INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                                      22 JULY 2014


Other non-metallic bulky waste, including furniture and E-waste was compacted within the
compactor trucks and taken to landfill.

The contractor undertook sorting of the compacted material taken to the landfill, mainly to
segregate and collect any remaining metallic materials.

The Bulk Waste Collection Service was conducted over a period of 7 weeks. On several
weekends the Contractor was unable to complete the collection service on the specified weekend
due to the large increase in waste material presented; subsequently the waste collection
continued throughout the week until completed.

A small number of rural residents could not be provided with a Kerbside Bulk Waste Collection
Service due to difficulties related to the large front lift truck not being able to gain access to their
properties due to inadequate road access.

To overcome this issue Council provided a 15 cubic metre bin on the Kin Kin sports ground for
these residents. The bin was well utilised.

Staff are also arranging for 2 x 15 cubic metre bins at the North Shore Waste Transfer Station in
order to minimise any disadvantage to the North Shore residents.

Data Bulk Waste Collected

The service has not been undertaken since 2009 which resulted in a major increase in the
volume of waste collected.

Total waste collected 2014                         1,501 tonnes
Metal segregated and recycled                      315 tonnes
Waste sent to landfill                             1,186 tonnes
Waste collected 2009                               612 tonnes


2.    Positive Outcomes

1. The Bulk Waste Collection Service was very popular with the community.

2. A quantity of useful material left at the kerbside was collected by individuals within the
   community for the purpose of reuse.

3. A separate collection truck used for recovery of metal resulted in a good recovery of metallic
   items.

4. A total of 315 tonnes of metal was collected, valued at an estimated $58,905 when sold to
   recyclers. Cleanaway will share in some of the profits from the sale of the steel under the
   resource recovery contract.


3.    Areas for Improvement

1. Many members of the community ignored the information on the brochure and media in
   regard to prohibited material. Asbestos, batteries, mattresses and tyres in particular were
   commonly placed out for collection and placed at locations other than the location from which
   the items came from, in order to disguise responsibility.




                                                                                        Page 45 of 49
Log in to download the original file

2014-07-22 Infrastructure & Services Committee Agenda(PDF, 3MB).pdf · 3.5 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.