Skip to the record
For the highest quality transcripts.

Original source · versioned page text

2020-04-30 Ordinary Meeting Agenda

of 60

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

                       AGENDA


            Ordinary Meeting

              Thursday, 30 April 2020

                    commencing at 1pm
           Council Chambers, 9 Pelican Street, Tewantin




Crs Clare Stewart (Chair), Karen Finzel, Joe Jurisevic, Amelia Lorentson,
Brian Stockwell, Tom Wegener, Frank Wilkie



                    “Noosa Shire – different by nature”
Log in to download the original file

2020-04-30 Ordinary Meeting Agenda(PDF, 4MB).pdf · 4.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 59 sections

Section 2

ORDINARY MEETING AGENDA                                           30 APRIL 2020


TABLE OF CONTENTS

ITEM                                                                       PAGE

1      ATTENDANCE & APOLOGIES                                                 3

2      CONFIRMATION OF MINUTES                                                3

3      MAYORAL MINUTES                                                        3

4      PETITIONS                                                              3

5      NOTIFIED MOTIONS                                                       3

6      PRESENTATIONS                                                          3

7      DEPUTATIONS                                                            3

8      CONSIDERATION OF COMMITTEE RECOMMENDATIONS                             3

9      ORDINARY MEETING REPORTS                                               4

       1   FINANCIAL PERFORMANCE REPORT – MARCH 2020                          4

       2   MCU19/0132 - DEVELOPMENT APPLICATION FOR MATERIAL CHANGE OF
           USE FOR ENTERTAINMENT & DINING BUSINESS TYPE 2 RECREATION,
           AMUSEMENT & FITNESS (24 HOUR GYM) AT 24 VENTURE DRIVE,
           NOOSAVILLE                                                        17

       3   MCU19/0066 - MATERIAL CHANGE OF USE – COMMERCIAL BUSINESS -
           TYPE 1 OFFICE AT 2197 DAVID LOW WAY, PEREGIAN BEACH               28

       4   MCU18/0166 - PLANNING & ENVIRONMENT COURT APPEAL NO DB897 OF
           2020 – REFUSAL OF APPLICATION FOR MATERIAL CHANGE OF USE FOR
           SERVICE & UTILITY - TYPE 3 (TOWER) AT 244 TABLELANDS ROAD,
           COORAN                                                            41

       5   RAL18/0023 - PLANNING & ENVIRONMENT COURT APPEAL NO 765 OF
           2020 – REFUSAL OF APPLICATION FOR RECONFIGURING A LOT (1 INTO
           23 LOTS) AT 28 EENIE CREEK ROAD, NOOSAVILLE                       46

       6   COUNCIL MEETING STRUCTURE AND TIMETABLE                           51

10     CLOSED SESSION                                                  60

11     PUBLIC QUESTION TIME                                                  60

12     NEXT MEETING                                                          60

13     MEETING CLOSURE                                                       60




                                                                    Page 2 of 60

Section 3

ORDINARY MEETING AGENDA                                                        30 APRIL 2020



1   ATTENDANCE & APOLOGIES




2   CONFIRMATION OF MINUTES

    The Minutes of the Ordinary Meeting held on 19 March 2020 be received and confirmed.

    The Minutes of the Post Election Meeting held on 17 April 2020 be received and confirmed.




3   MAYORAL MINUTES




4   PETITIONS




5   NOTIFIED MOTIONS

    Nil.




6   PRESENTATIONS

    Nil.




7   DEPUTATIONS

    Nil.




8   CONSIDERATION OF COMMITTEE RECOMMENDATIONS

    Nil.




                                                                                  Page 3 of 60

Section 4

ORDINARY MEETING AGENDA                                                                            30 APRIL 2020


9      ORDINARY MEETING REPORTS


1      FINANCIAL PERFORMANCE REPORT – MARCH 2020

Author                Director Corporate Services, Michael Shave
                      Corporate Services Department

Index                 ECM/ Subject/ 22.09 – Monthly Financial Performance Report

Attachments           1.     Statement of Income and Expenditure (Profit & Loss and Capital)
                      2.     Statement of Financial Position
                      3.     Statement of Cash Flows


EXECUTIVE SUMMARY
Year to date (YTD) operating performance against current budget as at 31 March 2020 remains
positive, with operating revenue currently above budget and operating expenditure below budget.
Council’s net operating position will be impacted from March through to June 2020 by the COVID-
19 pandemic, due to lost revenues associated with the closure of key community facilities, business
and community financial support measures, observed reductions in waste management collection
charges and disposal fees, and additional expenditures incurred for cleaning, personal protective
equipment, lifeguard contract services etc.

Financial stress testing is currently in progress to determine COVID-19 pandemic implications for
the 2019/20 budget, development of 2020/21 budget and 10 year forecast.

 YTD Financial Performance Summary
                              Budget         Actual     Variance      Variance          YTD         30 June
                                 $m             $m           $m             %          Status       Forecast

 Operating Revenue              $90.4         $91.1           $0.7          0.7%      On Track     Below Budget
 Operating Expense              $72.0         $70.7           $1.3          1.9%      On Track       On Track
 Operating Position             $18.4         $20.4           $2.0          10.8%
 Capital Revenue                  $4.4          $6.8          $2.4          54.2%   Above Budget     On Track
 Capital Expenditure*           $19.8         $15.5           $4.3          21.7%   Below Budget     On Track
* Reflects constructed assets and intangibles only (excludes contributed)


Financial statements including Statement of Income & Expenditure, Statement of Financial Position
(balance sheet), and Statement of Cash Flows are included as attachments for information for
Council.




                                                                                                     Page 4 of 60

Section 5

ORDINARY MEETING AGENDA                                                                         30 APRIL 2020


Figure 1: Actual Performance Compared to Budget

 $100                                         YTD Budget ($m)
                       $90.4       $91.1
   $90                                        YTD Actual ($m)
   $80                                                             $72.0       $70.7
   $70
   $60
   $50
   $40
   $30
   $20
   $10
     $-
                     Operating Revenue                          Operating Expenditure

YTD performance against Council’s key measures of financial sustainability have been calculated
as at March 2020. These indicators enable the reader to assess Council’s success in managing its
budget, cash and debt as well as undertaking sustainable asset management. The table below
contains a snapshot of a number of key measures, with full detail included in the report.

 YTD Measures of Financial Sustainability
                                   Target          Target            Current           Actual      30 June
                                   Value            Date             Budget             YTD         Status
 Operating Surplus Ratio           0-10%       30 June 2020            0.0%            22.4%        Watch
 Net Financial Liabilities Ratio   <60%           Ongoing             -9.4%            -40.1%      On Target
 Cash Cover Ratio                  3 months       Ongoing          6.6 months     11.5 months      On Target
 Asset Sustainability Ratio        > 90%       30 June 2020           129%             53.9%       On Track


RECOMMENDATION
That Council note the report by the Director Corporate Services to the Ordinary Meeting dated 30
April 2020 outlining March 2020 year to date financial performance against budget, including key
financial sustainability indicators.


REPORT
Operating Revenue (YTD Benchmark 75.0%)
Council has received 91% ($91.1 million) of its operating revenue budget ($99.9 million).
Commentary on each revenue category is provided below.

 Category              Summary                          Comments
 Rates and Levies      $69.2 million (101%) of the         General rates $138k above YTD budget (100% or
                       annual budget of $68.7 million       $51.1 million of $51.0 million budget earned)
                       has been earned                     Waste utility charges $242k above YTD budget
                                                            (102% or $13.1 million of $12.8 million budget
                                                            earned) – this positive variance will reduce back
                                                            to budget in April 2020 as businesses reduce
                                                            waste collection services due to the COVID-19
                                                            pandemic



                                                                                                  Page 5 of 60

Section 6

ORDINARY MEETING AGENDA                                                                     30 APRIL 2020


Category            Summary                          Comments
Fees         and    $5.4 million (81%) of the $6.7      Plumbing application fees $119k above YTD
Charges             million annual budget has            budget (92% or $894k of $971k budget earned)
                    been earned                         Cemetery fees $80k above YTD budget (110% or
                                                         $251k of $229k budget earned)
                                                        Building application fees $44k below YTD budget
                                                         (69% or $503k of $730k budget spent)
                                                        Development related fees $103k below YTD
                                                         budget (68% or $1.1 million of $1.6 million budget
                                                         earned)
                                                        Building compliance fees $44k below YTD budget
                                                         (69% or $503k of $730k budget earned)
Sale of Goods       $7.1 million (70%) of the           Waste management disposal fees and recyclable
and Services        $10.1 million budget has been        sales $152k below YTD budget (71% or $3.1
                    received                             million of $4.3 million budget earned) – Waste
                                                         disposal restrictions in place due to the COVID-19
                                                         pandemic will impact on disposal revenues (yet to
                                                         be quantified) and potentially recyclable sales.
                                                        Holiday Park sales $159k below YTD budget
                                                         (71% or $2.0 million of $3.1 million budget
                                                         earned) – Park closures due to the COVID-19
                                                         pandemic will result in full year revenue shortfall
                                                         of approximately $1 million should closures
                                                         remain in place through to June 2020
                                                        Community Facilities (NAC, NLC and The J) $42k
                                                         below YTD budget (74% or $1.9 million of $2.5
                                                         million budget earned) – Facility closures due to
                                                         the COVID-19 pandemic will result in full year
                                                         revenue shortfall of approximately $670k should
                                                         closures remain in place through to June 2020
Interest Received   $1.3 million (89%) of the $1.4      Interest on overdue rates and charges $94k
                    million annual budget has            above YTD budget (94% or $374k of $400k
                    been earned                          budget earned)
                                                        Investment interest revenue $77k above YTD
                                                         budget (87% or $884k of $1.0 million budget
                                                         earned)
                                                        Recent downward movements in interest rates
                                                         and COVID-19 pandemic cash flow impacts will
                                                         be monitored for any negative impact on the
                                                         overall interest revenue budget
Rental and Lease    $1.8 million (80%) of the $2.3      Rental and lease revenue budgets will be
/ Other Revenue     million budget has been              impacted by the COVID-19 pandemic, with relief
                    earned                               provided to tenants and lessees due to facility and
                                                         business closures
                                                        A full year budget shortfall of approximately $380k
                                                         is expected with business rent relief provided
                                                         through to June, and should facility closures
                                                         remain in place through to June 2020
Operating           $3.2 million (64%) of the $5.0      50% or $1.1 million of the financial assistance
Grants,             million budget has been              grant was prepaid in June 2019 and may impact
Subsidies           received                             on Council’s 2019/20 final operating position if the
                                                         prepayment approach is discontinued by the
                                                         Australian government
                                                        All other operating grants are in line with budget
                                                         forecasts at this stage



                                                                                              Page 6 of 60

Section 7

ORDINARY MEETING AGENDA                                                                                          30 APRIL 2020


 Category             Summary                                       Comments
 Unitywater           On track                                          Unitywater distributions are fixed each year so
 Distributions                                                           little budget variance risk
                                                                        Unitywater have advised that distributions will not
                                                                         change due to any COVID-19 impacts on its
                                                                         financial position

Figure 2: Operating Revenue Position by Type (Excluding Rates)

  $8.0                                     $7.5
                                                  $7.1
  $7.0
                                                                             YTD Budget ($m)
  $6.0   $5.2 $5.4
                                                                             YTD Actual ($m)
  $5.0
  $4.0
                                                                                      $3.0 $3.2   $3.1 $3.1
  $3.0
  $2.0                              $1.3
                      $1.1                               $1.0 $0.9
                                                                        $0.8 $0.9
  $1.0
  $0.0
                                            Goods &




                                                          Income




                                                                            Other
            Charges




                                                                                        Grants




                                                                                                    Unitywater
                                            Services
                                            Sales of




                                                           Rental
                         Interest
            Fees &




                                                                                                     Share of
Operating Expenditure (YTD Benchmark 75.0%)
Actual operating expenditure is currently 71% ($70.7 million) of full year budget ($99.8 million).
Detailed commentary for each expenditure category is provided below.

 Category             Summary                                       Comments
 Employee Costs       $23.5 million (70%) of the                        Under expenditure for permanent staff salaries
                      annual budget of $33.5                             and wages ($2.1 million) partially offset by
                      million has been expended                          additional spend on casual staff and external
                                                                         labour hire ($839k)
                                                                        Employee overtime and allowances $331k above
                                                                         YTD budget (110% or $1.0 million of $953k
                                                                         budget spent) in part due to recent fire events
                                                                        Staff training $41k below budget (39% or $133k
                                                                         of $337k budget spent) – impacted on staff travel
                                                                         restrictions due to the COVID-19 pandemic
 Materials and        $31.8 million (69%) of the                        Waste Management materials and services
 Services             $45.9 million annual budget                        $474k below YTD budget (68% or $7.3 million of
                      has been expended.                                 $10.6 million budget spent) primarily due to landfill
                                                                         and collection contract under expenditure
                                                                        Holiday Parks $133k below YTD budget (64% or
                                                                         $882k of $1.4 million budget spent) – delay in
                                                                         planned opening of North Shore Campground
                                                                         (offset by lower revenue and COVID-19 related
                                                                         closure)
                                                                        Community Properties $122k below YTD budget
                                                                         (39% or $172k of $444k budget spent) – timing of
                                                                         maintenance and utility charges



                                                                                                                   Page 7 of 60

Section 8

ORDINARY MEETING AGENDA                                                                                      30 APRIL 2020


 Category                   Summary                                   Comments
                                                                       Canals and Waterways $116k below YTD budget
                                                                         (23% or $38k of $166k budget spent) – timing of
                                                                         contracted canal dredging works
                                                                       Library services $81k below YTD budget (60% or
                                                                         $642k of $1.1 million budget spent) – timing of
                                                                         library collection purchases and programs
                                                                       Public Amenity materials and services $63k below
                                                                         YTD budget (67% or $330k of $495k budget
                                                                         spent)
                                                                       Disaster Management $100k above YTD budget
                                                                         (419% or $100k of $27k budget spent) –traffic
                                                                         control and other contract costs associated with
                                                                         fire events. QRA grant claim has been submitted
                                                                         to partially recover costs.
                                                                       Hastings Street Maintenance Levy $266k above
                                                                         YTD budget (217% or $489k of $225k budget
                                                                         spent) – tree lighting replacement program to be
                                                                         funded from reserve
                                                                       Development assessment legal appeals costs
                                                                         $137k above YTD budget (95% or $952k of $1.0
                                                                         million budget spent)
                                                                       Development application costs $119k above YTD
                                                                         budget (194% or $194k of $100k budget spent)
 Finance Costs              On track                                  Nil
 Depreciation               On track                                  Nil
 Other Expenses             On track                                  Nil

Figure 3: Operating Expenditure Position by Type

$35.0                             $32.5 $31.8
                                                                      YTD Budget ($m)
$30.0
            $24.2 $23.5
                                                                      YTD Actual ($m)
$25.0

$20.0
                                                                              $14.0 $14.1
$15.0

$10.0

 $5.0
                                                   $1.1 $1.2
                                                                                                 $0.2 $0.2
 $0.0
                                       Materials




                                                                                  Depreciation
                Employees




                                                      Finance Costs




                                                                                                    Other




                                                                                                               Page 8 of 60

Section 9

ORDINARY MEETING AGENDA                                                                                               30 APRIL 2020


Capital Revenue
YTD capital revenue of $6.8 million received comprises cash contributions from developers ($1.7
million) and capital grants ($5.0 million). Included in capital revenue is an unbudgeted grant for
bushfire disaster recovery ($1.3 million) and an early milestone grant payment for the Orealla bridge
replacement project ($1.4 million). Note that the timing of capital grant receipts are generally
dependent on the timing of grant conditions and also capital delivery performance, and that the timing
of the receipt of developer contributions (both cash and contributed) is unpredictable.

