Original source · versioned page text
Delegated Report - Code - Planning OPW19 0157
Author Development Engineer, Diogo Carrico Development Assessment APPLICATION DETAILS Application No. OPW19/0157 Applicant Sunshine Beach Surf Life Saving Club C/ Martoo Consulting Proposal Operational Works – Electrical and Lighting Properly Made Date 8 July 2019 Information Request Date 22 July 2019 Information Response Date 29 August 2019 Decision Due Date 21 October 2019 Report Completed Date 18 September 2019 Number of Submissions Not Applicable PROPERTY DETAILS Property Address 2 The Esplanade Sunshine Beach Qld 4567 RP Description Lot 4 SP 269274 Land Area 7609 m² Existing Use of Land Park STATUTORY DETAILS SEQRP Designation Urban Footprint Locality Sunshine Beach Zone Open Space Recreation Overlays Environmental Protection Area (partial – eastern side); Slide Hazard; Low Potential Acid Sulphate; Costal Protection Area Assessment Type Code PROPOSAL The application seeks approval for Operational Works – Electrical and Lighting. site details Background Due to the Sunshine Beach Surf Club’s power demand increase (due to renovations – refer to MCU17/0024), a new transformer is required to supply the site. This will also require the upgrade of existing supply infrastructure (i.e. conduits crossing Ed Webb Park). Site Description Surrounding Land Uses assessment Instruments for Statutory Assessment Under the Planning Act 2016 the application must be assessed against each of the following statutory planning instruments to the extent they are relevant to the development: State Planning Policy; South East Queensland Regional Plan; Planning Regulation 2017; The Noosa Plan. The following codes from the Noosa Plan are applicable to this development: Engineering Works Codes; Landscaping Code. draft planning scheme Not applicable. cONSULTATION Referral Agencies Not applicable. Other Referrals The application was forwarded to the following internal Council officers: Conor Neville, Ecologist Dorene Di Bartolomeo, Council Arborist conclusion & reasons for decision The proposed development generally complies with the requirements of the planning scheme and does not raise any significant issues that cannot be addressed by reasonable and relevant conditions. The application is therefore recommended for approval. The report is provided in accordance with Section 63(5) of the Planning Act 2016. RECOMMENDATION With regard to Application No OPW19/0157 for Operational Works – Electrical and Lighting situated at 2 The Esplanade Sunshine Beach Qld 4567 and described as Lot 4 SP 269274, it is recommended the application be approved in accordance with the following details for the Decision Notice: application details Application No: OPW19/0157 Street address: 2 The Esplanade Sunshine Beach Qld 4567 Real property description: Lot 4 SP 269274 Planning Scheme: The Noosa Plan (8 June 2018) Decision details Council decided to issue the following type of approval: Development Permit for Operational Works – Electrical and Lighting CURRENCY PERIOD of approval The currency period for this development approval is stated in the conditions below. assessment manager conditions APPROVED PLANS/DOCUMENTS Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions. Plan No. Rev. Plan/Document Name Date 6524 E 160 P7 “Substation Plan and Details Sheet 1”, prepared by Multitech Solutions (AS ANNOTATED BY COUNCIL) 04/09/2019 6524 E161 P3 “Substation Plan and Details Sheet 2”, prepared by Multitech Solutions 05/09/2019 Tree Management Plan – New Conduits Sunshine Beach Surf Club, prepared by Taylor Ecology June 2019 CURRENCY PERIOD The Currency Period for this development approval lapses if the development has not substantially started by 24 September 2021, unless an application to extend the currency period is approved by Council. SITE SPECIFIC CONDITIONS All applicable works are to be undertaken generally in accordance with approved document “Tree Management Plan – New Conduits, Sunshine Beach Surf Club”, dated June 2019 and prepared by Taylor Ecology. Vacuum excavation of electrical conduit trenches must occur under the supervision of the Project Arborist where trenches occur within the tree protection zone of Tree 1, 2, 3 and 4 as identified within the approved document “Tree Management Plan – New Conduits, Sunshine Beach Surf Club”, dated June 2019 and prepared by Taylor Ecology. A construction hold point with a council delegate must be established at the start of the vacuum excavation of the electrical conduit trench. The commencement of the vacuum excavation works must be undertaken in the presence of a council delegate. Prior to requesting a prestart meeting the developer must provide to Council a Tree Protection Bond* of $10,000 for the protection of the trees on Ed Webb Park outlined in the approved document “Tree Management Plan – New Conduits, Sunshine Beach Surf Club”, dated June 2019 and prepared by Taylor Ecology. *(Refer to Advisory Note) PRIOR TO COMMENCEMENT OF WORKS Engineering Tree protection fencing must be installed under the supervision of the Project Arborist. Submit to Council professional details of the supervising Project Arborist. All necessary approvals from external service providers and external parties on which the development works are proposed have been obtained and a copy supplied to Council prior to the prestart meeting. A condition report including photographs of the frontage of the site, park and existing trees must be completed and submitted to council prior to the prestart meeting. Certificates demonstrating currency of public liability insurance and works insurance covering the works must be submitted to Council prior to the prestart meeting. Council must be contacted at least 5 working days prior to any works commencing to