NOOSA COUNCIL IDAS Development Application Decision Notice 10
71. Any damage caused to any public utility during the course of construction shall be repaired to Council’s
standards and at no cost to Council.
72. Any alteration of any public utility or other facilities necessitated by the development of the land or
associated construction works external to the site shall be at no cost to Council.
73. The transportation of all materials to and from the site shall be undertaken in a manner such that no
particle matter escapes onto a public road. All vehicles carrying materials either to or from the site shall
be covered to prevent materials including dust being windblown from the vehicle.
74. As Constructed drawings and data shall be certified by a qualified experienced Civil Engineer for design
intent, and a Licensed Surveyor shall certify the cadastre and the location, level and type of all services
and structures. All of which shall be submitted to Council for checking and for Council’s records.
The data must fully detail levels for all engineering works including but not limited to drainage structures,
finished ground levels and pavement surface levels. The data shall be submitted in the Asset Design and
As Constructed (ADAC) digital format. (Guidelines on the use of ADAC are available at
www.adac.com.au).
Approval of works shall not be granted until all As Constructed information has been supplied and
accepted by Council.
Environmental Health
75. Deleted.
76. Street litterbins to a design approved by Council, shall be supplied and installed at the developers
expense at agreed locations.
77. A Waste Management Plan is to be submitted for specified developments as determined by the
Manager Environmental Health Services for the day-to-day operation of the complex. The Waste
Management Plan is to be submitted with development applications for material change of use (MCU)
and approved prior to commencement of operational works.
The Waste Management Plan Strategy will include the following information:-
The types of waste that will be generated from the activities approved within the development.
Estimated volumes or tonnage of recyclables within the generated waste stream
Estimated volumes or tonnage of waste generated from the activities.
Methods to be used for dealing with garden waste.
Initiatives to minimize waste either by waste prevention, reduction, re-use or recycling.
Description of procedures involving disposing of refuse to bins; the storage of bins and the
collection of bins by the contractor and who is responsible for each transfer of the waste.
A description of the design details of waste storage and recycling areas including methods of
prevention of storm water contamination. To be high lighted on plans.
A description of types and volume of waste storage containers to be used.
A detailed description of access to waste collection area for waste collection vehicles to the bin collection
area. To be highlighted on plans.
78. The developer shall submit to Council a Waste Management Plan for the construction or demolition phase
of the development. The Waste Management Plan is to contain the following information:
MATERIALS ON-SITE DESTINATION
Re-use and Recycling Disposal
Expected waste Estimated On-site Off-site *specify contractor
materials volume *specify proposed *specify contractor and landfill site
(m³) re-use or on-site and recycling outlet
recycling methods
Excavation material
Garden Organics
Bricks
Concrete
Timber-please
specify
AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@4c044668\@[email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERSEDED Compiled Decision Notice [As Published]Related documentApplication case desk ↗
About this file
- File size
- 78 KB (small file)
- File type
No other editions are linked here.