Figure 4: Capital Revenue by Type

 $6.0
                                                                        $5.0
 $5.0
                                                                                  YTD Budget ($m)
                                                                                  YTD Actual ($m)
 $4.0

 $3.0                                                $2.7


 $2.0          $1.7                   $1.7


 $1.0
                                                                                         $0.1                  $0.1
 $0.0
                      Contributions




                                                                                                 Contributed
                                                            Subsidies
                                                             Grants /




                                                                                                   Assets
                         Cash




Capital Program
Actual capital expenditure (excluding contractual commitments) is $15.5 million (YTD budget $19.8
million). Detailed discussion of progress in the delivery of the capital works program is provided
through a separate report by the Asset Planning Manager.

Figure 5: Capital Program Delivery Performance

$18.0                   $16.8

$16.0
                                             $13.6      YTD Budget ($m)
$14.0                                                   YTD Actual ($m)
$12.0
$10.0
 $8.0
 $6.0
 $4.0                                                                          $3.0
                                                                                             $1.9
 $2.0
 $0.0
                                Capital works                                    Other capital




                                                                                                                        Page 9 of 60

Section 10

ORDINARY MEETING AGENDA                                                                                           30 APRIL 2020


Cash Management and Investment Performance
Total cash on hand at the end of March 2020 was $76 million. Cash on hand will now degrade by
approximately $40 million as operational and capital costs are incurred through to June 2020.
Financial stress testing is currently occurring to understand the additional cash flow impacts of the
COVID-19 pandemic through to June (in addition to business as usual costs).

The following pie charts present the mix of cash held at March 2020 by agency (graph on the left)
and by credit risk rating (graph on the right). All funds have been invested in accordance with the
Investment Policy and in consideration of the principles of ethical investment, preservation of capital,
return on investment and counterparty thresholds.

Figure 6: Closing Cash Held by Agency and Credit Rating

                                                                                                         A3
                     Bendigo                                                                           (Bendig
                 CBA   3%                                                                                 o)
                 7%                                                                                A1 +
                                                                                                         3%
                                                                                                 (CBA +…




                                     QTC                                                                         A1 +
                                     90%                                                                        (QT…




The following chart monitors the 12-month trend on total cash and the agencies invested. No
investments or deposit draw-downs were made during March, with sufficient cash being held in
Council’s operating bank accounts to fund the delivery of services for the month.

Figure 7: 12 Month Trend of Cash Invested by Agency
90,000,000


80,000,000


70,000,000


60,000,000


50,000,000


40,000,000


30,000,000


20,000,000


10,000,000


        -
            Apr-19 May-19   Jun-19   Jul-19   Aug-19   Sep-19 Oct-19   Nov-19 Dec-19   Jan-20   Feb-20 Mar-20


             Bendigo TD      Westpac TD         NAB TD       Suncorp TD       CBA TD       QTC       CBA Operating



                                                                                                                     Page 10 of 60

Section 11

ORDINARY MEETING AGENDA                                                               30 APRIL 2020


Measures of Financial Sustainability
The following table incorporates a set of financial sustainability indicators to further assist in
managing Council financial performance. There are no current material emerging risks regarding
performance to date for the financial year.

 Category                                                         Comments
 Operating Surplus Ratio                                             Intent: Identifies the extent to
                                                                      which       revenues        cover
                                                                      operational expenses, to ensure
                                                                      community      equity    is    not
                                                                      degraded
                                                                     Target: 0 – 10%
                                                                     Target Date: 30 June
                                                                     Result: 22.4%
                                                                     Comment: The ratio will decline
                                                                      from March to June as January
                                                                      rates are expended on the
                                                                      delivery of Council services, and
                                                                      COVID-19 pandemic financial
                                                                      impacts are realised

 Cash Expense Cover                                                  Intent: Indicates how long
                                                                      council can continue paying its
                                                                      day-to-day expenses from cash
                                                                      at    bank    without    needing
                                                                      additional cash flows
                                                                     Target: > 3 months
                                                                     Target Date: Ongoing
                                                                     Result: 11.5 months
                                                                     Comment: Whilst current cash
                                                                      cover remains above target,
                                                                      business as usual expenditure
                                                                      and      COVID-19      pandemic
                                                                      financial impacts through to 30
                                                                      June 2020 will degrade Council’s
                                                                      cash holdings. Analysis is
                                                                      currently      occurring        to
                                                                      understand COVID-19 pandemic
                                                                      financial           sustainability
                                                                      implications
 Asset Sustainability Ratio                                          Intent: Measures the extent to
                                                                      which assets are being replaced
                                                                      as their condition degrades to
                                                                      ensure service potential is
                                                                      maintained
                                                                     Target: 90% of depreciation
                                                                      budget spent on renewals
                                                                      annually
                                                                     Target Date: 30 June
                                                                     Result: Slightly under budget
                                                                     Comment: The actual result will
                                                                      progressively increase each
                                                                      month as expenditure on
                                                                      renewal projects occurs.



                                                                                        Page 11 of 60

Section 12

ORDINARY MEETING AGENDA                                30 APRIL 2020


Category                          Comments
Net Financial Liabilities Ratio      Intent: Outlines the level that net
                                      Council debt can be serviced by
                                      operating revenues. A ratio
                                      below zero implies that liabilities
                                      are less than cash (and other
                                      current assets) and there is
                                      adequate borrowing capacity
                                      available if needed.
                                     Target: less than 60%
                                     Target Date: Ongoing
                                     Result: (40.1%)
                                     Comment: Council has low debt
                                      levels and strong cash holdings
                                      reflected in the YTD result.
                                      COVID-19 pandemic financial
                                      impacts through to 30 June 2020
                                      will reduce the ratio performance
                                      as current assets reduce
Investment Return                    Intent:   Ensure     appropriate
                                      return on investment yield for
                                      cash at bank.
                                     Target: 0.25% above current
                                      Bloomberg commonwealth 10
                                      year bond rate yield (March =
                                      1.18%)
                                     Target Date: Ongoing
                                     Result: 1.83%
                                     Comment: Regardless of the
                                      steady decline in long term bond
                                      rates (due to current economic
                                      conditions),            Council’s
                                      investment return still remains
                                      above target
Rates in Arrears                     Intent: Ensuring that the amount
                                      of     unpaid     rates    remains
                                      sustainable and does not
                                      negatively impact cash flows and
                                      ability to provide services
                                     Target: 5% industry benchmark
                                     Target Date: Ongoing
                                     Result: 8.3%
                                     Comment: Ratepayer payment
                                      plans and external debt recovery
                                      measures for rate arrears have
                                      been put on hold due to the
                                      COVID-19 pandemic. The rate
                                      arrears ratio will likely increase
                                      as the economic impacts of the
                                      pandemic are realised over the
                                      next 12-24 months. Analysis is
                                      currently        occurring       to
                                      understand                financial
                                      sustainability implications




                                                        Page 12 of 60

Section 13

ORDINARY MEETING AGENDA                                                                      30 APRIL 2020


Previous Council Consideration
Nil.

Finance
As above.

Risks & Opportunities
Council’s strategic risk register includes a number of risks that could impact on ongoing financial
sustainability. Effective budget management and reporting is an important risk mitigation tool.

Consultation
External Consultation - Community & Stakeholder
Nil.

Internal Consultation
All areas of Council are consulted as part of the regular monitoring of budget performance.

Departments/Sections Consulted:

 X     Chief Executive Officer   X   Community Services                      X   Corporate Services
       Executive Officer             Director                                X   Director
       Executive Support             Community Development                   X   Financial Services
                                     Community Facilities                        ICT
                                     Libraries & Galleries                       Procurement & Fleet
                                     Local Laws                                  Property
                                     Waste & Environmental Health                Revenue Services

 X     Executive Services        X   Environment & Sustainable Development   X   Infrastructure Services
       Director                      Director                                    Director
       Community Engagement          Building & Plumbing Services                Asset Management
       Customer Service              Development Assessment                      Buildings and Facilities
       Governance                    Economic Development                        Civil Operations
       People and Culture            Environmental Services                      Disaster Management
                                     Strategic Land Use Planning                 Infrastructure Planning,
                                                                                 Design and Delivery




                                                                                              Page 13 of 60

Section 14

ATTACHMENT 1




  Page 14 of 60

ATTACHMENT 1

  Profit and Loss Statement

  Revenue
      Recurrent Revenue
      Rates, levies and charges                                68,702          68,702           69,162              461        101%
      Fees and charges                                          6,642            5,236           5,390              154         81%
      Interest received                                         1,410            1,067            1,259             192         89%
      Sale of Goods and major services                         10,127            7,487           7,133             (353)        70%
      Sale of contract and recoverable works                      23                 -               1                1         5%
      Rental & lease income                                     1,296            1,039            944               (95)        73%
      Other income                                               985              768              889              121         90%
      Grants, subsidies, contributions and donations            4,999            3,045           3,224              179         64%
      Unitywater Distributions                                  5,650            3,089           3,089                 -        55%
                                                              99,833           90,432           91,091              659         91%
  Expenses
      Recurrent Expenses
      Employee benefits                                        33,517          24,212           23,480             (732)        70%
      Materials and services                                  45,863           32,475           31,791             (683)        69%
      Finance costs                                             1,528            1,146            1,197              51         78%
     Depreciation                                              18,713           14,035          14,063               28         75%
      Other expenses                                             188              158              161                3         85%
                                                              99,809           72,026           70,692           (1,334)        71%
OperatingResult                                                               18,406           20,309              998
  Summary of Capital Revenue and Expenditure
  Capital Funding
      Capital cash contributions and infrastructure charges     2,134            1,662            1,710              48         80%
      Contributed assets                                        2,000             124              124                 -        6%
      Capital grants and subsidies                              5,281            2,650           5,008            2,358         95%
      Cash / revenue                                           27,337           19,410          15,220           (4,190)        56%
      New loan borrowings                                           -                -                -                -        0%
      Other capital revenue                                         -                -                -                -        0%
 Total CapitalRevenue                                        86,753           23,845           22,062          (TBA)
  Capital Expenditure
      Contributed assets                                        2,000             124              124                 -        6%
      Capital works - constructed assets                       26,091           16,795          13,637           (3,158)        52%
      Capital works - other capital                             4,781            3,047            1,894          (1,153)        40%
      Loan repayments                                           3,880            3,880           3,950               70        102%
      Other capital expenses                                        -                -           2,457            2,457         0%
Total Capital Expenditure =                                   86,753           23,845          22,062           (4.784)

                                                                                                                  Page 14 of 60

Section 15

ATTACHMENT 2




  Page 15 of 60

ATTACHMENT 2

  Current Assets
       Cash and cash equivalents                                       43,942                 76,251                  55,981
       Trade and other receivables                                      9,290                  8,840                   6,666
       Inventories                                                        198                    213                     198
       Other current assets                                             2,466                  3,123                   4,541
                                                                       55,897                 88,426                  67,386
       Non Current Assets held for sale                                     -                       -                      -
  Total Current Assets                                                 55,897                 88,426                  67,386
  Non Current Assets
       Trade and other receivables                                     49,718                 49,718                  49.718
       Other non current Assets                                             -                       -                      -
       Investments                                                     60,978                 60,978                  60,978
       Investment property                                              3,300                  3,300                   3,300
       Property, plant and equipment                                  916,382                884,328                 885,912
       Intangible assets                                                7,170                  6,612                   5,953
  Total Non Current Assets                                          1,037,548              1,004,936               1,005,861
TotalAssets                                                         4,093,445             1,093,362               1,073,247
  Current Liabilities
       Trade and other payables                                         5,078                 10,912                   9,594
       Borrowings                                                       2,414                    103                   3,112
       Provisions                                                       4,630                  3,157                   4,918
      Other                                                             2,778                  1,553                   2,768
  Total Current Liabilities                                            14,900                 15,724                  20,392
  Non Current Liabilities
       Trade and other payables                                             -                       -                      -
       Borrowings                                                      19,555                 21,120                  21,120
       Provisions                                                      12,054                 11,523                  11,523
  Total Non Current Liabilities                                        31,608                 32,643                  32,643
Totalliabilities |                                                    46,508                 48368                  53,035.
NetCommunityAssets                                                1,046,937              1,044,994               1,020,212
  Community Equity
       Asset Revaluation Surplus                                       68,337                 50,809                  50,809
       Retained Surplus / (Defeciency)                                      -                       -                      -
       Shire Capital                                                  978,600               969,402                  951,918
       Current Year Net Earnings                                            -                 24,783                  17,485
TotalCommunityEquity =                                            1,046,937               1,044,994               1,020,212

                                                                                                       Page 15 of 60

Section 16

ATTACHMENT 3




  Page 16 of 60

ATTACHMENT 3

Cash flows from operating activities

     Cash Flows from Operating Activities

     Receipts from Customers                                                    85,969              83,961               92,597
     Payments to Suppliers and Employees                                        (84,340)            (59,502)            (78,821)
                                                                                  1,629             24,458               13,776
     Receipts:
     Investment and Interest Revenue Received                                    4,010               2,454                4,763
     Rental Income                                                                1,290                944                1,281
     Non Capital Grants and Contributions                                        4,976               3,224                5,447
     Income Tax Equivalent Received                                               1,200               1,247               1,754
     Income from Equity Investments                                               1,850               646                 1,487
     Payments:
     Borrowing Costs                                                                  -                   -                   -
     Interest Expense                                                            (1,282)               (123)               (133)

Cash Flows from Investing Activities

     Receipts:
     Proceeds of Sale of Property, Plant and Equipment                              10                  38                  383
     Grants, Subsidies, Contributions and Donations                              7,415               6,718                5,140
     Payments:
     Payments of Property, Plant and Equipment                                  (28,809)            (14,217)            (24,848)
     Payments for Intangible Assets                                              (2,063)             (1,294)             (1,347)
     Net Movement in Loans and Advances                                               -                125                 (625)

Cash Flows from Financing Activities

     Receipts:
     Proceeds from Borrowings                                                         -                   -                   -
     Payments:
     Repayment of Borrowings                                                     (2,264)             (3,950)            (15,290)

     Cash and Cash Equivalents at the beginning of the reporting period         55,981              55,981               64,193