organise a prestart. The contact number to arrange a pre-start meeting is 5329 6245. The pre-start meeting must include the relevant parties for the following aspects of the works: Civil engineering works; Landscape works; Electrical reticulation works; Erosion and sediment control works; Other relevant parties A Construction Management Plan must be submitted to Council prior to the pre-start meeting and must specifically address the following: Traffic Management during all aspects of the construct phase including: A Traffic Management Control Plan in accordance with Manual of Uniform Traffic Control Devices (MUTCD) detailing all temporary signage and traffic control measures prior to construction; Maintenance of safe pedestrian access across the frontage of the site both during daily construction and after daily construction has ceased; Proposed fencing to the site during the construction phase of the development; Adequate parking arrangements for construction workers. Maintenance and protection of water quality and existing drainage lines through the construction site through the implementation of appropriate erosion and sediment control measures; Works programme identifying key components of the works and their respective durations; Establishment of a communication protocol with the general public, adjoining owners, emergency services and local businesses to advise of agreed construction times, impacts on traffic and services and other relevant issues; identification of complaint management procedures including: contact details for the on-site manager dispute resolution procedures Any changes to the details associated with the supervising RPEQ or Principal Contractor during construction, must be notified to council in writing within five business days of the change occurring. Any conflict between the development and an existing or proposed service must be referred to the relevant service authority for determination prior to commencement of works. DURING CONSTRUCTION Engineering All works must be supervised by a Registered Professional Engineer of Queensland (RPEQ) who is independent of the Developer and Principal Contractor, and they must certify that all works conform to the Operational Works permit. Where municipal works are involved, such confirmation must be submitted for the respective hold points prior to any site inspection by Council Officers. All works must be constructed and work procedure undertaken in accordance with: The approved plans/documents and conditions detailed in this Decision Notice; The relevant conditions of the higher order Material Change of Use approval viz. MCU17/0024 to which this approval relates; All relevant Noosa Council Planning Scheme Policies, standard drawings, standard specifications and guidelines; The latest version of the Healthy Waterways document “Water Sensitive Urban Design Technical Design Guidelines for South East Queensland” for all water quality devices to be constructed on site. Works within Road Reserve/Park and Reinstatement Safe pedestrian access on all streets in the vicinity of the development must be maintained at all times. Should footpath/road closures be necessary to carry out construction works, Council’s Engineering Officer must be notified prior to the proposed closure and all requirements complied with. All frontage works must match neatly with existing road and verge/footpath features. Additional works beyond the frontage may be required to provide an acceptable transition to existing road and verge/footpath profiles. Electrical conduits or other services proposed to be installed within existing and proposed road reserves under existing sealed carriageways, concrete pathways, concrete/sealed driveways or significant vegetation must be installed by boring or vacuum excavation. Trenching is only permitted to be undertaken in accordance with recommendations of approved document “Tree Management Plan – New Conduits, Sunshine Beach Surf Club”, as amended by these conditions. Following the installations of conduits within the Tree Protection Zones, identified in the approved arborist report, the trenches must immediately be back filled and the site remediated in accordance with the supervising arborist’s direction to ensure the on-going maintenance of the health of the trees within the park area. Following the successful reinstatement of the Tree Protection Zone surfaces, the area must be reinstated to pre-existing levels and condition. Stormwater Drainage Appropriate scour protection must be provided at the outlet of all stormwater pipes including temporary outlets. Works associated with this permit must not adversely impact on the existing drainage conditions on other properties (e.g. by blocking or interfering with natural overland flows). Environment Prescribed Water Contaminants (as defined in the Environmental Protection Act 1994) must not be released from the site or to waters within the site, or be likely to be released should rainfall occur, unless all reasonable and practicable measures are taken to prevent or minimise the release and concentration of contamination. Erosion and sediment control measures must be installed and maintained to minimise erosion on the site and to minimise the export of sediment and associated pollutants from the site. The erosion and sediment control measures must be designed, installed and maintained in accordance with current best practice standards (refer to advisory notes). Prior to the On-Maintenance inspection for the development, all site surfaces must be effectively stabilised using methods which have achieved effective short-term stabilisation and which will continue to achieve effective stabilisation in the medium to long-term (refer to advisory notes). For the purpose of this condition, an