Council archive · source document
08/0169 - Response to Information Request [As Published] · 132008.169
Seaview Terrace Rehabilitation Plan 2 1.0 GENERAL ‘Seaveiw Terrace, Sunshine Beach (Lot 1 on RPI97117). 1.1 INTRODUCTION This Rehabilitation Plan has been prepared in partial response to point 4.3 and 5.1 of the Sunshine Coast Regional Council Information Request (Ref 2008/169) and in response to dot point 4 of ‘Biodiversity, Protected Areas and Coastal Wetlands’ of the Environmental Protection Agency Information Request (Ref 323312). This plan provides details on the rehabilitation of portions of the development site located at 71 . The plan has been developed specifically to allow for rapid replacement of vegetation cleared as a result of development. Revegetation will be targeted towards rapid establishment of canopy elements in particular to reduce erosion. 1.2 RESPONSIBILITIES AND TIMING All rehabilitation works are to be undertaken by qualified, experienced bush regenerators. All contract staff are to undertake a site induction prior to the commencement of rehabilitation works to familiarise visitors with the sites ecological values and rehabilitation strategies. Any major proposed changes to the Rehabilitation Plan, including changes to the planting schedule or scheduled species, are to be approved by the Sunshine Coast Regional Council and the Environmental Protection Agency. CEPLA CHO012_Rehab_R vers2_4 3 09.doc 5 March 2009
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0169 - Response to Information Request [As Published]Related documentApplication case desk ↗
About this file
- File size
- 9.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.