Skip to the record
The only place to find full transcripts.

Council archive · source document

08/0200 - Response to Information Request [As Published] · 142008.200

of 8

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

GENERAL NOTES 12.3.08

PLANTS

¢ Plants to be ordered in advance from reputable source/s to ensure
availability.

e Plants to be well-formed, hardened-off stock, well-branched &
foliated, true to type.

e Root system to be sturdily established in container with no targe roots
extending.

¢ Form & habit to be normal for species scheduled & pruning scars to
be clean cut.

¢ Leaves to be of normal shape, colour & texture with minimal physical
damage.

« Plants to be free of living insect pests and free from any disease or
physical injury

« Containers to be free of weeds.

* Allplants to be delivered to site clearly & accurately labelled.
Contractor to maintain plants on site until planted.

 

SOIL PREPARATION

« Remove all weeds, debris, rubbish, grass, etc. from areas to be
planted.

« Form garden beds & spread any stockpiled topsoil. Beds adjacent to
hard areas to finish 100mm below paved level to allow for depth of
mulch.”

e Any imported topsoil to be free of large stones, weeds, sticks, rubbish,
or any material toxic to plant growth & shall be guaranteed free of Nut
Grass & Oxaiis.

PLANTING PROCEDURES

e Do not plant in extreme hot, cold or atmospheric disturbances.

* Dig separate holes for each plant, 100mm wider & deeper than
container. Loosen soil at base of holes a further 150mm depth. Fill
holes with water & allow to drain away.

» Position plant in centre of hole, set plumb & backfill, incorporating
controlled release fertilizer as instructed on packaging.

e Gently & firmly tamp down around root bail, leaving a shallow
watering depression. Water immediately and thoroughly using
minimum 5 litres per plant.

MULCHING

* All garden areas to be mulched after planting and installation of
irrigation (recommended) with Hardwood Chip mulch (max. 5% fi fines)
to min depth of 100mm unless otherwise shown on plan.

e Mulch to be kept at least 50mm from all plant stems to prevent collar
rot.

DRY CREEK BED

* To simulate a dry creek bed, excavate a roughly 300mm deep
elongated depression as shown on plan. Line outsides with 100 to
200mm diam river rock and line base with ungraded river gravel to
depth of 100mm.

GARDEN EDGING
« CCA treated HWD sleepers on edge with top edge 40mm above turf
level and 100mm above level of soil at edges of garden beds.

TURFING

« Grass species to be ‘Seaisle 7’

e Turf to be first quality (A Grade), typical of the species, free from all
pests, diseases & other deleterious matter.

¢ Turf to be guaranteed free from Oxalis and Nut Grass.

¢ Top of turfs to finish 40mm below adjacent kerbs, paths and edgings.

e Turf to be laid by supplier, using best practices and materials.

e Water whole of area thoroughly but lightly after completion of turfing &
top dressing.

ESTABLISHMENT

e¢ The Contractor shall establish and maintain the landscaping works
until the end of the Defects Liability Period.

« Make good any defects due to inferior materials, workmanship or
damage.

« Carry out all necessary watering, weeding, pruning & plant
replacements to ensure healthy growth.

« Replace any dead or damaged piants with same species at the
contractor's expense (except for vandalism).

« Remove all debris and leave site in a clean and tidy manner.

Used in these records

About this file

File size
581 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_0200 - Response to Information Request [As Published].pdf · 581 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.