effectively stabilised surface is defined as one that does not, or is not likely to result in visible evidence of soil loss caused by sheet, rill or gully erosion or lead to sedimentation, or lead to water contamination. Damage to Services and Assets Any damage caused to existing services and assets as a result of the development works must be repaired at no cost to the asset owner at the following times: where the damage would cause a hazard to pedestrian or vehicle safety, immediately; or where otherwise, upon completion of the works associated with the development. Any repair work which proposes to alter the alignment or level of existing services and assets must first be referred to the relevant service authority for approval. FOLLOWING CONSTRUCTION / PRIOR TO ON-MAINTENANCE INSPECTION Certification Upon completion of the work a certificate must be issued by an RPEQ certifying that the works have been constructed in accordance with the Operational Works permit. Upon completion of the work certification must be submitted to Council from Energex which certifies that the development has met the requirements of this Decision Notice and all applicable legislation at the time of construction. Upon completion of the work a certificate must be issued by the supervising arborist certifying that the works have been constructed in accordance with approved document “Tree Management Plan – New Conduits, Sunshine Beach Surf Club”, dated June 2019 and prepared by Taylor Ecology. As Constructed Plans and ADAC XML Files (Council) Prior to acceptance of the works, satisfactory “As-Constructed” records must be submitted to Council. The bundle of “As Constructed” information shall include: As-Constructed Engineering Drawings. Data is to be submitted in an electronic drawing file format (.dwg), with all plans clearly endorsed “As-Constructed”, along with the accompanying hardcopies (PDFs of the As-Constructed .dwg drawing files), and; ADAC XML Digital File. ADAC File format (ADAC - Asset Design As Constructed) prepared in accordance with industry standards and recorded in “MGA - UTM56 / GDA94” projection. Please Note: Further information and advice relating to the as-constructed drawing presentation, as-constructed survey capture and associated guidelines for preparation of a compliant ADAC XML digital file are available on the webpage titled “As-Constructed Guidelines” and accessible at the Noosa Council Website: Planning & Development / Development Tools & Guidelines / As-Constructed Guidelines. The “As-Constructed” drawings will require certification by a: Qualified experienced Civil Engineer (RPEQ) confirming design intent and conformance with applicable standards and specifications, along with the relevant descriptions of assets, services and structures and; Licensed Surveyor in regard to the cadastral and locational information, levels and applicable survey datum. The data must be in accordance with Council’s “Planning Scheme Policy 5 – Engineering Design Standards – Roads, Drainage and Earthworks”, and fully detail the levels for all engineering works including but not limited to the drainage network and structures, finished ground and pavement surface levels. Landscaping, including all assets and improvements within parks adjacent to the works, open space and road reserves areas are to be shown on an accompanying separate landscape plan (prepared in .dwg file format with accompanying hardcopy PDFs) and include a complaint ADAC XML file. Details of the landscaping and all associated assets and improvements may be included in the ADAC XML digital file prepared for associated civil infrastructure, or alternatively, be provided as a separate ADAC XML digital file containing landscape and asset information only. On Maintenance All landscaping and reinstatement works must be accepted ‘On Maintenance’ by Council in accordance with Council’s relevant Planning Scheme Policy prior to Council accepting the works. To achieve ‘On Maintenance’, the supervising RPEQ must submit to Council: certification that all works have been undertaken and completed in accordance with the requirements of this Permit; as Constructed details in accordance with Council’s Planning Scheme Policy; Arborist certification the works are in accordance with the conditions of this permit; The maintenance period for the landscaping and reinstatement works shall be 12 months from the date these works are accept On-Maintenance. The supervising RPEQ must submit to Council a schedule of arborist inspections every 3 months to the end of the maintenance period, including Tree Risk Assessment in accordance with ISA Tree Risk Assessment Framework Off Maintenance Prior to requesting an Off-Maintenance inspection the developer must provide a written request for the Off-Maintenance inspection and submit to Council Arborist certification the trees identified with the approved arborist report are in good health and fit for purpose. Tree Risk Assessment in accordance with ISA Tree Risk Assessment Framework. A re-inspection fee in accordance with Council’s Fees and Charge Register will be charged where: a Council inspection reveals works do not comply with approval requirements; submitted certification falsely states works comply with approval requirements. referral agencies Not applicable. Advisory notes The following notes are included for guidance and information purposes only and do not form part of the assessment manager conditions: General Advisory Notes All tree retention and protection works must be carried out generally in accordance with approved document “Tree Management Plan – New Conduits, Sunshine Beach Surf Club”, dated June 2019 and prepared by Taylor Ecology. Prior to requesting a prestart meeting, a cash bond or bank guarantee in accordance with the