                                                                                                            Page 16 of 60

Section 17

ORDINARY MEETING AGENDA                                                                30 APRIL 2020



2    MCU19/0132 - DEVELOPMENT APPLICATION FOR MATERIAL CHANGE OF USE FOR
     ENTERTAINMENT & DINING BUSINESS TYPE 2 RECREATION, AMUSEMENT & FITNESS
     (24 HOUR GYM) AT 24 VENTURE DRIVE, NOOSAVILLE

Author             Development Planner, Billy Glover
                   Environment and Sustainable Development Department

Index              ECM/ Application/ MCU19/0132

Attachments        1.   Proposal Plan


APPLICATION DETAILS

Applicant                      APPJ Holdings Pty Ltd

Proposal                       Material Change of Use - Entertainment & Dining Type 2 Recreation,
                               Amusement & Fitness
Properly Made Date             1 November 2019
Information Request Date       29 November 2019

Information Response Date      19 December 2019
Decision Due Date              4 March 2020
Number of Submissions          Nil



PROPERTY DETAILS

Property Address               24 Venture Dr, Noosaville
RP Description                 Lot 15 SP 216079
Land Area                      1,648.99m²
Existing Use of Land           Vacant Building (Approved for Industrial Business Type 2 Production,
                               alteration, repackaging & repairing)



STATUTORY DETAILS

SEQRP Designation              Urban Footprint
Locality                       Noosaville
Zone                           Industry
Overlays                       Biodiversity (Environmental Protection Area)
                               Natural Hazard (Acid Sulfate Soils)
Assessment Type                Impact




                                                                                        Page 17 of 60

Section 18

ORDINARY MEETING AGENDA                                                            30 APRIL 2020


RECOMMENDATION
That Council note the report by the Development Planner to the Ordinary Meeting dated 30 April
2020 regarding Application No. MCU19/0132 for a Development Permit for Material Change of Use
– Entertainment & Dining Business Type 2 Recreation, Amusement & Fitness (Gym), situated at 24
Venture Dr, Noosaville and:
A.   Approve the application in accordance with the following conditions:
     PLANNING
           When Conditions must be Complied With
     1.    Unless otherwise stated, all conditions of this Decision Notice must be complied with,
           and then compliance maintained at all times while the use continues.
           Approved Plans
     2.    Development undertaken in accordance with this approval must generally comply with
           the approved plans of development. The approved plans are listed in the following table
           unless otherwise amended by these conditions.

             Plan No.     Rev.    Plan/Document Name                            Date

             A.101        C       Site Plan, drawn by Zest Design               26/02/2020

           Nature and Extent of Approved Use
     3.    The maximum number of patrons on site at any one time must not exceed 27, with up to
           2 staff permitted on site at any one time.
     4.    An online booking system must be used at all times to ensure the maximum number of
           persons on site at any one is managed and does not exceed 27 patrons.
     5.    The gym must be staffed at a minimum between 7am -10am and 3pm – 6.30pm each
           day to monitor patron numbers and ensure the maximum patron numbers are not
           exceeded.
           Bicycle Parking and End of Trip Facilities
     6.    A minimum of 5 bicycle parking spaces, 5 lockers and 2 shower cubicles must be
           provided on site.
           Landscaping
     7.    A minimum of 15% of the site must be retained as landscaped area and landscaped in
           accordance with the Noosa Plan and local planning scheme policy.
           Amenity
     8.    The development must be undertaken and operated in a manner that causes no
           detrimental effect upon the amenity of the area by reason of the creation of excessive
           noise, lighting nuisance or other emissions.
           Advertising Signage
     9.    Any advertising sign or device must comply with Council’s policies on advertising.
           Currency Period
     10.   The Currency Period for this development approval lapses if the use has not happened
           by 30 April 2026, unless an application to extend the currency period is approved by
           Council.
     11.   This development approval lapses 2 years after the commencement of the use, unless
           further extended by Council in writing. On commencement of the use written notification
           must be given to Council advising of the commencement day.

                                                                                    Page 18 of 60

Section 19

ORDINARY MEETING AGENDA                                                            30 APRIL 2020


          ENGINEERING
          Car Parking
    12.   A minimum of 18 car parking spaces and 4 motorcycle/motor scooter spaces must be
          provided and marked on the site, and made available and accessible at all times while
          the use is open for business. The works must be undertaken in accordance with an
          Operational Works approval and must include in particular:
          a.   2 staff parking spaces within the total, which are clearly marked for that purpose;
          b.   provision of vandal resistant public lighting with intensities to satisfy the
               requirements of Australian Standard AS1158: Public Lighting Code;
          c.   1 disabled parking space/s within the total;
          d.   crossfalls and gradients in accordance with Australian Standard AS2890: Parking
               Facilities.
    13.   All car parking areas and access driveways must be maintained exclusively for vehicle
          parking and manoeuvring and kept in a tidy and safe condition at all times.
    14.   Directional signage must be provided to direct visitors and customers to the car parking
          spaces provided on site.
    15.   All carparking must be line-marked generally as shown on drawing A.101, titled “Site
          Plan”, Rev C, dated 26/02/2020, prepared by Zest Design.
          Stormwater Drainage
    16.   Stormwater runoff from the development must be disposed of without causing scour or
          damage to the subject site or any adjoining property.
          Electricity and Telecommunication Services
    17.   Unless otherwise stipulated by telecommunications legislation at the time of
          construction, the development must be provided with all necessary conduits, pits and
          pipes to accommodate the future connection of optic fibre technology
          telecommunications.
          Easements
    18.   Unless otherwise agreed in writing by the relevant service provider, any public or third
          party infrastructure located on the subject site must be placed within an easement
          registered against the title of the property.
    19.   All easements must be designed in accordance with the planning scheme and granted
          at no cost to the Grantee. Where the Grantee is Council or a service authority, the
          easement documentation must be in accordance with the Grantee’s standard easement
          terms. Draft easement documentation must be submitted to Council for endorsement.
    20.   All works must be kept clear of any existing or proposed easements on the subject land,
          unless agreed otherwise in writing by the Grantee.
          Damage to Services and Assets
    21.   Any damage caused to existing services and assets as a result of the development works
          must be repaired at no cost to the asset owner at the following times:
          a.   where the damage would cause a hazard to pedestrian or vehicle safety,
               immediately; or
          b.   where otherwise, upon completion of the works associated with the development.
          Any repair work which proposes to alter the alignment or level of existing services and
          assets must first be referred to the relevant service authority for approval.


                                                                                    Page 19 of 60

Section 20

ORDINARY MEETING AGENDA                                                             30 APRIL 2020


B.   Find the following are sufficient grounds to justify the decision despite the conflict with the
     Planning Scheme:
     1.     Some sport and recreational uses are accepted in the Industry zone given the limited
            potential impacts of sport and recreation uses;
     2.     The fitness centre is of a similar size and scale to other approved gyms within the
            Noosaville Industrial area; and
     3.     The proposed gym is consistent with the outcomes sought for the Venture Drive
            Enterprise Precinct under the draft planning scheme.
C.   Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.


REPORT
1.   PROPOSAL
The applicant seeks approval for a Material Change of Use - Entertainment & Dining Type 2
Recreation, Amusement & Fitness for a 24 hour gym.
The applicant proposes to relocate the existing Anytime Fitness gym to the subject site and tenancy
from the current Noosa Civic location. The applicant submits the following:
     The proposed use is one of a traditional gymnasium which is open for patron use 24-hours a
     day, 7-days a week. Anytime Fitness currently operates from a site located within the Noosa
     Civic Shopping Complex, and is looking to relocate to the subject site.
     The use areas of the development will comprise office area, cardio equipment area, boxing
     and crossfit rings, sled track, free weights, gymnasium machine activity space, and change
     rooms including toilets and showers.
     The applicant proposes the following specifics in relation to the proposed Anytime Fitness
     Noosa gym:
      It is open to members 24 hours a day, 7 days a week
      Timetabled group training sessions are not offered
      Members are able to book their workout slot online
         Capped at a maximum of 29 members at any one time with a maximum of 2 staff on site
          at any time
The locality and proposal plans are included below.




                                       Figure 1 – Site Locality


                                                                                     Page 20 of 60

Section 21

ORDINARY MEETING AGENDA                                                              30 APRIL 2020




                                          Figure 2 – Site Plan


2.   SITE DETAILS
2.1. Background
The subject site was created and developed circa 2016. The existing building was approved as a
Warehouse (MCU16/0087).
2.2. Site Description
The site is 1,648.99m2 in area and is generally flat. The site enjoys direct access from Venture Drive
and is provided with 15 car spaces on a concrete hardstand area at the front of the building.
2.3. Surrounding Land Uses
The site is surrounded predominantly by industrial uses within the Industry Zone. The surrounding
area does include a mix of other existing and/or approved uses, such as a Chocolate Factory with
Restaurant, a Brewery with Restaurant (and bar), Gyms and Retail Hardware stores.


3.   ASSESSMENT
3.1. Instruments for Statutory Assessment
Under the Planning Act 2016 the application must be assessed against each of the following
statutory planning instruments to the extent they are relevant to the development:
    State Planning Policy;
    South East Queensland Regional Plan;
    Planning Regulation 2017;
    The Noosa Plan.
3.2. State and Other Statutory Instruments
State Planning Policy
The Noosa Plan is generally consistent with the State Planning Policy July 2017 (SPP) and the SPP
raises no further issues relevant to the proposed development.


                                                                                       Page 21 of 60

Section 22

ORDINARY MEETING AGENDA                                                                   30 APRIL 2020


South East Queensland (SEQ) Regional Plan
The site is located within the Urban Footprint area of the SEQ Regional Plan. The proposal is
consistent with the regional policies of the SEQ Regional Plan.
Planning Regulation 2017
The following assessment benchmark from the Planning Regulation 2017 applies to the application:
     SEQ Development Area
The proposal is for urban activity within the Urban Footprint and is consistent with the assessment
benchmarks contained in the Planning Regulation 2017 for the SEQ Region.
3.3. Statutory Instruments – Planning Scheme
The application must be assessed against the whole of the Noosa Plan to the extent the provisions
are relevant to the development.
The subject site is located in the Noosaville Locality and is zoned Industry. The proposed use is
identified as an inconsistent use within the zone and is required to follow an impact assessable
application process.
Land Use
Council has previously approved a number of gyms and other similar land uses in the Noosaville
Industrial area, including dance and swim schools. Often these types of uses require tenancies found
in industrial areas given the need for large floor plates and the potential for some sport and recreation
uses to adversely impact on neighbouring commercial/retail properties.
The Noosa Plan includes the following overall outcome for the area:
      Noosaville Locality Code
      vv)    For the Industry Zone—land in this zone—
             ii     is protected for industrial functions including Industrial business Type 2 to the
                    exclusion of incompatible uses including Residential Uses, Community Uses,
                    Commercial business and most sport and recreation uses and Retail business
                    uses;
The proposed gym is currently well located in the Noosa Business Centre as part of the Noosa Civic
shopping centre and is proposing to move to the proposed site due to leasing costs, with the
industrial area offering cheaper leasing arrangements. This is the only reason given by the applicant
for the proposed relocation and it is therefore difficult to reconcile that there is any real planning need
for this gym to operate in the industrial area that warrants approving an inconsistent use in the
industrial area.
The table below provides an assessment of the proposed gym against the key development
parameters for the site and identifies the proposal’s compliance with the applicable scheme
requirements.

 Criteria                 Planning Scheme                           Proposal              Complies
 Site Area                Not applicable                            1,648.99m²            -
 Use area                 Not applicable                            705m²                 -
                                                                         2
 Gross floor area         Not applicable                            752m                  -
 Carparking               1 space per 20m2, or part thereof, of     16 car spaces
                          use area; OR 1 space per 3 persons
                          capable of being entertained at any one   2 staff car spaces
                          time, whichever is the greater.
                                                                    4 motorcycle spaces
                          = 36 spaces
                                                                    = 19 spaces           X


                                                                                           Page 22 of 60

Section 23

ORDINARY MEETING AGENDA                                                                  30 APRIL 2020


 Criteria                  Planning Scheme                Proposal                       Complies
 Bicycle Spaces            16 bicycle spaces              15 bicycle spaces (racks)      X
 End of Trip Facilities*
                       1 locker per 2 bicycle spaces 8 locker/s (minimum)                
 *(required only where and;
 5 + spaces are 1 shower cubicle with 2 shower cubicles                                  
 required)             ancillary change room per
                       10 bicycle spaces


Carparking
As demonstrated in the table above, the proposal does not comply with the scheme’s minimum car
parking requirements for a gym.
Based on the proposed total use of the area of the gym of 705m2, the proposed gym requires 36 car
parking spaces to be provided on site. The proposal includes the equivalent of 19 on site car parking
spaces, therefore falling short of the required car parking by 17 spaces.
To support their application, the applicant provided survey data from the existing Noosa Civic
Anytime Fitness gym indicating no more than 20 people enter the gym within any given hour time
slot and therefore arguing the proposed site provides sufficient car parking for the peak demand of
the existing business. Furthermore, the applicant submits that the relatively low population growth of
the Noosa Shire will not generate any further significant demand for the subject gym into the future.
Council’s consulting traffic engineer advises a survey of the existing gym is not a reasonable
indicator of the likely parking demand for the proposed gym as the new gym has a gross floor area
of 752m2 more than double the area of their existing Noosa Civic tenancy of 365m 2. Therefore to
address the proposed gym’s likely parking demand, the applicant was requested to provide parking
surveys from two existing gyms of similar floor area and mode of operation, in order to demonstrate
the proposed on site car parking arrangement is suitable for the likely demand of the proposed gym.
The surveyed gyms were not required to be located in the local area as it is considered the supply
and demand for gyms self regulates in each region. The applicant did not provide any further survey
material to support their proposal.
However, the applicant instead suggested that the total use area of the proposed gym is only
523.5m2, based on individual equipment areas and therefore requires less car parking pursuant to
the planning scheme’s car parking rate for gyms. Additionally, the applicant proposes that Members
are able to book their workout slot online suggesting the maximum number of gym users can be
limited and conditioned accordingly, as follows:
      Utilising Councils traffic consultant’s methodology of 0.8 the maximum number of persons on
      site, being either staff / customers would be 26.5 persons, refer table below.
       Qty of Spaces           Proposed                              Qty of Patrons
       Car park                17 spaces                             17 / 0.8 = 21.25 persons
       Motorcycle / Scooter    4 spaces (1 equivalent car space)     4 x spaces = 4 persons
       PWD                     1 space                               1 / 0.8 = 1.25 persons
       Total                   18 car spaces / 4 scooter spaces      26.5 persons
       On Street               2 spaces                              2 / 0.8 = 2.5 persons
       Total                   20car spaces / 4 scooter spaces       29 persons
       *Note- it is reasonable that rather than the scooter spaces being combined and 4 scooter
       spaces being counted as 1 car space that each scooter space is allocated as a person able
       to attend the gym. Previous modal studies of existing gyms has provided evidence that the
       number of persons utilising scooter / motorcycle is 11% of all patronage.

