2019-11-28 SM Agenda - Item 1 - Attachment 1 - Draft Noosa River Plan

of 34

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Implement a stormwater quality improvement program – Private Development        Educator, enabler, regulator   Exis���
                                                                                                                     ogram           Ongoing                 Council con����   o require and regulate stormwater management systems and water
infrastructure.                                                                                                                                              ����   e urban design in private developments.
                                                                                                                                                             Private developments comply with their environment obliga�����
                                                                                                                                                                                                                          ���
                                                                                                                                                                                                                            ely manage
                                                                                                                                                             inputs into the stormwater system.
Implement a stormwater quality educa�����
                                        ompliance program for the               Educator, enabler, regulator   Exis���
                                                                                                                     ogram           Ongoing                 There is greater understanding within the community of individual pr�������
community.                                                                                                                                                   pollute waterways via the stormwater system.
                                                                                                                                                             Sedimen�����   om building sites and contaminants from roof pain��, pool
                                                                                                                                                             backwashing and car washing is reduced.
Con���W
      o implement and e���������������
                                   ogram for industrial                         Partner, enabler, regulator    Enhance exis���
                                                                                                                             ogram   Short-medium term       Licensed and non-licensed industrial operators comply with their Environment Authority
opera���                                                                                                                                                     requirements and general environmental obliga��
Undertake a rural roads sediment study.                                         Partner, funder                Ne����
                                                                                                                    �e               Short term              ��������    t from unsealed roads to waterways is quan������
                                                                                                                                                                                                                       forms future




                                                                   DRAFT
                                                                                                                                                             management.
Undertak��������
             er exclusion devices to r�����
                                          er entry into the                     Leader, planner, provider      Ne����
                                                                                                                    �e               Medium term             The e���   ������W    er exclusion devices is properly assessed as a management tool
waterways.                                                                                                                                                   for the river, and im-plemented where appropriate.



Sustainable Use & Enjoyment
Program or initiative                                                           Council’s role         New initiative/ existing Timeframe                   Desired outcomes
                                                                                                       program
Objective 1. Recreational and commercial use of the Noosa River waterways and foreshores is undertaken in a way that protects ecosystem health, respects the rivers carrying capacity and environment values, and prioritises visual amenity
and public safety.
Con���W o work with relevant State agencies to advocate for and support Advocate, partner                      Exis���
                                                                                                                     ogram           Ongoing                 Exis���
                                                                                                                                                                   egula���
                                                                                                                                                                          elated to the Noosa River are observed and e���
                                                                                                                                                                                                                        ely enforced.
improved monitoring, compliance and enforcement of regula���������
River.
Advance discussions with relevant State agencies regarding local management of Advocate, partner               Ne����
                                                                                                                    �e               Short-medium term       State government agrees to local managemen��������������
                                                                                                                                                                                                                 ansfers
anchoring, mooring, living on the river as per Community Jury recommenda���                                                                                  responsibility to Noosa Council.
Subject to handover of these r��������W       o Council, pursue;
     a) Development of an Anchoring, Mooring and Living on Board Management     Planner, provider              Ne����
                                                                                                                    �e               Medium term             A clear management framework is established for Noosa Council to regulate anchoring,
        Plan to iden�
                    y how Council intends to manag���������                                                                                                  mooring and living on the Noosa River.
     b) State endorsement of the Plans, and enter into a formalised agreement   Advocate                       Ne����
                                                                                                                    �e               Medium term             Anchoring, mooring and living on the river is locally managed.
        under relevant waterways legisla��
     c) A review of anchoring and mooring loca��������������                    Researcher, regulator          Ne����
                                                                                                                    �e               Medium term             Safe and suitable loca����   e provided for v������W   er and conges������
                                                                                                                                                             lower estuary is reduced. Impacts on water quality and declared Fish Habitat Areas are
                                                                                                                                                             reduced.
     d) Iden��
             a�����
                  ap and loca���
                               or living on the river.                          Researcher, regulator          Ne����
                                                                                                                    �e               Medium term             Vessels used to live on board create no impediments regarding use of river foreshores by
                                                                                                                                                             local residents and the general public.
     e) E���  e monitoring and facilita����
                                          aste tank e���
                                                       t removal and            Regulator, enabler             Ne����
                                                                                                                    �e               Medium term             The release of pollutants from vessels into the river system is prevented.
        disposal from vessels.
Advocate for removal of unsafe, abandoned and derelict vessels from the Noosa   Advocate, provider             Ne����
                                                                                                                    �e               Medium term             Unsafe, abandoned and derelict vessels are gradually removed from the river.
River.
Inves�ate legisla�e amendments to control the ‘length of stay’ for anchoring.   Researcher, advocate           Ne����
                                                                                                                    �e               Long term               New provisions in the relevant waterways legisla���
                                                                                                                                                                                                               ohibit long term una�ended
                                                                                                                                                             anchoring in the Noosa River.
Review of seasonal speed limit res������   ound Munna Point and Noosa Spit      Advocate                       Ne����
                                                                                                                    �e               Short term              Speed limits in high use areas are appropriate to ensure public safety and prot�����
��������������               fety Queensland.                                                                                                                ����   e areas. Changes are supported by the broader c������������               fety
                                                                                                                                                             Queensland.
Develop a comprehensive database of boat ramps and je�����
                                                         eview current          Planner                        Ne����
                                                                                                                    �e               Long term               The database is shared by all agencies and includes loca�����     wnership of
management of them in the river system.                                                                                                                      unapproved je��������������              tabase provides a basis for more e���e
                                                                                                                                                             future management.
Inves�ate a means of assessing the carrying capacity of the river in terms of   Researcher                     Ne����
                                                                                                                    �e               Long term               Council makes informed, long-term decisions about marine infrastructure in the Noosa
marine infrastructure.                                                                                                                                       River.


