CO NT E NT S

1            INTRODUCTION ..................................................................................................................... 1

2            SITE DESCRIPTION ............................................................................................................... 1

2.1          Location and Land Use ............................................................................................................ 1

2.2          Lawful Point of Discharge ........................................................................................................ 2

2.3          Upstream Drainage Connection .............................................................................................. 2

2.4          Flooding ................................................................................................................................... 2

3            STORMWATER QUANTITY MANAGEMENT ........................................................................ 2

4            WATER QUALITY MANAGEMENT ....................................................................................... 2

4.1          Operational Phase ................................................................................................................... 2

4.2          Construction Phase ................................................................................................................. 3

4.2.1        Design Objectives .................................................................................................................... 3

4.2.2        Erosion and Sediment Control ................................................................................................. 5

4.2.3        Maintenance and Monitoring Requirements ............................................................................ 6

5            CONCLUSION ......................................................................................................................... 7

6            APPENDICES ..................................................................................................................... A-1

Appendix A – Erosion Hazard Assessment ........................................................................................ A-1

Appendix B – Preliminary Engineering Plans ..................................................................................... B-1

Appendix C – Site Survey .................................................................................................................. C-1

List Of Tables

        Table 1 – Pollutants Typically Generated During the Construction Phase ................................... 3

        Table 2 – SPP Appendix 2: Part 1 Construction Phase – Stormwater Management Design
             Objectives ............................................................................................................................. 3

        Table 3 – SPP Appendix 2: Part 2 Construction Phase – Stormwater Management Design
             Objectives for Temporary Drainage Works .......................................................................... 5

        Table 4 – SPP Appendix 2: Part 3 Construction Phase – Stormwater Management Design
             Objectives for Emergency Spillways on Temporary Sediment Basins ................................. 5

        Table 5 - ESC maintenance requirements. ................................................................................... 6

List of Figures

        Figure 1 – Indicative site location (Nearmaps, 2024) .................................................................... 1




                                                                                                                                                       iii

Used in these records

About this file

File size
2.6 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Reference Document - Stormwater Mangement Report & Letter Repsonse - MCU24 0094.pdf · 2.6 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.