                                                                                             Page 23 of 60

Section 24

ORDINARY MEETING AGENDA                                                                 30 APRIL 2020


      Further consideration may also be given to the availability of alternative parking specifically for
      this site and its staff and or patrons.
      This application is for the entire site at 24 Venture Drive, there are no other tenancies that are
      operating, or parking spaces shared with other uses. It is reasonable to expect that the
      availability directly in front of 24 Venture Drive of 2 on street parking spaces could be
      accredited in car parking allocation for this proposed use.
      We would ask council to consider this and grant a maximum population of patrons / staff on
      site of 29 persons.
      All existing gym members in other gyms currently require using a swipe card, swipe tag etc to
      gain access to their gym when working out. This allows management to understand when and
      who is working out in the gym. It is also used to correlate with CCTV that is installed at the
      entrance so that sign in, correlates with a video image, again for added safety and security.
      To ensure that maximum attendance numbers are capped to meet car parking requirements,
      the current system in allowing entry would be modified by readily available systems that exist
      which require the following procedure:
      a.    Booking on line through an APP you gym session time for the week – 1 hour slots
      b.    When each booking is made you are issued with a QR Code for that session that you
            scan and allows you entry into the gym. Access to the gym cannot occur without scanning
            a QR Code.
      c.    CCTV is still in place that ensures that only one person enters with each code scanned.
      d.    Onsite management will also be in place from 7am – 10am and 3.00pm – 6.30pm to also
            ensure that maximum numbers are not exceeded by possible persons following in
            another member.
      e.    The system is simple to use and is one that a range of proprietary applications exist that
            require       minor       modification        to       suit       this        application.
            https://www.trybooking.com/info/trybooking-scanning-app
      This type of app and system is similar to what hotels currently use in allowing guests access
      to their rooms or areas of the property, it can be specific in time and areas of access. Its
      adaptation to using for the fitness industry is not complicated and can be achieved with minimal
      coding and software installation.
It is generally preferred and intended for traditional 24 hour open access gyms to be located within
business centres with shared car parking arrangements. Considering the presence of a mix of uses
and consequent varied peak parking demand times, centres typically provide suitable overflow car
parking for gyms and other uses to co-locate. Furthermore, centres have direct access to public
transport and other supporting services.
The applicant’s proposed calculation of total use area is not consistent with the planning scheme’s
definition with walkway areas between individual equipment areas also required to be included for
the purpose of calculating total use area. Further, the applicant’s calculation of the maximum number
of gym patrons permissible utilising Council’s traffic consulting engineer’s rate of 0.8 parking space
per member also relies on 2 street car parking spaces. This is not supported as these parking spaces
should be maintained for any overflow parking, given Council’s traffic consulting engineer’s rate is
based on an average demand for parking, assumes some patrons will travel together and does not
address potential overlap of patrons.
The proposed booking system is also not currently utilised by the gym at its existing location in Noosa
Business Centre, there are no known gyms that operate in this manner and concern is raised that it
may not be able to be suitably implemented and may be difficult to enforce.




                                                                                         Page 24 of 60

Section 25

ORDINARY MEETING AGENDA                                                               30 APRIL 2020


Bicycle Parking and End of trip facilities
Probable Solution S31.2 of the Business Uses Code requires 16 bicycle parking spaces to be
provided on site. The proposal includes 15 bicycle parking spaces at the front of the building, 2
shower cubicles and a minimum of 8 lockers.
Given the proposal seeks to limit the number of patrons and staff on site at any one time, it is
considered reasonable to reduce the required number of bicycle parking spaces from 16 down to a
minimum of 5. This is considered appropriate for the number of patrons or staff likely to travel to the
site by bicycle and in relation to the number of patrons or staff that are not provided with an on site
vehicle space, as follows:
Max. 27 patrons/staff – 22 spaces on site (18 car + 4 motorcycle/motor scooter)
= 5 bicycle parking spaces
4.    DRAFT PLANNING SCHEME
With regards to the draft planning scheme, the subject site is identified within the Venture Drive
Enterprise Precinct. The proposed Indoor sport and recreation use is identified as a consistent use
within the Venture Drive Enterprise Precinct and would require code assessment against the
planning scheme.
The intent of the Venture Drive Enterprise Precinct is to provide for development that may include
some Theatre uses (filmmaking studio or music recording studio) and Sport and Recreation uses
where adverse off-site impacts are avoided and the use is compatible with surrounding industry uses
and does not compromise the ongoing operation and viability of industry activities nearby and with
the medium impact industry zone.
The Driveways and Parking Code specifies minimum parking of one space per 20m 2 gross floor
area, consistent with the current planning scheme’s car parking rate.
5.    CONSULTATION
5.1. Other Referrals
The application was forwarded to the following internal Council officers:
     Development Engineer, Development Assessment
The application was forwarded to the following external consultants:
     Traffic Engineer
5.2. Public Notification
The application was publicly notified for 15 business days in accordance with the Planning Act 2016.
No properly made submissions were received.
6.    CONCLUSION & REASONS FOR DECISION
The proposed gym is contrary to the Noosa Plan outcomes sought for the Noosaville industrial area,
and the applicant has not demonstrated any planning grounds for the gym to locate in the industrial
area, given they are currently well located in the Noosa Business Centre. The applicant is proposing
to relocate to the industrial area due to cheaper leasing arrangements which the Planning Act 2016
specifically excludes as being a relevant matter for the assessment of impact assessable
applications.
Notwithstanding this, Council has issued a number of development approvals for gyms and the like
in the Noosaville industrial area under the current planning scheme and has specifically identified
this part of the industrial area under the draft planning scheme as being suitable for a range of
commercial uses, including gyms.




                                                                                       Page 25 of 60

Section 26

ORDINARY MEETING AGENDA                                                                 30 APRIL 2020


While the proposed car parking for the gym falls well short of the required car parking under the
planning scheme (17 spaces), the applicant has demonstrated that if a booking system is put in
place and the number of members is limited to no more than 27 patrons on site at any one time, the
proposed on site car parking is likely to be satisfactory. It is though recommended in this regard that
the approval be limited to a maximum of 2 years to allow the proposed arrangements to be monitored
over time to ensure this is a workable solution. At the end of this time, where no parking impacts
arise, the applicant may seek this time limit be removed or extended.
It is therefore recommended the application be approved subject to reasonable and relevant
conditions.
Departments/Sections Consulted:
      Chief Executive Officer         Community Services                      Corporate Services
      Executive Officer               Community Development                   Financial Services
      Executive Support               Community Facilities                    ICT
                                      Libraries & Galleries                   Procurement & Fleet
                                      Local Laws                              Property
                                      Waste & Environmental Health            Revenue Services

      Executive Services          x   Environment & Sustainable Development   Infrastructure Services
      Community Engagement            Building & Plumbing Services            Asset Management
      Customer Service            x   Development Assessment                  Buildings and Facilities
      Governance                      Economic Development                    Civil Operations
      People and Culture              Environmental Services                  Disaster Management
                                      Strategic Land Use Planning             Infrastructure        Planning,
                                                                              Design and Delivery




                                                                                          Page 26 of 60

Section 27

ATTACHMENT 1




 Page 27 of 60

09 30 12 abe
                                SHV    910g         uoyduoseq       onss|                       cout                                                          wee ec uceler
 a |     ws                  fqumerg | toz/ow/se     vavaav>          v | LD _I                     eve aivas                                                    las            yp
anss|  asbud                    cuy | $toe/otoe      aay aus          a                                                                                 sror io suneoon Tstov LN ¥ s
                                     0202/20/97      € UOISIASY       2                                                                                          v99lreys Lol 2
                                  |                                                                                                                         Olanis NoIs3q 1s3z_ | ee 4
LO L                  1S06 L                                                                                                                                aeons
        i  V                                                                                 NV'Id Lis              SSANLId IWWANV                      1 S1NjUaA HZ
 JOQUINN Jeeus           JOQUAN Joe[olg                                                            elt, Buymoiq                 OWDN Juel|D                   sselppy Joelolg