conditions must be lodged with Council as security for the protection of the trees identified for retention within this Decision Notice. The guarantee: may be drawn upon by Council if: the trees designated for retention are damaged by the construction works and this leads to their decline or the trees designated for retention are damaged by the construction works and are made unsafe to the point where pruning to Australian standards cannot rectify the damage or the recommendations of the Arborist report are not implemented or any trees identified for retention are damaged to the point where they cannot be satisfactorily saved and made safe for the designated use area in accordance with Australian standards (as confirmed by the Project Arborist and agreed in writing by Council) will be returned upon receiving certification from the Project Arborist that all requirements nominated in the Arborist report referenced within this Decision Notice and permit conditions have been competently completed. Council reserves the right to call up any performance bond held or levy charges against the property, should emergency works be required to be undertaken by Council to make the site safe due to inactivity on the development site for extended periods of time. Should any changes or modifications to the approved plans be required as a result of construction constraints, a “Request to change an existing approval” under the Planning Act 2016 must be made. Amended plans clearly indicating the changes must be lodged with this application along with the appropriate fees. Prestart, On and Off Maintenance Inspections Request Contact Council on 5329 6245 to arrange a prestart or an inspection giving a minimum of 5 business days’ notice of preferred inspection time. If Council officers are required to undertake additional inspections of the same works, a reinspection fee will be applicable in accordance with Council’s Fees and Charges register applicable at the time. A minimum maintenance period of 12 months will apply to all municipal works and thereafter until such time as the works are performing in accordance with the approved design unless noted otherwise Environmental Advisory Notes The Environmental Protection Act 1994 states that a person must not carry out any activity that causes, or is likely to cause, environmental harm unless the person takes all reasonable and practicable measures to prevent or minimise the harm. Environmental harm includes environmental nuisance. In this regard persons and entities, involved in the civil, earthworks, construction and landscaping phases of this development are to adhere to their ‘general environmental duty’ to minimise the risk of causing environmental harm. Erosion and Sediment Control Accepted best practice standards include: the Sunshine Coast Regional Council Manual for Erosion and Sediment Control V1.2 or other superseding document subsequently adopted by Council; Best Practice Erosion and Sediment Control, International Erosion Control Association (2008). As a general rule, a site is determined to have achieved effective short-term stabilisation if at the time of the plan sealing inspection: Methods of stabilisation are: appropriate for slopes and slope lengths; and are consistent with best practice environmental management practices such as in the Manual for Erosion and Sediment Control or the IECA Manual; and Stormwater runoff from the site is not currently, and is not likely to result in visible evidence of sedimentation or erosion, or lead to water contamination. If at the time of request for plan sealing, the method of short-term stabilisation has not achieved a level of stability that Council's Officers believe will have a high probability of achieving long term stability (i.e. until house construction has occurred on all lots), Council Officers may take the following matters into consideration in determining whether the site is capable of achieving medium to long-term stability: evidence that the site has been effectively stabilised in the short term; evidence that soil has been adequately ameliorated; evidence that seed of annual and perennial grass species has been applied at an adequate rate; and that grass seed has germinated at a density that is likely to achieve an effective grass cover. property notes Not applicable. VARIATION approval details Not applicable. further development permits required Not applicable. submissions Not applicable. RIGHTS OF APPEAL You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the Planning Act 2016 is attached. During the appeal period, you as the applicant may suspend your appeal period and make written representations to Council about the conditions contained within the development approval. If Council agrees or agrees in part with the representations, a negotiated decision notice will be issued. Only one negotiated decision notice may be given. OTHER DETAILS If you wish to obtain more information about the decision, electronic copies are available on line at www.noosa.qld.gov.au or at Council Offices. [word/footer1.xml] Page 10 of 10 [word/header1.xml] 3 [word/header2.xml] DEVELOPMENT ASSESSMENT DELEGATED REPORT [Attachment: image1.png (image text)] ~ 141682 | House 4 Freehold wend Park we Sunshine Beech Parcel | Perimeterm 643.27 SUNSHINE BEACH QLD 4567 [Attachment: image2.png (image text)] 2 SEQ Regional Pian 2017 4 as 2 Bio Assessment 2017 individual 4 4 3 Drafe New Noose Plen 2079 2 New Pian 2019 Zone zone Map JN Town Boundaries Mary Thomas St Precinct Noosa Plan Zones (2016) Pian Zones (2016) Housing Housing A @ Housing 4 A Mixed Use Ae ey Business Ce MM Shire Business 4 purl Open Space Open Space Conservation SA q Panning - Heritage Overiay % Planning -Nat Overa
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.