-2025.pdfRelated documentApplication case desk ↗
About this file
- File size
- 437 KB (small file)
- File type
No other editions are linked here.