60                                                                                                                                                                                                                                                      61

—              ——            =e     —    ——                                                                                                  ==             22   —
                                                                                               ——  =         —                                                                                                                         ——_               —
                                                                                                    _—                                                                                                                                           _ =
                                                                                          =               —_            —                                              kes.                                                          —————_ —                           —
                                                                                                      —$—$———=>a
                                                                                                                                                                                                                                                  SS

Implement a stormwater quality improvement program — Private Development      Educator, enabler, regulator       Exis    ogtlam                Ongoing                   Council con       o require and regulate stormwater management systems and water
infrastructure.                                                                                                                                                                 e urban design in private developments.
                                                                                                                                                                         Private developments comply with their environment obliga            fl eR) manage
                                                                                                                                                                         inputs into the stormwater system.
Implement a stormwater quality educa          ompliance program for the       Educator, enabler, regulator       Exis    ogtlam                Ongoing                   There is greater understanding within the community of individual pr
community.                                                                                                                                                               pollute waterways via the stormwater system.
                                                                                                                                                                         Sedimen         om Muilding sites and contaminants from roof pain   , pool
                                                                                                                                                                         backwashing and car washing is reduced.
Con      o inplement and e                             ogram for industrial   Partner, enabler, regulator        Enhance exis     ogtiam       Short-medium term         Licensed and non-licensed industrial operators comply with their Environment Authority
opera                                                                                                                                                                    requirements and general environmental obliga     >|
Undertake a rural roads sediment study.                                       Partner, funder                    Ne        el?                 Short term                                t ffm unsealed roads to waterways is quan           fornf future
                                                                                                                                                                         management.
Undertak             er exclusion devices to r      er entry into the         Leader, planner, provider          Ne        el?                 Medium term               Thee        >|      er exXtlusion devices is properly assessed as a management tool
waterways.                                                                                                                                                               for the river, and im-plemented where appropriate.

Program or initiative                                                          Council’s role                    New    initiative/  existing  Timeframe                 Desired outcomes
                                                                                                                 program
Objective 1. Recreational and commercial use of the Noosa River waterways and foreshores is undertaken in a way that protects ecosystem health, respects the rivers carrying capacity and environment values, and prioritises visual amenity
and public safety.
Con      o Work with relevant State agencies to advocate for and support       Advocate, partner                 Exis    ogtiam                Ongoing                   Exis     egula     el&ted to the Noosa River are observed and e   el} enforced.
improved monitoring, compliance and enforcement of regula                      >|
River.
Advance discussions with relevant State agencies regarding local management of Advocate, partner                 Ne        el                  Short-medium term         State government agrees to local managemen                          ansfers
anchoring, mooring, living on the river as per Community Jury recommenda       >|                                                                                        responsibility to Noosa Council.
Subject to handover of these r            o Couficil, pursue;
  a) Development of an Anchoring, Mooring and Living on Board Management       Planner, provider                 Ne        el                  Medium term               A clear management framework is established for Noosa Council to regulate anchoring,
     Plan to iden y How Council intends to manag                     >|                                                                                                  mooring and living on the Noosa River.
  b) State endorsement of the Plans, and enter into a formalised agreement     Advocate                          Ne        el                  Medium term               Anchoring, mooring and living on the river is locally managed.
     under relevant waterways legisla    >|
  c) Areview of anchoring and mooring loca                                     Researcher, regulator             Ne        el                  Medium term               Safe and suitable loca      e provided for v         er aftd conges             >|
                                                                                                                                                                         lower estuary is reduced. Impacts on water quality and declared Fish Habitat Areas are
                                                                                                                                                                         reduced.
  d) Iden   a Pl     ap athd loca   orffiving on the river.                    Researcher, regulator             Ne        el                  Medium term               Vessels used to live on board create no impediments regarding use of river foreshores by
                                                                                                                                                                         local residents and the general public.
  e) E     elfnonitoring and facilita    askb tank e     t removal and         Regulator, enabler                Ne        el                  Medium term               The release of pollutants from vessels into the river system is prevented.
     disposal from vessels.
Advocate for removal of unsafe, abandoned and derelict vessels from the Noosa  Advocate, provider                Ne        el                  Medium term               Unsafe, abandoned and derelict vessels are gradually removed from the river.
River.
Inves ab legisla e&mendments to control the ‘length of stay’ for anchoring.    Researcher, advocate              Ne        el                  Long term                 New provisions in the relevant waterways legisla   olfibit long term una ended
                                                                                                                                                                         anchoring in the Noosa River.
Review of seasonal speed limit res         ound Munna Point and Noosa Spit     Advocate                          Ne        el                  Short term                Speed limits in high use areas are appropriate to ensure public safety and prot
                            fety Queensland.                                                                                                                                    e areas. Changes are supported by the broader c                         fety
                                                                                                                                                                         Queensland.
Develop a comprehensive database of boat ramps and je         evidw current    Planner                           Ne        el                  Long term                 The database is shared by all agencies and includes loca      wrership of
management of them in the river system.                                                                                                                                  unapproved je                          tabase provides a basis for more e   eP?
                                                                                                                                                                         future management.
Inves ake a means of assessing the carrying capacity of the river in terms of  Researcher                        Ne        el                  Long term                 Council makes informed, long-term decisions about marine infrastructure in the Noosa
marine infrastructure.                                                                                                                                                   River.

                                                                SS                                           —                         IE
Log in to download the original file

2019-11-28 SM Agenda - Item 1 - Attachment 1 - Draft Noosa River Plan(PDF, 4MB).pdf · 4.4 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