                                  00z7: 1 sIbIs
                          NV1 d      ALIS                                                           oszz |! cove | oo9e | 092 | 009% | 009% | o09% | 009% | cove sen
                                                                                                                          Asepunog Ayedoig              we    ners
                                  Rp                                                           8 5               A                                          EN
                                     Peet       ——t—“i‘“‘; O*;~*~*~*™                              FP RO a ee  A ee       eR ee Be    Ne     NO    eR eh een as
                                  See Ss | —- SLHOIEM SSNS                                        ASA o VSOPYSS OPIS OPS POPS ST                        ant 4 ‘0.
                                  BA                                                                                                                 BP e, 2O
                                  RAMs                                                                                                                 VN Zn ee
                                  OS |                                            aS              |                                        .           A"    ae             g
                                   eae  oe                                               es                                 }                        Se
                    >             eohs                                    — 7                     |                                                   aT
                                   z   Pip                                               |                                                            Ay yg!
                                  - aS ees                                           |  =| | eouequa      ;                '                         : Wag ae
                                  oy  wes             wauy dn                        | BH   ison |                                                       AS .o
                                  ee              WHWM ONIHDLAYLS                      3                                                              Oc
                    yA            Na ae                                              |  ar] mune  |                           on,                     Oa a
                                  oe He                                              | >| | sequen |                                                  CS Sane             o
                                   a tay SS      EEE                               eee                                                                     ja             3
                                  DS  |                                                                                                                 Co FRIOF
                                  WS) = CO                                         —_—_——
                                  a                =                               =            =                          ———
                                5 Bima |            |                              =      S     =
                                2 Sew   all        =                               =_=    +     &                                                     ed
                                3 See              =                               S14    a     =                                                                           -
        %  SWY¥d Y3L0008 TWLOL g 4 (OR ca           =                              =      35    =|                   :              5	1	1	1	35	15	3171	1515	18	50	28	8
5	1	1	1	35	16	3210	1522	19	49	38	8
4	1	1	1	36	0	237	1546	1636	41	-1	
5	1	1	1	36	1	237	1558	19	16	65	8h
5	1	1	1	36	2	380	1546	102	41	0	S¥uVdYVO
5	1	1	1	36	3	481	1546	70	41	30	TVLOL
5	1	1	1	36	4	681	1551	16	34	30	2
5	1	1	1	36	5	720	1550	62	34	34	Bie
5	1	1	1	36	6	806	1562	46	23	28	5)
5	1	1	1	36	7	1054	1564	18	18	23	|
5	1	1	1	36	8	1603	1559	38	23	68	=
5	1	1	1	36	9	1725	1570	26	16	61	=
5	1	1	1	36	10	1838	1558	35	24	74	=
4	1	1	1	37	0	689	1619	1181	26	-1	
5	1	1	1	37	1	689	1619	60	24	30	matey
5	1	1	1	37	2	785	1628	33	17	0	|\:
5	1	1	1	37	3	869	1631	36	12	8	ane
5	1	1	1	37	4	1056	1631	16	13	46	|
5	1	1	1	37	5	1629	1631	12	13	42	|
5	1	1	1	37	6	1725	1631	26	5	53	5
5	1	1	1	37	7	1838	1631	32	13	8	p=
4	1	1	1	38	0	720	1633	1153	51	-1	
5	1	1	1	38	1	720	1642	35	38	45	Rh
5	1	1	1	38	2	787	1633	26	51	0	My
5	1	1	1	38	3	818	1633	24	50	16	By
5	1	1	1	38	4	868	1648	37	1	69	—
5	1	1	1	38	5	1035	1648	24	18	53	oa
5	1	1	1	38	6	1626	1648	15	18	46	|
5	1	1	1	38	7	1733	1634	8	30	51	uv
5	1	1	1	38	8	1838	1648	35	18	65	=
4	1	1	1	39	0	176	1655	2263	42	-1	
5	1	1	1	39	1	176	1656	81	41	0	auiy'9sz
5	1	1	1	39	2	353	1656	62	41	28	vauv
5	1	1	1	39	3	422	1656	123	41	33	G3dVOSONYT
5	1	1	1	39	4	719	1666	37	28	27	ee,
5	1	1	1	39	5	797	1671	52	23	7	eel
5	1	1	1	39	6	870	1675	36	18	28	of
5	1	1	1	39	7	1595	1655	22	42	41	i
5	1	1	1	39	8	1623	1669	18	24	48	|
5	1	1	1	39	9	1725	1658	26	39	94	=
5	1	1	1	39	10	1838	1669	35	24	77	=
5	1	1	1	39	11	2330	1660	109	25	28	1
4	1	1	1	40	0	720	1690	2469	56	-1	
5	1	1	1	40	1	720	1690	95	36	39	es
5	1	1	1	40	2	920	1686	25	49	14	<<
5	1	1	1	40	3	954	1697	118	32	0	[_=o
5	1	1	1	40	4	1603	1697	38	25	77	=
5	1	1	1	40	5	1725	1699	26	17	52	z
5	1	1	1	40	6	1838	1697	32	24	82	=
5	1	1	1	40	7	2906	1708	55	17	47	Vn
5	1	1	1	40	8	3171	1697	18	49	79	g
4	1	1	1	41	0	203	1711	2758	49	-1	
5	1	1	1	41	1	203	1725	43	17	42	ays
5	1	1	1	41	2	305	1713	59	41	7	Vauv
5	1	1	1	41	3	370	1713	66	41	29	LYNOO
5	1	1	1	41	4	435	1713	45	41	82	NON
5	1	1	1	41	5	489	1725	62	17	71	WLOL
5	1	1	1	41	6	719	1711	34	49	12	Se
5	1	1	1	41	7	871	1726	34	1	35	|
5	1	1	1	41	8	907	1710	24	46	18	—-
5	1	1	1	41	9	972	1732	8	17	24	=
5	1	1	1	41	10	1035	1726	37	17	88	|
5	1	1	1	41	11	1603	1726	38	17	57	=|
5	1	1	1	41	12	1725	1719	26	17	43	=
5	1	1	1	41	13	1838	1726	20	1	43	|
5	1	1	1	41	14	1872	1725	2	2	59	|
5	1	1	1	41	15	2909	1724	13	17	6	moh
4	1	1	1	42	0	720	1735	2242	45	-1	
5	1	1	1	42	1	720	1749	352	30	34	So
5	1	1	1	42	2	1603	1753	38	24	0	a
5	1	1	1	42	3	1838	1753	35	24	91	=
5	1	1	1	42	4	2894	1735	68	45	37	ed
4	1	1	1	43	0	187	1763	2777	52	-1	
5	1	1	1	43	1	187	1781	37	16	0	2g’
5	1	1	1	43	2	224	1770	32	38	0	6S}
5	1	1	1	43	3	378	1770	50	38	5	V3uV
5	1	1	1	43	4	430	1770	120	38	7	NOLLISNVEL
5	1	1	1	43	5	719	1773	68	29	57	BAS
5	1	1	1	43	6	823	1773	18	33	13	Sasi
5	1	1	1	43	7	955	1777	25	38	92	=
5	1	1	1	43	8	1035	1781	37	18	43	—
5	1	1	1	43	9	1603	1781	38	24	91	=
5	1	1	1	43	10	1825	1781	21	24	0	:
5	1	1	1	43	11	2329	1763	110	38	10	SD
5	1	1	1	43	12	2893	1772	71	35	44	ges
4	1	1	1	44	0	199	1781	2762	59	-1	
5	1	1	1	44	1	199	1797	48	42	0	augy
5	1	1	1	44	2	406	1797	84	42	44	SLHOISM
5	1	1	1	44	3	500	1797	50	42	0	334
5	1	1	1	44	4	720	1801	64	34	27	Siz
5	1	1	1	44	5	823	1781	26	59	34	Ki
5	1	1	1	44	6	868	1808	37	24	30	SSS
5	1	1	1	44	7	997	1798	39	42	33	SS
5	1	1	1	44	8	1231	1798	53	42	26	ee
5	1	1	1	44	9	2893	1805	68	29	35	DN
4	1	1	1	45	0	176	1823	2788	45	-1	
5	1	1	1	45	1	176	1823	42	42	45	aus
5	1	1	1	45	2	221	1836	35	17	35	ee)
5	1	1	1	45	3	362	1823	53	42	13	VauV
5	1	1	1	45	4	422	1823	126	42	2	ONIHOLSULS
5	1	1	1	45	5	719	1833	129	35	4	Sees
5	1	1	1	45	6	1065	1822	13	50	26	|.
5	1	1	1	45	7	1828	1837	45	24	85	=
5	1	1	1	45	8	2893	1833	30	26	8	ee
4	1	1	1	46	0	196	1848	2768	78	-1	
5	1	1	1	46	1	196	1856	51	36	0	2ugr
5	1	1	1	46	2	359	1863	112	18	0	ANAWdINDA
5	1	1	1	46	3	478	1865	72	16	0	O1GYVO
5	1	1	1	46	4	719	1848	131	78	4	ao
5	1	1	1	46	5	869	1869	36	19	4	_
5	1	1	1	46	6	1039	1881	28	7	87	=
5	1	1	1	46	7	1538	1863	35	25	84	=|
5	1	1	1	46	8	1844	1886	29	2	78	=
5	1	1	1	46	9	2879	1867	44	27	37	Nee
5	1	1	1	46	10	2942	1866	22	46	37	f
4	1	1	1	47	0	192	1880	2763	41	-1	
5	1	1	1	47	1	192	1880	64	41	0	auyel
5	1	1	1	47	2	403	1880	96	41	69	S3NIHOWW
5	1	1	1	47	3	508	1893	42	16	58	WAS
5	1	1	1	47	4	720	1889	69	27	17	ier
5	1	1	1	47	5	837	1889	16	28	8	ar
5	1	1	1	47	6	852	1880	25	41	11	ll
5	1	1	1	47	7	893	1892	12	18	54	|
5	1	1	1	47	8	1035	1892	36	18	59	=
5	1	1	1	47	9	1538	1892	35	19	65	=
5	1	1	1	47	10	1856	1892	17	18	20	I
5	1	1	1	47	11	2825	1882	39	41	23	hg
5	1	1	1	47	12	2897	1893	58	21	33	ee
4	1	1	1	48	0	197	1898	3031	54	-1	
5	1	1	1	48	1	197	1904	47	40	50	abs
5	1	1	1	48	2	431	1906	63	40	26	yOVUL
5	1	1	1	48	3	501	1920	49	16	20	G31S
5	1	1	1	48	4	720	1899	74	45	19	as
5	1	1	1	48	5	803	1911	40	33	34	ox
5	1	1	1	48	6	846	1907	32	41	53	||
5	1	1	1	48	7	1035	1916	33	24	43	—
5	1	1	1	48	8	1537	1916	36	24	88	=
5	1	1	1	48	9	1837	1916	35	24	64	=
5	1	1	1	48	10	2800	1925	3	2	0	:
5	1	1	1	48	11	2841	1898	85	54	39	Oe
5	1	1	1	48	12	3210	1935	18	11	0	z
4	1	1	1	49	0	192	1930	3037	62	-1	
5	1	1	1	49	1	192	1934	54	42	0	aubL
5	1	1	1	49	2	437	1933	40	42	62	‘Ld
5	1	1	1	49	3	493	1948	57	17	15	SOO
5	1	1	1	49	4	718	1933	33	44	28	eae
5	1	1	1	49	5	760	1930	79	56	18	wor
5	1	1	1	49	6	868	1951	37	25	87	=
5	1	1	1	49	7	1059	1951	12	25	8	|
5	1	1	1	49	8	1537	1949	36	27	83	=|
5	1	1	1	49	9	1837	1951	36	25	92	=
5	1	1	1	49	10	2809	1948	6	23	0	:
5	1	1	1	49	11	2826	1952	26	35	34	Me
5	1	1	1	49	12	2855	1952	31	40	21	A
5	1	1	1	49	13	2936	1945	25	34	24	A
5	1	1	1	49	14	3210	1948	19	37	65	g
4	1	1	1	50	0	193	1971	2771	44	-1	
5	1	1	1	50	1	193	1972	54	31	24	2W0r
5	1	1	1	50	2	439	1977	32	16	26	91M
5	1	1	1	50	3	477	1977	73	16	22	ONIXOG
5	1	1	1	50	4	720	1975	72	27	20	ae
5	1	1	1	50	5	799	1977	20	21	34	Ks
5	1	1	1	50	6	869	1971	40	31	1	ys
5	1	1	1	50	7	1035	1971	40	31	24	Pt
5	1	1	1	50	8	1566	1980	7	18	19	|
5	1	1	1	50	9	1837	1980	36	19	91	=
5	1	1	1	50	10	2035	1985	2	2	47	:
5	1	1	1	50	11	2871	1982	14	14	58	Z|
5	1	1	1	50	12	2890	1983	19	21	19	K
5	1	1	1	50	13	2936	1977	28	38	24	my
4	1	1	1	51	0	456	1979	2508	73	-1	
5	1	1	1	51	1	456	2004	37	16	0	S30
5	1	1	1	51	2	508	1990	42	42	32	10NI
5	1	1	1	51	3	751	1988	64	64	20	ee
5	1	1	1	51	4	827	1979	22	57	15	cS
5	1	1	1	51	5	862	2003	43	45	49	|
5	1	1	1	51	6	1041	2003	22	1	42	=
5	1	1	1	51	7	1538	2003	35	7	33	=
5	1	1	1	51	8	1847	2003	23	1	94	=
5	1	1	1	51	9	2119	2005	2	2	44	:
5	1	1	1	51	10	2808	1993	46	37	27	OF
5	1	1	1	51	11	2872	1986	31	51	27	a
5	1	1	1	51	12	2902	1982	30	59	16	S
5	1	1	1	51	13	2947	2006	17	24	43	A
4	1	1	1	52	0	735	2022	2165	32	-1	
5	1	1	1	52	1	735	2033	18	13	9	oS
5	1	1	1	52	2	837	2027	68	18	40	et
5	1	1	1	52	3	1031	2023	16	31	0	;
5	1	1	1	52	4	1059	2035	12	13	69	|
5	1	1	1	52	5	1538	2030	35	18	46	=
5	1	1	1	52	6	1838	2022	39	31	31	=|
5	1	1	1	52	7	2809	2030	91	20	25	Qn)
5	1	1	1	52	8	2927	2027	17	23	36	Oe
4	1	1	1	53	0	183	2028	2727	60	-1	
5	1	1	1	53	1	183	2035	74	46	0	augee7
5	1	1	1	53	2	444	2060	107	17	0	yacrrO
5	1	1	1	53	3	719	2038	8	42	0	b
5	1	1	1	53	4	740	2028	67	52	24	al
5	1	1	1	53	5	822	2036	28	39	5	cial
5	1	1	1	53	6	1035	2052	33	24	25	—
5	1	1	1	53	7	1291	2042	48	25	1	Sled
5	1	1	1	53	8	1348	2042	142	25	1	liassOdd
5	1	1	1	53	9	1511	2038	42	42	90	|
5	1	1	1	53	10	1560	2052	13	24	41	|
5	1	1	1	53	11	1639	2042	47	25	0	SIM
5	1	1	1	53	12	1698	2042	108	25	0	ODNIXOG
5	1	1	1	53	13	1838	2052	5	7	79	|
5	1	1	1	53	14	1837	2052	37	24	84	|
5	1	1	1	53	15	2059	2052	233	27	0	Vaprynal\inaynd\)
5	1	1	1	53	16	2293	2037	61	55	0	afin
5	1	1	1	53	17	2366	2052	13	23	0	dl)
5	1	1	1	53	18	2398	2053	17	26	0	a
5	1	1	1	53	19	2426	2052	99	24	0	pied\ong
5	1	1	1	53	20	2533	2052	68	27	0	al/a.a
5	1	1	1	53	21	2637	2057	26	22	70	in
5	1	1	1	53	22	2704	2052	81	33	0	alan
5	1	1	1	53	23	2756	2037	33	55	54	iy
5	1	1	1	53	24	2809	2036	101	51	27	We
4	1	1	1	54	0	191	2069	3037	79	-1	
5	1	1	1	54	1	191	2078	305	50	15	pene
5	1	1	1	54	2	719	2077	88	49	29	a
5	1	1	1	54	3	815	2073	43	72	0	E
5	1	1	1	54	4	904	2073	122	66	3	——
5	1	1	1	54	5	1947	2069	95	79	33	mee
5	1	1	1	54	6	2161	2071	317	38	4	ee
5	1	1	1	54	7	2506	2077	23	30	36	a
5	1	1	1	54	8	2574	2066	31	59	20	ne
5	1	1	1	54	9	2648	2079	79	28	31	ee
5	1	1	1	54	10	2739	2078	185	42	14	eae
5	1	1	1	54	11	3210	2086	18	50	69	3
4	1	1	1	55	0	787	2109	2177	18	-1	
5	1	1	1	55	1	1933	2115	5	7	0	.
5	1	1	1	55	2	1984	2119	5	3	14	Z
5	1	1	1	55	3	2075	2115	21	7	12	ae
5	1	1	1	55	4	2223	2115	41	8	19	nega
5	1	1	1	55	5	2291	2117	20	7	26	tele
5	1	1	1	55	6	2399	2115	68	8	19	Paes
5	1	1	1	55	7	2523	2115	71	12	2	Been
5	1	1	1	55	8	2634	2119	37	5	12	Sa
5	1	1	1	55	9	2692	2117	19	6	16	Ste
5	1	1	1	55	10	2740	2114	87	13	19	Ob
5	1	1	1	55	11	2828	2098	11	33	0	e
5	1	1	1	55	12	2847	2110	43	13	0	ee
5	1	1	1	55	13	2956	2112	8	8	49	#
4	1	1	1	56	0	184	2095	2736	60	-1	
5	1	1	1	56	1	184	2112	72	37	0	2ll0S9}
5	1	1	1	56	2	450	2116	52	16	0	Wau
5	1	1	1	56	3	508	2116	42	16	42	SIs
5	1	1	1	56	4	639	2112	18	36	41	aw
5	1	1	1	56	5	720	2127	29	20	29	Pie
5	1	1	1	56	6	759	2125	7	15	35	h
5	1	1	1	56	7	767	2116	80	32	21	Ze,
5	1	1	1	56	8	1884	2095	39	56	51	x
5	1	1	1	56	9	2070	2106	33	49	7	Bp
5	1	1	1	56	10	2102	2113	116	38	26	Ne
5	1	1	1	56	11	2234	2127	40	17	18	Rg
5	1	1	1	56	12	2290	2113	13	31	23	PN
5	1	1	1	56	13	2360	2106	21	49	27	ge
5	1	1	1	56	14	2380	2113	128	38	26	RN
5	1	1	1	56	15	2507	2113	111	38	34	cg
5	1	1	1	56	16	2618	2127	35	17	24	ON
5	1	1	1	56	17	2723	2113	58	38	33	a
5	1	1	1	56	18	2795	2110	125	37	34	GO
4	1	1	1	57	0	2310	2156	157	20	-1	
5	1	1	1	57	1	2310	2152	78	28	0	Avepunog
5	1	1	1	57	2	2387	2152	80	28	41	Ayadoig
4	1	1	1	58	0	3017	2184	168	19	-1	
5	1	1	1	58	1	3013	2180	42	31	0	ug,
5	1	1	1	58	2	3059	2180	32	31	26	Pave
5	1	1	1	58	3	3093	2184	92	19	32	padeospue]
4	1	1	1	59	0	849	2180	2100	61	-1	
5	1	1	1	59	1	849	2180	29	49	26	Ff
5	1	1	1	59	2	1335	2200	62	41	20	oseez
5	1	1	1	59	3	1933	2200	63	41	68	oosy
5	1	1	1	59	4	2092	2211	50	18	81	009%
5	1	1	1	59	5	2152	2200	29	41	3	“
5	1	1	1	59	6	2198	2211	49	18	91	009%
5	1	1	1	59	7	2262	2200	21	41	0	~
5	1	1	1	59	8	2303	2211	49	18	86	009%
5	1	1	1	59	9	2361	2200	28	41	34	“
5	1	1	1	59	10	2408	2211	50	18	91	009%
5	1	1	1	59	11	2467	2200	28	41	40	~
5	1	1	1	59	12	2514	2211	50	18	88	009%
5	1	1	1	59	13	2573	2200	28	41	13	“
5	1	1	1	59	14	2620	2211	49	18	75	009%
5	1	1	1	59	15	2679	2200	28	41	49	“
5	1	1	1	59	16	2727	2211	50	18	67	OOLZ
5	1	1	1	59	17	2785	2200	28	41	45	~
5	1	1	1	59	18	2824	2211	50	18	74	0602
5	1	1	1	59	19	2880	2200	15	41	0	“
5	1	1	1	59	20	2902	2211	47	18	46	O9LI
4	1	1	1	60	0	769	2327	41	17	-1	
5	1	1	1	60	1	769	2327	41	17	86	sose

Section 28

ORDINARY MEETING AGENDA                                                                   30 APRIL 2020



3    MCU19/0066 - MATERIAL CHANGE OF USE – COMMERCIAL BUSINESS - TYPE 1
     OFFICE AT 2197 DAVID LOW WAY, PEREGIAN BEACH

Author             Coordinator Planning, Patrick Murphy
                   Environment and Sustainable Development Department

Index              ECM/ Application/ MCU19/0066

Attachments        1.   Proposal Plans



APPLICATION DETAILS

Applicant                      Sabine Freitag

Proposal                       Material Change of Use - Commercial Business - Type 1 Office

Properly Made Date             20 June 2019

Information Request Date       18 July 2019

Information Response Date      16 October 2019

Decision Due Date              10 March 2020

Number of Submissions          39 properly made objections



PROPERTY DETAILS

Property Address               2197 David Low Way Peregian Beach

RP Description                 Lot 625 P 93121

Land Area                      501m²

Existing Use of Land           Nursery and Dwelling



STATUTORY DETAILS

SEQRP Designation              Urban Footprint

Locality                       Eastern Beaches

Zone                           Detached Housing

Overlays                       Natural Hazard Overlay – Bushfire and Acid Sulfate Soils

Assessment Type                Impact




                                                                                          Page 28 of 60

Section 29

ORDINARY MEETING AGENDA                                                              30 APRIL 2020


RECOMMENDATION
That Council note the report by the Coordinator Planning to the Ordinary Meeting dated 30 April
2020 regarding Application No. MCU19/0066 for a Development Permit for Material Change of Use
- Commercial Business - Type 1 Office situated at 2197 David Low Way, Peregian Beach and:
A.   Approve the application in accordance with the following conditions:
     PLANNING
           When Conditions must be Complied With
     1.    Unless otherwise stated, all conditions of this Decision Notice must be complied with
           prior to the use commencing, and then compliance maintained at all times while the use
           continues.
           Approved Plans
     2.    Development undertaken in accordance with this approval must generally comply with
           the approved plans of development. The approved plans are listed in the following table
           unless otherwise amended by these conditions.

