Council archive · source document
08/0200 - Response to Information Request [As Published] · 142008.200
GENERAL NOTES 12.3.08 PLANTS ¢ Plants to be ordered in advance from reputable source/s to ensure availability. e Plants to be well-formed, hardened-off stock, well-branched & foliated, true to type. e Root system to be sturdily established in container with no targe roots extending. ¢ Form & habit to be normal for species scheduled & pruning scars to be clean cut. ¢ Leaves to be of normal shape, colour & texture with minimal physical damage. « Plants to be free of living insect pests and free from any disease or physical injury « Containers to be free of weeds. * Allplants to be delivered to site clearly & accurately labelled. Contractor to maintain plants on site until planted. SOIL PREPARATION « Remove all weeds, debris, rubbish, grass, etc. from areas to be planted. « Form garden beds & spread any stockpiled topsoil. Beds adjacent to hard areas to finish 100mm below paved level to allow for depth of mulch.” e Any imported topsoil to be free of large stones, weeds, sticks, rubbish, or any material toxic to plant growth & shall be guaranteed free of Nut Grass & Oxaiis. PLANTING PROCEDURES e Do not plant in extreme hot, cold or atmospheric disturbances. * Dig separate holes for each plant, 100mm wider & deeper than container. Loosen soil at base of holes a further 150mm depth. Fill holes with water & allow to drain away. » Position plant in centre of hole, set plumb & backfill, incorporating controlled release fertilizer as instructed on packaging. e Gently & firmly tamp down around root bail, leaving a shallow watering depression. Water immediately and thoroughly using minimum 5 litres per plant. MULCHING * All garden areas to be mulched after planting and installation of irrigation (recommended) with Hardwood Chip mulch (max. 5% fi fines) to min depth of 100mm unless otherwise shown on plan. e Mulch to be kept at least 50mm from all plant stems to prevent collar rot. DRY CREEK BED * To simulate a dry creek bed, excavate a roughly 300mm deep elongated depression as shown on plan. Line outsides with 100 to 200mm diam river rock and line base with ungraded river gravel to depth of 100mm. GARDEN EDGING « CCA treated HWD sleepers on edge with top edge 40mm above turf level and 100mm above level of soil at edges of garden beds. TURFING « Grass species to be ‘Seaisle 7’ e Turf to be first quality (A Grade), typical of the species, free from all pests, diseases & other deleterious matter. ¢ Turf to be guaranteed free from Oxalis and Nut Grass. ¢ Top of turfs to finish 40mm below adjacent kerbs, paths and edgings. e Turf to be laid by supplier, using best practices and materials. e Water whole of area thoroughly but lightly after completion of turfing & top dressing. ESTABLISHMENT e¢ The Contractor shall establish and maintain the landscaping works until the end of the Defects Liability Period. « Make good any defects due to inferior materials, workmanship or damage. « Carry out all necessary watering, weeding, pruning & plant replacements to ensure healthy growth. « Replace any dead or damaged piants with same species at the contractor's expense (except for vandalism). « Remove all debris and leave site in a clean and tidy manner.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0200 - Response to Information Request [As Published]Related documentApplication case desk ↗
About this file
- File size
- 581 KB (small file)
- File type
No other editions are linked here.