Council archive · source document
Delegated Report - Code - Planning - RAL26 0020 & OPW26 0090 (As Published) · RAL26/0020
Plan No. Rev. Plan/Document Name Date
- - Plan of Development – Proposed 26/01/2026
Subdivision of Lot 34 on RP179733
prepared by Danya Cook town Planning
Property Access and Driveways
4. A residential driveway must be constructed to Lot 1. The works must be undertaken in
accordance with the conditions of this Decision Notice and be generally in accordance with
Sunshine Coast Civil Engineers’ Site Works (C001, Rev. 01) dated 15 June 2026.
Stormwater Drainage
5. The site must be provided with a stormwater drainage system connecting to a lawful point of
discharge. The works must be undertaken in accordance with the conditions of this Decision
Notice.
Services
6. Reticulated electricity and telecommunication services must be provided to each lot in
accordance with the standards and requirements of the relevant service provider.
7. Unless otherwise stipulated by telecommunications legislation at the time of construction, the
development must be provided with all necessary conduits, pits and pipes to accommodate
the future connection of optic fibre technology telecommunications.
8. Certification must be submitted to Council from all relevant service providers (Energex, NBN
and Unitywater) which certifies that the development has met the requirements of this
Decision Notice and all applicable legislation at the time of construction.
Easements
9. Unless otherwise agreed in writing by the relevant service provider, any public or third party
infrastructure located on the subject site must be placed within an easement registered
against the title of the property.
10. All easements must be designed in accordance with the planning scheme and granted at no
cost to the Grantee. Where the Grantee is Council or a service authority, the easement
documentation must be in accordance with the Grantee’s standard easement terms. Draft
easement documentation must be submitted to Council for endorsement.
11. All works must be kept clear of any existing or proposed easements on the subject land,
unless agreed otherwise in writing by the Grantee.
Earthworks and Retaining Walls
12. All earthworks and associated batters/retaining structures, both above and below ground
level, both temporary and permanent, must be undertaken in accordance with an Operational
Works approval, and contained entirely within the subject site unless written permission from
the respective landowner(s) is provided to Council.
Page 7 of 14
Document Set ID: 25098866
Version: 8, Version Date: 03/09/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Delegated Report - Code - Planning - RAL26 0020 & OPW26 0090 (As Published).pdfRelated documentApplication case desk ↗
Delegated Report - Code - Planning - RAL26 0020 & OPW26 0090 (As Published)Related documentApplication case desk ↗
About this file
- File size
- 1.3 MB (small file)
- File type
No other editions are linked here.