            Plan No.        Rev.   Plan/Document Name                            Date

            SK0 1.2         A      Site Plan prepared by pent Archi              10/10/2019

            SK0 1.3         A      Floor Plan prepared by pent Archi             10/10/2019

           Nature and Extent of Approved Use
     3.    The approval allows for 32m2 of Office for the purpose of a real estate agency.
     4.    The Office (real estate) may operate 8.00am to 6.00pm, Monday to Saturday.
     5.    A maximum of 2 staff are permitted on site at any one time.
     6.    The real estate agency must be limited to sales only, no rental listings are permitted.
           Car Parking
     7.    A minimum of 2 car parking spaces must be provided on the site in the area noted as
           Staff car parking on the approved plans.
     8.    All staff must be directed to park within the approved staff car parking area as shown on
           the approved plans.
     9.    The staff car parking must be made available and accessible to staff at all times while
           the use is operating.
     10.   All car parking areas and access driveways must be maintained exclusively for vehicle
           parking and manoeuvring and kept in a tidy and safe condition at all times.
           Advertising Devices
     11.   Any advertising sign or device must comply with Council's policies on advertising.
B.   Find the following matters relevant to the assessment and sufficient reason to approve the
     application:
     1.    The site has not been used for residential purposes for a significant period of time as it
           obtained a building approval for a Kiosk in 1969 and planning approval for a Nursery in
           1972.
     2.    The proposal will not result in additional commercial use area as it utilises part of an
           existing building associated with an existing lawful commercial use.
     3.    The proposed use will not result in any significant new or additional impacts on the
           surrounding residential amenity.
C.   Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.


                                                                                        Page 29 of 60

Section 30

ORDINARY MEETING AGENDA                                                                    30 APRIL 2020


REPORT
1.    PROPOSAL
The application proposes to use part of an existing building at 2197 David Low Way for the purpose
of a real estate office.
It is proposed to use 32m2 for office with the remaining area to be utilised by a gift shop/coffee kiosk,
storage and toilet.
The applicant advises that there will be a maximum of 2 staff and the agency will only provide for
sales with no rental listings. As such, it is anticipated that there will be limited attendance of the office
by clients as the majority of client interaction is undertaken within people’s homes.
The applicant has proposed that a structure to the rear of the site be utilised for staff car parking.
The structure is currently used for parking 1 vehicle with the remaining area used to store goods.
The applicant proposes to re-locate the good and use the structure used to accommodate 2 staff
vehicles.
The existing building is situated on the western half of the lot and is approximately 77m 2. The
following images detail site and floor plans and locality plans.




                                            Figure 1: Subject site




                                                                                             Page 30 of 60

Section 31

ORDINARY MEETING AGENDA                             30 APRIL 2020




                           Figure 2: Floor Plan




                          Figure 3: Locality Plan




                                                    Page 31 of 60

ORDINARY MEETING AGENDA                                                           30 APRIL 2020

       |
       |                                                |
       !                           La                |
       |                    .                      .
       |                                A
                       XA            O\ ue     ee N     |          [ Kitchen   | Scam |
       |           ;     KO              ACOA           \;        Fit ——————*idtsSsan
       |           eA                             OS ~
       '                    \    o  r     ‘Kiosk        |
       |                     or                  VY     '
        |            j=\y             or
                          amt     .  JZ                 '
       9                         AS                     |
                  “            >»                       :
        \                                               |
         \                             2197 David Low Way
          \                            Lot 625 P 93121  '
           N                                            |
            \,                                          |
              \                                         '
               \                                        |
                                                        |
                     —                                  t
                       a
                                        Figure 2: Floor Plan

                                          o    rr         FR ge ,
                                          Hee Ata
                                        ea, ane a                 helen
                                       Part pit ky
                                        ue    —   oR Bes eote: wee
                                      eas a % bh       bt? jion!   bi   ue
                                     A a     a     4a     pte
                                       nt    a     ts Sed       se ot
                                     Sear                 EE Nae)
                                     OS                          Bie
                                     jp       =  Patel gk PSL
                                     hy Pies) >  tee              OL!
                                 pa eee
                                  Sn      PS    eel 9       donk     ols   2
                                 ‘ Fis Vee             pa i 4
                                 Boe Xj BCreenera      hed |   fay         os
                                 A   ae Beg: qOK Street         a
                                  an     4 eo)    By a) IR                 ;
                                   Oe          Or                          ee
                                       Figure 3: Locality Plan

                                                                                   Page 31 of 60

Section 32

ORDINARY MEETING AGENDA                                                              30 APRIL 2020




                                          Figure 4: Locality Plan

2.   SITE DETAILS
2.1. Background
The site was formerly included within the Shire of Maroochy and in April 1972 approval was issued
over lots 624, 625, 902 and 896 for a nursery. Subsequently detached houses were built on lots 624
and 902. It is unknown if the nursery use operated from these lots prior to the dwelling houses being
built. A copy of the original development approval is not available.
Council records also indicate that an approval was issued for a kiosk in 1969.
The following image details the lots which were subject to the original approval.




                              Figure 5: Lots subject to the original approval



                                                                                      Page 32 of 60

Section 33

ORDINARY MEETING AGENDA                                                                  30 APRIL 2020


On 30 July 2002 the Maroochy Shire Council Team Leader Development Assessment sent a letter
to the property owner advising that the inclusion of an activity that includes the provision of serving
tea, coffee and cake to customers of the garden centre may be considered an ancillary use. It is
noted that under the current planning scheme the nursery would be defined as Retail Business Type
7 – Garden and Lifestyle Centre which would also permit an ancillary coffee shop.
In 2010 Council provided written advice to the property owner that the building in which the proposed
office is located could be used for the purpose of selling nursery related products as this was
considered ancillary to the nursery. An inspection of the site has confirmed that the gift shop is selling
a range of items including plant pots, vases and homewares.
Therefore, the existing coffee kiosk/gift shop are considered to have either existing use rights or are
ancillary to the site’s lawful use as nursery and do not require a further development approval from
Council.
2.2. Site Description
The site is a rectangular shaped lot which is situated on the corner of David Low Way and Jabiru
Street and serviced by access from Jabiru Street. The existing access off Jabiru Street is
approximately 7.5 metres wide and provides access via to 2 separate sets of gates. One of the
gates services a dwelling which is partly situated on the subject site and partly on the adjoining lot
which is in the same ownership as the subject site. Off street angled parking is located to the David
Low frontage and extends beyond the southern boundary of the site. The topography is generally
flat with the site area being approximately 500m2.
With regards to car parking associated with the existing nursery it is noted that 10 existing car parking
spaces are situated within the road reserve adjacent to the frontage of the 3 lots known as 2197
David Low Way and currently in the same ownership. It is unclear as to when these spaces were
created.




                           Figure 6: Car parking in the road reserve (highlighted)




                                                                                          Page 33 of 60

Section 34

ORDINARY MEETING AGENDA                                                               30 APRIL 2020


2.3. Surrounding Land Uses
North: Jabiru Street and 2199 – 2201 David Low Way: comprising 15 dwellings units known as
Calypso Sands Holiday Apartments.
South: Also known as 2197 David Low Way: was included in the original planning approval for
the nursery land use. The site is extensively covered with built form which are in part associated with
the nursery use, a dwelling and a shop known as Sheepskin and Opal World.
East: 61 Oriole Avenue: a detached house situated within close proximity of the common boundary
on land with a similar size and topography to the subject site.
West: David Low Way and Noosa National Park
3.    ASSESSMENT
3.1. Instruments for Statutory Assessment
Under the Planning Act 2016 the application must be assessed against each of the following
statutory planning instruments to the extent they are relevant to the development:
     State Planning Policy;
     South East Queensland Regional Plan;
     Planning Regulation 2017;
     The Noosa Plan.
3.2. State and Other Statutory Instruments
State Planning Policy
The Noosa Plan is generally consistent with the State Planning Policy July 2017 (SPP) and the SPP
raises no further issues relevant to the proposed development.
South East Queensland (SEQ) Regional Plan
The site is located within the Urban Footprint area of the SEQ Regional Plan. The proposal is
consistent with the regional policies of the SEQ Regional Plan.
Planning Regulation 2017
The proposal is for an urban activity within the Urban Footprint and is consistent with the assessment
benchmarks contained in the Planning Regulation 2017 for the SEQ Region.
3.3. Statutory Instruments – Planning Scheme
The application must be assessed against the whole of the Noosa Plan to the extent the provisions
are relevant to the development.
Locality Provisions
The subject site is located in the Eastern Beaches Locality and is zoned Detached Housing. The
proposed use is identified as an inconsistent use with the zone and is required to follow an impact
assessable application process. In relation to the proposal, the most relevant overall outcomes state:
      jj)   For Peregian Beach—
      …
            iii.   a wide range of local Retail, Commercial and Entertainment and Dining Uses within
                   the neighbourhood centre serve the immediate needs of residents and visitors of
                   the locality;
      kk)   For the Detached Housing Zone—single detached housing prevails that maintains—
            i. a low impact, low density development form of domestic scale;
            ii. a high level of residential amenity and design quality;
            …….

                                                                                        Page 34 of 60

Section 35

ORDINARY MEETING AGENDA                                                                 30 APRIL 2020


The proposed real estate office conflicts with the above overall outcomes as the proposed
commercial use is not located in the Peregian Beach village and is proposed on land intended to be
developed for detached housing. Despite these conflicts with the Overall Outcomes, an existing
development approval for a nursery is current for the site and the site has been lawfully used for a
commercial purpose for an extended period of time. Furthermore, the proposal does not require the
development of any new buildings or structures as the office is accommodated within an existing
building and replaces a lawfully existing commercial use which was permitted to occur in that part of
the building. The proposed real estate office will also not result in any new or additional impacts to
the approved use of the site for a nursery as the use is limited to sales only with a maximum of 2
staff on site. Furthermore attendance at the site by clients is anticipated to be limited as the majority
of client interaction is proposed to occur in people’s residence.
Land Use & Works Provisions
The application has been assessed against applicable codes. The pertinent issues arising out of the
assessment against the codes are discussed below:
Car parking
The application material submitted with the application advises that there will be a maximum of 2
staff on site, comprising one real estate agent and personal assistant. The applicant asserts the
impact on car parking will be negligible as the majority of clients associated with the real estate
business do not attend the office as meetings with clients are generally held at their residence.
Further discussions with the applicant have also confirmed that rental listings are not included as
part of the operation of the real estate agency and therefore attendance to the site will be limited to
clients associated with property sales only.
The Car Parking and Driveways Code stipulates a rate for an office of 1 car space per 20m 2 with a
minimum of 4 spaces required. Accordingly, the proposed 32m 2 of office space requires 4 car parking
spaces. However, given the nature of the operation it is considered to require 4 car parking spaces
for only 32m2 of use area and 2 staff. It is more appropriate to assess the car parking at a rate of 1
space per 20m2 of use area noting that this is consistent with the car parking rate under the draft
planning scheme for a real estate office. On this basis 1.5 additional spaces are required for the
proposed office. Based on the current planning scheme car parking rate for a nursery of 1 space per
60m2 the proposed 32m2 of office area within this building has credit for 0.5 car spaces. The
submitted plans include a staff car parking area to the rear of the site with sufficient area to
accommodate 2 car spaces. It is recommended that conditions be included relating to the provision
and use of these car spaces to protect the surrounding residential amenity.
4.    DRAFT PLANNING SCHEME
Under the draft Noosa Plan the site is zoned Low Density Residential which is comparable with the
current zoning of the land. As such, the proposed land use remains inconsistent with the strategic
intent for site.
5.    CONSULTATION
5.1. Referral Agencies
The application was not required to be referred to any Referral Agencies.
5.2. Other Referrals
The application was forwarded to the following internal Council officers:
     Development Engineer




                                                                                         Page 35 of 60

Section 36

ORDINARY MEETING AGENDA                                                                               30 APRIL 2020


5.3. Public Notification
The application was publicly notified for 15 business days in accordance with the Planning Act 2016.
39 properly made submissions were received, each objecting to the application 34 of the 39
submissions were made via 3 different pre-formatted templates. 1 objection was made from a
property within close proximity of the site whilst 12 objections were made from an address outside
of the Noosa Shire, 6 of which were outside of Queensland. The following table provides a summary
and assessment of the issues raised by submitters.

 Matters Raised                                             Comments

 Commercial Use:                                            This site has contained commercial operations for an
                                                            extended period of time, since approximately 1969.
 Peregian Beach already has a commercial hub.
                                                            The current proposal does not propose additional
 Commercial element should not be brought into              commercial area as it is utilising an existing area
 this area of Peregian Beach.                               associated with the approved nursery.
 Corporate business such as a real estate agency
 should be located within the business
 precinct/main shopping area or offices on David
 Low Way.

 Car Parking:                                               The proposed use of 32m 2 for the purpose of a small
                                                            real estate office will not result in a significant increase
 The proposal will result in traffic/car parking issues.
                                                            in car parking demand. Notwithstanding, it is
 The lot will be operating a nursery, real estate           recommended that 2 car new parking spaces be
 business, homeware/gift shop and a café with               provided to the rear of the site.
 approximately 3 car spaces allocated.
                                                            It is noted that the existing nose in car parking to the
 The applicant does not have access to 10 car               front of the site is an historical arrangement and
 spaces – only 3 are available to this lot.                 therefore the proposed use will not result in additional
                                                            safety issues.
 Post box and public phone box located to the front
 of the site will place demand on parking spaces in
 this area.
 The proposed 3 staff car parking spaces have and
 will always be used for storage and work area.
 Nose in car parking requires patrons to reverse out
 directly into the road lane which is dangerous for
 traffic flow and cyclists.
 The proposed staff car parking area is never used.
 The applicant proposes that all car spaces in the
 road reserve will provide ample parking – applicant
 is only entitled to 1/3 of car parks in the road
 reserve.
 Applicant’s claim that office will not result in
 additional visitation to the site as most people do
 not visit an office anymore is misleading.

 Signage states that homewares are for sale yet             Whilst gift shop does not form part of this application it
 applicant’s letter states that it is a Gift Shop selling   is noted that the gift shop sells pots, potted plants and
 pots and potted plants.                                    homewares. The sale of homewares material is
                                                            generally included in the retail component of a nursery
                                                            and raises no concern so long as this component
                                                            remains a minor element.

 Application makes false claims about walking to            Submissions relating to the personal conduct of the
 work.                                                      applicant are not valid planning grounds to refuse a
                                                            development application.


                                                                                                       Page 36 of 60

Section 37

ORDINARY MEETING AGENDA                                                                    30 APRIL 2020



 Matters Raised                                      Comments
 Claims about the applicant’s character, personal
 behaviour and unrelated alleged operation of an
 Air BnB sub-let.

 Approval will create a precedent in this area       The site has an existing current approval for a nursery
                                                     and the proposal does not seek to expand the site’s
                                                     existing commercial operations and will not result in
                                                     any new or additional impacts on the amenity of the
                                                     surrounding area.

 Was not aware of the zoning change from             There has been no zoning change.
 residential to business/commercial.

 Building would not fit in with homes in the area,   The proposal does not involve the development of a
 would not like to have to view a brick wall when    new building or brick wall. The submission appears to
 walking out back of property.                       assume that the development relates to lot 897 which
                                                     abuts the common boundary with the submitter’s
                                                     property. It appears that the submitter has incorrectly
                                                     identified the wrong site as being the subject site.

 Previous requests to change the land use on site    There have been no previous development
 have been rejected by Council.                      applications for Material Change of Use for this
                                                     property other than the current approval for the
                                                     nursery.

 Signage on site breaches Council regulations.       The signage has been reviewed by Council’s
                                                     Development Compliance Officer who has confirmed
                                                     that it complies with current requirements.

 Applicant makes false claims about doing no work    Internal works to the building and gates providing
 to the property. New gates providing access from    pedestrian access to the site do not require planning
 David Low Way and paving in road reserve            approval. It is noted that paving has been installed
                                                     between the property boundary and the existing
                                                     footpath.

6.    CONCLUSION & REASONS FOR DECISION
The application proposes a Material Change of Use for Commercial Business Type 1 – Office (real
estate). The office is to be situated on land which lawfully accommodates a nursery use and which
was originally approved in 1972.
The site is zoned Detached Housing therefore the proposed use conflicts with the planning scheme’s
strategic intent for the site. Notwithstanding the site’s current zoning it is reasonable to support the
proposed use as commercial activity has occurred on the site since approximately 1969.
Furthermore the application does not propose the addition of any new buildings as the use will be
accommodated within an existing building on site. The proposed office will be used by a maximum
of 2 staff with limited visitation by clients due to the client meetings generally being conducted at a
client’s residence. The commercial scale of the proposed use is minor and can be accommodated
on site without impacting on the surrounding area.
A number of conditions are recommended to address car parking and the nature and extent of the
office use so that the use will not result in any significant new or additional impacts on the surrounding
residential amenity.
Accordingly, it is recommended that the application be approved subject to conditions.




                                                                                            Page 37 of 60

Section 38

ORDINARY MEETING AGENDA                                                                   30 APRIL 2020


Departments/Sections Consulted:
     Chief Executive Officer          Community Services                      Corporate Services
     Executive Officer                Community Development                   Financial Services
     Executive Support                Community Facilities                    ICT
                                      Libraries & Galleries                   Procurement & Fleet
                                      Local Laws                              Property
                                      Waste & Environmental Health            Revenue Services

     Executive Services           x   Environment & Sustainable Development   Infrastructure Services
     Community Engagement             Building & Plumbing Services            Asset Management
     Customer Service             x   Development Assessment                  Buildings and Facilities
     Governance                       Economic Development                    Civil Operations
     People and Culture               Environmental Services                  Disaster Management
                                      Strategic Land Use Planning             Infrastructure Planning,
                                                                              Design and Delivery




                                                                                           Page 38 of 60

Section 39

ATTACHMENT 1




  Page 39 of 60

3

S         |                                                                                       JABIRU STREET
        3
                il
                  uv
                  S
  uy tt                                                                                 [u    |
                                                                                          gs
  ce 8                                                                                     =
  aed he
  Here                                                                 .                                   >                    ee
  Hell                                                                 o—t
  ely                                                                    At                          q
  j      i                                                          L Z      \                       i
                                                aE         520  AZ              \.                   3
       ty i                                   _, f                \               \
     i fi i                                                        \       WV  ee\\
     Fits                                                            \         e2    \                            ge
 lof iil                                                              \               aN                          g a
    Hil                                      sf           Ee                            —
    Ht                                            en      :                 SM
 : | Ht                                      bay
5	1	1	1	24	5	1316	1114	121	161	1	\S
5	1	1	1	24	6	1501	1191	19	12	34	<
5	1	1	1	24	7	1538	1132	135	90	24	ZY
4	1	1	1	25	0	353	1210	1688	39	-1	
5	1	1	1	25	1	353	1214	11	25	42	i
5	1	1	1	25	2	931	1212	30	37	44	‘SY
5	1	1	1	25	3	1006	1213	2	3	0	Q
5	1	1	1	25	4	1073	1230	12	11	77	Q—
5	1	1	1	25	5	1121	1235	13	3	76	-
5	1	1	1	25	6	1147	1235	26	3	76	—
5	1	1	1	25	7	1205	1235	12	3	76	-
5	1	1	1	25	8	1231	1235	31	3	58	—
5	1	1	1	25	9	1287	1235	14	3	83	-
5	1	1	1	25	10	1315	1235	34	3	62	—
5	1	1	1	25	11	1370	1235	15	3	62	-
5	1	1	1	25	12	1454	1210	71	28	54	Y—
5	1	1	1	25	13	1564	1235	44	3	64	—
5	1	1	1	25	14	1621	1235	15	3	40	-
5	1	1	1	25	15	1648	1235	43	3	50	—
5	1	1	1	25	16	1924	1231	7	10	0	dD
5	1	1	1	25	17	1977	1222	64	26	0	=——
4	1	1	1	26	0	293	1214	1232	68	-1	
5	1	1	1	26	1	293	1245	2	2	12	:
5	1	1	1	26	2	320	1222	44	48	26	ie
5	1	1	1	26	3	975	1217	45	51	32	2
5	1	1	1	26	4	1491	1214	34	68	15	mm
4	1	1	1	27	0	308	1249	727	70	-1	
5	1	1	1	27	1	308	1249	30	58	48	li
5	1	1	1	27	2	356	1273	8	24	88	t
5	1	1	1	27	3	941	1259	49	60	0	%,,
5	1	1	1	27	4	1004	1272	31	24	14	NS
4	1	1	1	28	0	921	1308	99	37	-1	
5	1	1	1	28	1	921	1313	40	32	26	SS
5	1	1	1	28	2	986	1308	34	33	31	Mp
4	1	1	1	29	0	305	1337	696	101	-1	
5	1	1	1	29	1	305	1337	68	64	48	©
5	1	1	1	29	2	921	1367	80	71	47	Say
4	1	1	1	30	0	268	1437	707	23	-1	
5	1	1	1	30	1	268	1437	13	23	47	8;
5	1	1	1	30	2	956	1442	19	14	15	‘“
4	1	1	1	31	0	247	1473	1863	66	-1	
5	1	1	1	31	1	247	1473	34	55	44	He
5	1	1	1	31	2	307	1493	44	33	44	iS
5	1	1	1	31	3	1029	1498	17	13	0	.
5	1	1	1	31	4	1751	1504	16	35	47	9
5	1	1	1	31	5	2050	1499	60	25	39	3g
4	1	1	1	32	0	259	1520	1853	55	-1	
5	1	1	1	32	1	259	1520	99	45	17	Pact
5	1	1	1	32	2	1136	1544	24	31	65	=
5	1	1	1	32	3	1170	1523	40	58	52	|
5	1	1	1	32	4	1391	1545	16	11	0	s
5	1	1	1	32	5	1751	1540	12	16	31	a
5	1	1	1	32	6	2044	1523	68	44	48	ge
4	1	1	1	33	0	307	1597	1259	57	-1	
5	1	1	1	33	1	307	1613	44	26	24	3
5	1	1	1	33	2	714	1597	24	44	47	3
5	1	1	1	33	3	1136	1613	24	14	20	5
5	1	1	1	33	4	1391	1607	12	47	37	i
5	1	1	1	33	5	1564	1602	2	41	41	!
5	1	1	1	33	6	1751	1596	16	48	3	:
4	1	1	1	34	0	307	1636	1259	57	-1	
5	1	1	1	34	1	307	1636	58	57	81	i>.
5	1	1	1	34	2	714	1650	24	35	76	5
5	1	1	1	34	3	928	1641	38	25	17	oe
5	1	1	1	34	4	1391	1655	12	13	40	5
4	1	1	1	35	0	243	1704	774	95	-1	
5	1	1	1	35	1	243	1717	120	82	23	[Pi
5	1	1	1	35	2	714	1704	303	72	10	so
4	1	1	1	36	0	246	1773	2100	26	-1	
5	1	1	1	36	1	246	1796	1	3	32	2
5	1	1	1	36	2	936	1773	8	26	47	Ny
5	1	1	1	36	3	1013	1777	20	11	3	a
5	1	1	1	36	4	1073	1780	11	10	0	«y
5	1	1	1	36	5	1156	1784	145	3	1	eee
5	1	1	1	36	6	1302	1773	97	25	5	aera
5	1	1	1	36	7	1398	1773	63	25	31	aera
5	1	1	1	36	8	1485	1773	35	25	37	eee
5	1	1	1	36	9	1527	1773	25	25	37	ce
5	1	1	1	36	10	1587	1784	49	3	37	ee
5	1	1	1	36	11	1705	1783	98	4	30	-—-
5	1	1	1	36	12	1872	1784	13	3	85	-
5	1	1	1	36	13	1922	1780	11	10	0	~
5	1	1	1	36	14	1985	1784	83	3	16	ea
5	1	1	1	36	15	2085	1772	66	25	8	eee
4	1	1	1	37	0	245	1781	772	71	-1	
5	1	1	1	37	1	245	1808	13	22	0	g
5	1	1	1	37	2	297	1781	16	71	70	3
5	1	1	1	37	3	981	1781	36	66	22	ny
4	1	1	1	38	0	293	1849	740	35	-1	
5	1	1	1	38	1	293	1853	16	26	40	&
5	1	1	1	38	2	928	1864	24	20	41	Oy
5	1	1	1	38	3	986	1849	47	24	46	ss
4	1	1	1	39	0	952	1875	65	44	-1	
5	1	1	1	39	1	952	1875	65	44	37	aon
4	1	1	1	40	0	917	1905	1151	129	-1	
5	1	1	1	40	1	917	1905	116	129	0	[
5	1	1	1	40	2	2044	2006	24	14	21	.
4	1	1	1	41	0	263	2016	1849	74	-1	
5	1	1	1	41	1	263	2016	11	43	8	{
5	1	1	1	41	2	937	2022	80	68	19	eben
5	1	1	1	41	3	1136	2032	24	53	49	2
5	1	1	1	41	4	1748	2044	24	40	39	2
5	1	1	1	41	5	2044	2022	24	50	50	8
5	1	1	1	41	6	2088	2024	24	51	78	2
4	1	1	1	42	0	263	2055	1842	80	-1	
5	1	1	1	42	1	263	2061	11	56	45	1
5	1	1	1	42	2	314	2083	35	52	49	3
5	1	1	1	42	3	1013	2056	86	73	37	|)
5	1	1	1	42	4	1136	2085	24	29	59	8
5	1	1	1	42	5	1738	2055	34	72	27	rt
5	1	1	1	42	6	2044	2075	61	29	75	2*
4	1	1	1	43	0	247	2108	1525	87	-1	
5	1	1	1	43	1	247	2121	102	74	52	if
5	1	1	1	43	2	918	2117	113	71	23	sd
5	1	1	1	43	3	1716	2108	56	77	68	a5
4	1	1	1	44	0	247	2189	1525	69	-1	
5	1	1	1	44	1	247	2199	13	38	17	g
5	1	1	1	44	2	317	2198	32	60	0	#
5	1	1	1	44	3	950	2190	70	65	27	ea,
5	1	1	1	44	4	1027	2211	6	4	92	~
5	1	1	1	44	5	1716	2194	24	29	46	3
5	1	1	1	44	6	1748	2189	24	54	49	5
4	1	1	1	45	0	1076	2388	854	20	-1	
5	1	1	1	45	1	1076	2394	3	14	37	1
5	1	1	1	45	2	1926	2388	4	15	49	1
4	1	1	1	46	0	1076	2416	854	48	-1	
5	1	1	1	46	1	1076	2420	3	44	91	|
5	1	1	1	46	2	1926	2416	4	44	83	|
4	1	1	1	47	0	1076	2472	854	20	-1	
5	1	1	1	47	1	1076	2478	3	14	0	l
5	1	1	1	47	2	1926	2472	4	14	49	1
4	1	1	1	48	0	250	2500	1680	82	-1	
5	1	1	1	48	1	250	2554	18	13	0	-
5	1	1	1	48	2	1076	2504	3	44	94	|
5	1	1	1	48	3	1485	2516	68	66	67	33
5	1	1	1	48	4	1926	2500	4	70	93	|
4	1	1	1	49	0	250	2561	1856	65	-1	
5	1	1	1	49	1	250	2569	63	45	47	m2
5	1	1	1	49	2	335	2580	20	17	47	=
5	1	1	1	49	3	1076	2561	3	14	52	|
5	1	1	1	49	4	1485	2585	29	27	0	a
5	1	1	1	49	5	1517	2567	19	55	0	&
5	1	1	1	49	6	1926	2582	4	44	83	|
5	1	1	1	49	7	2044	2569	62	37	42	8g
4	1	1	1	50	0	328	2596	1782	28	-1	
5	1	1	1	50	1	328	2596	31	28	39	(2)
5	1	1	1	50	2	2088	2602	22	7	46	<4
4	1	1	1	51	0	250	2588	1862	77	-1	
5	1	1	1	51	1	250	2607	105	53	27	gee
5	1	1	1	51	2	1076	2588	3	70	0	:
5	1	1	1	51	3	1926	2639	4	14	0	.
5	1	1	1	51	4	2044	2608	68	57	16	aR
4	1	1	1	52	0	1076	2666	854	49	-1	
5	1	1	1	52	1	1076	2671	3	44	89	|
5	1	1	1	52	2	1926	2666	4	43	89	|
4	1	1	1	53	0	1076	2723	854	18	-1	
5	1	1	1	53	1	1076	2728	3	13	52	1
5	1	1	1	53	2	1926	2723	4	14	36	I
4	1	1	1	54	0	1926	2749	4	44	-1	
5	1	1	1	54	1	1926	2749	4	44	88	|
4	1	1	1	55	0	237	2805	1693	49	-1	
5	1	1	1	55	1	237	2805	136	49	26	edule’
4	1	1	1	56	0	237	2805	2054	134	-1	
5	1	1	1	56	1	237	2823	114	68	62	APE
5	1	1	1	56	2	1069	2838	733	97	14	{on
5	1	1	1	56	3	1902	2805	166	134	0	pene
5	1	1	1	56	4	2203	2867	88	6	0	en
4	1	1	1	57	0	314	2913	2029	105	-1	
5	1	1	1	57	1	314	2975	9	30	44	.
5	1	1	1	57	2	1076	2947	3	71	0	:
5	1	1	1	57	3	1926	2926	4	70	66	|
5	1	1	1	57	4	2309	2913	34	87	53	=
4	1	1	1	58	0	162	2977	1944	50	-1	
5	1	1	1	58	1	162	2977	26	50	61	U0
5	1	1	1	58	2	290	2993	12	22	42	g
5	1	1	1	58	3	1485	2986	62	31	33	Bo
5	1	1	1	58	4	2044	2986	62	31	45	Bo
4	1	1	1	59	0	157	3003	2186	50	-1	
5	1	1	1	59	1	157	3010	26	23	59	»
5	1	1	1	59	2	290	3007	33	38	59	a
5	1	1	1	59	3	1076	3031	3	14	22	\
5	1	1	1	59	4	1485	3009	24	28	62	8
5	1	1	1	59	5	1529	3017	24	36	70	>
5	1	1	1	59	6	1926	3010	4	14	23	)
5	1	1	1	59	7	2044	3009	24	28	68	8
5	1	1	1	59	8	2088	3017	24	36	68	>
5	1	1	1	59	9	2309	3003	34	31	96	>
4	1	1	1	60	0	148	2973	2195	168	-1	
5	1	1	1	60	1	148	3037	35	50	8	%
5	1	1	1	60	2	229	2973	40	168	0	:
5	1	1	1	60	3	290	3033	12	12	0	.
5	1	1	1	60	4	314	2973	65	168	19	i
5	1	1	1	60	5	1076	3059	3	43	82	|
5	1	1	1	60	6	1485	3038	62	44	71	38
5	1	1	1	60	7	1926	3036	3	72	92	|
5	1	1	1	60	8	2044	3038	61	44	73	38
5	1	1	1	60	9	2308	3035	35	62	51	2
4	1	1	1	61	0	157	3102	34	23	-1	
5	1	1	1	61	1	157	3102	34	23	59	0
4	1	1	1	62	0	157	3103	2186	81	-1	
5	1	1	1	62	1	157	3127	34	23	38	S
5	1	1	1	62	2	1076	3114	3	70	71	!
5	1	1	1	62	3	1926	3120	3	43	93	|
5	1	1	1	62	4	2309	3103	34	63	24	mi
4	1	1	1	63	0	157	3166	2186	34	-1	
5	1	1	1	63	1	157	3166	26	25	67	°
5	1	1	1	63	2	320	3177	14	17	83	N
5	1	1	1	63	3	1926	3177	4	14	27	'
5	1	1	1	63	4	2315	3168	11	41	69	=a
4	1	1	1	64	0	145	3190	2198	53	-1	
5	1	1	1	64	1	145	3190	47	53	44	me
5	1	1	1	64	2	1076	3198	3	31	48	|
5	1	1	1	64	3	2309	3201	34	28	33	=
4	1	1	1	65	0	157	3143	2185	140	-1	
5	1	1	1	65	1	157	3221	34	49	79	3
5	1	1	1	65	2	229	3143	145	140	79	le
5	1	1	1	65	3	2309	3246	33	15	7	m
      Bet                                      mS                          \X

Section 40

Page 40 of 60

|
                                    |                                                                         |
                                    |                                                                         |
                                    |
                                    |                                          S K       EN                   |                       Area Schedule
                                    |                                  A             “A                                        | Storage         | 108m
                                     '                      HD       Au                           or
                                     :                        CA                  ;               a \ |                       Piicten              aan]
                                     |                -           SN     eer              ZO        SD \      \Y                 Toit            | Ssqm_|
                                     |                                                    ae          DO
                                     |             ED                                        D7               |
                                     1                                XZ                                      |
                                     |              t.                  ) OFFICE            &                 1
                                     |                         maga       SS            J                     |
                                                           }     2                Zo                          |
                                    °               |                        SSA                              !
                                     \               é                 oa                                     |
                                      \                     \ a                                               |
                                        \                                            2197 David Low Way       |
                                         \                                           Lot 625 P 93121          |
                                          \                                                                   |
                                            \                                                                 |
                                               \                                                              I
                                                 ‘ \                                                          |
                                                     \.                                                       |
                                                         ~N                                                   I
                                                           Ne
         ( ) FLOOR PLAN
              1:100
[ev [bate [oescrpron                                                                                                                             DATE      [SCALE    [NORTH
  ———— =                                 SSS                    U     pentarchl       onan                Peni hon                   ras
[2 [an [roto                nea eonaumecons, | ean aoe soe naan                    i|°                AOS 2197 David Low Way         MCU
                                       |      © cormorne              aia             meer te         OT ease                      FLOOR PLAN     er      fe
                                                                                                                                                            Page 40 of 60

Section 41

ORDINARY MEETING AGENDA                                                             30 APRIL 2020



4    MCU18/0166 - PLANNING & ENVIRONMENT COURT APPEAL NO DB897 OF 2020 –
     REFUSAL OF APPLICATION FOR MATERIAL CHANGE OF USE FOR SERVICE &
     UTILITY - TYPE 3 (TOWER) AT 244 TABLELANDS ROAD, COORAN

Author            Development Planner, Nadine Kirley
                  Environment & Sustainable Development Department

Index             ECM/ Application/ MCU18/0166/Case/Aurecon

Attachments       Nil


EXECUTIVE SUMMARY
Not applicable.

RECOMMENDATION
That Council note the report by the Development Planner to the Ordinary Meeting dated 30 April
2020 regarding Planning & Environment Court Appeal No. DB897 of 2020 and agree to defend the
appeal.


REPORT
Council, at its Ordinary meeting on 20 February 2020, resolved to refuse an application to construct
a NBN Tower on land at 244 Tablelands Road, Cooran for the following reasons:
1.   The proposed infrastructure will compromise the scenic amenity and regional landscape in an
     area identified by the SEQ Regional Plan as being of regionally significant scenic amenity
     contrary to the strategies referred to in Element 4 of Chapter 3 Goal 4:Sustain.
2.   The proposed development is inconsistent with Desired Environmental Outcome 3.1.3 m) viii
     of the Noosa Plan as the proposed development is visually prominent in the view from
     premises along Tablelands Road.
3.   The development application proposes a use that is inconsistent in the Rural Zone of the Mary
     River Catchment Locality;
4.   The proposal is inconsistent with the Mary River Catchment Locality Code in the following
     respects:
     4.1   The visual amenity enjoyed by users of nearby premises is adversely impacted contrary
           to Overall Outcome 8.7.2 a)iii;: 6, Version Date: 26/02/2020 Document Set ID: 21092349
           Page 2 of 20
     4.2   The scale and form of the structure is not integrated into the landform and landscape
           contrary to Version Overall Outcome 8.7.2 k)iii;
     4.3   The siting of the proposed structure does not protect significant views to Mt Cooroora,
           Mt Cooran and Mt Pinbarren contrary to Overall Outcome 8.7.2 v) and Specific Outcome
           O2;
     4.4   The scenic values and rural amenity of the locality are adversely impacted contrary to
           Overall Outcome 8.7.2 mm)ii;
5.   The proposal is inconsistent with the Infrastructure Uses Code because it,




                                                                                     Page 41 of 60

Section 42

ORDINARY MEETING AGENDA                                                              30 APRIL 2020


     5.1. Detracts from the rural and residential visual amenity enjoyed by residents and visitors
          to the area and does not satisfactorily visually integrate with the landscape contrary to
          Overall Outcome 14.37.2 b) and Table 1 of Planning Scheme Policy 23; and
     5.2. Fails to co-locate with the nearby existing telecommunications facility contrary to Overall
          Outcome 14.37.2 c).
6.   The proposed tower, if approved, would be afforded immunity under the Telecommunications
     Act 1997 enabling further extension of up to 5 metres without further reference to Council
     which, if implemented, would further exacerbate the adverse visual and rural amenity impacts;
7.   The visual impact of the proposal on a number of premises in the area, which have direct line
     of sight in their viewshed, is considered significant and unacceptable for those residents.
8.   The applicant’s visual impact assessment fails to satisfactorily assess the degree and extent
     of visual impacts resulting from the proposed development and it is considered impacts are
     likely to be greater than has been currently identified.
The application was referred to Council due to the high public interest in the application, its
inconsistency with the Planning Scheme and the visual impact of the proposal on the surrounding
area. A total of 442 properly made submissions were received by Council in response to the public
notification of the application. All public submissions expressed their objection to the proposal.
The proposal involved construction of a 35 metre NBN tower on land at 244 Tablelands Road,
Cooran located on a knoll in the Cooran hinterland, off Tablelands Road, approximately 100m
upslope of an existing 30 metre telecommunications tower (Refer Location Diagram in Figure 1
below). A visual impact assessment of the proposal was submitted by the applicant and
subsequently peer reviewed by Council’s Visual Assessment Consultant.




                                        Figure 1: Location Plan
In response to Council officer’s concerns around the visual impact of the proposal, the applicant
changed the application following the public notification period, reducing the height of the tower to
25 metres. With antenna attached, the overall height would now be 26 metres. At the reduced height,
the applicant expects to be able to service approximately 247 premises located in Cooran and parts
of Pinbarren, Pomona and Traveston with a direct line of sight to the tower. It should be noted that
without a direct line of sight, a premises may have patchy or no connection to the NBN services
provided by the tower.

                                                                                      Page 42 of 60

Section 43

ORDINARY MEETING AGENDA                                                                 30 APRIL 2020


A second visual impact assessment was submitted and again reviewed by Council’s Visual
Assessment Consultant. Despite the reduction in height, the proposed tower was still considered to
result in an unacceptable level of adverse visual amenity on the surrounding area, particularly the
immediate surrounding area. Of the premises that were examined in detail, one property at 298
Tablelands Road would be affected to a greater degree than most. Figure 2 below, indicates the
potential visual impact of the tower illustrated by a temporary installation of a cherry-picker at an
overall height of 25 metres from ground level, in the location of the proposed tower. The proposed
tower would be located approximately 440m from the proposed house site in this location.




 Figure 2: Photograph and commentary from owner of 298 Tablelands Rd from submission to Council received
                                             January 2020

An additional consideration that Council officer’s considered relevant to the assessment of the
application is that, while the proposed 25 metre high tower would be visible from surrounding
properties, if approved, the operation of the Telecommunications Act 1997 and the
Telecommunications (Low Impact Facilities) Determination 2018 enables immunities for extension
of the tower by up to 7 metres in total (including antennae and the like) without returning to Council
for comment or assessment. It is considered that such extension would further exacerbate the
adverse visual impact on the local area.
As a result of Council’s decision to refuse the application, the applicant has now lodged an appeal
to the Planning & Environment Court. The applicant seeks that the development should be approved.
It is in order for Council to defend the appeal and the recommendation is worded accordingly.




                                                                                         Page 43 of 60

Section 44

ORDINARY MEETING AGENDA                                                              30 APRIL 2020


Previous Council Consideration
Ordinary Meeting Minutes, 20 February 2020, Item 1, Page 9
That Council note the report by the Development Planners to the Planning & Environment Committee
Meeting dated 11 February 2020 regarding Application No MCU18/0166 for a Development Permit
for Material Change of Use Service and Utility - Type 3 Tower, situated at 244 Tablelands Rd, Cooran
and:
A.   Refuse the application for the following reasons:
     1.    The proposed infrastructure will compromise the scenic amenity and regional landscape
           in an area identified by the SEQ Regional Plan as being of regionally significant scenic
           amenity contrary to the strategies referred to in Element 4 of Chapter 3 Goal 4:Sustain.
     2.    The proposed development is inconsistent with Desired Environmental Outcome 3.1.3
           m) viii of the Noosa Plan as the proposed development is visually prominent in the view
           from premises along Tablelands Road.
     3.    The development application proposes a use that is inconsistent in the Rural Zone of the
           Mary River Catchment Locality;
     4.    The proposal is inconsistent with the Mary River Catchment Locality Code in the
           following respects:
           4.1   The visual amenity enjoyed by users of nearby premises is adversely impacted
                 contrary to Overall Outcome 8.7.2 a)iii;: 6, Version Date: 26/02/2020 Document
                 Set ID: 21092349 Page 2 of 20
           4.2   The scale and form of the structure is not integrated into the landform and
                 landscape contrary to Version Overall Outcome 8.7.2 k)iii;
           4.3   The siting of the proposed structure does not protect significant views to Mt
                 Cooroora, Mt Cooran and Mt Pinbarren contrary to Overall Outcome 8.7.2 v) and
                 Specific Outcome O2;
           4.4   The scenic values and rural amenity of the locality are adversely impacted contrary
                 to Overall Outcome 8.7.2 mm)ii;
     5.    The proposal is inconsistent with the Infrastructure Uses Code because it,
           5.1. Detracts from the rural and residential visual amenity enjoyed by residents and
                visitors to the area and does not satisfactorily visually integrate with the landscape
                contrary to Overall Outcome 14.37.2 b) and Table 1 of Planning Scheme Policy
                23; and
           5.2. Fails to co-locate with the nearby existing telecommunications facility contrary to
                Overall Outcome 14.37.2 c).
     6.    The proposed tower, if approved, would be afforded immunity under the
           Telecommunications Act 1997 enabling further extension of up to 5 metres without
           further reference to Council which, if implemented, would further exacerbate the adverse
           visual and rural amenity impacts;
     7.    The visual impact of the proposal on a number of premises in the area, which have direct
           line of sight in their viewshed, is considered significant and unacceptable for those
           residents.
     8.    The applicant’s visual impact assessment fails to satisfactorily assess the degree and
           extent of visual impacts resulting from the proposed development and it is considered
           impacts are likely to be greater than has been currently identified.
B.   Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.



                                                                                       Page 44 of 60

Section 45

ORDINARY MEETING AGENDA                                                               30 APRIL 2020


Finance & Risk
It is premature at this stage to provide advice on the likely prospects of the appeal. There will be
costs associated with defending the appeal, particularly if the matter proceeds to trial.
Consultation
External Consultation - Community & Stakeholder
Wakefield Sykes - Solicitor
Internal Consultation
The following internal consultation has been undertaken:

Departments/Sections Consulted:

    Chief Executive Officer       Community Services                      Corporate Services
    Executive Officer             Director                                Director
    Executive Support             Community Development                   Financial Services
                                  Community Facilities                    ICT
                                  Libraries & Galleries                   Procurement & Fleet
                                  Local Laws                              Property
                                  Waste & Environmental Health            Revenue Services

    Executive Services        x   Environment & Sustainable Development   Infrastructure Services
    Director                  x   Director                                Director
    Community Engagement          Building & Plumbing Services            Asset Management
    Customer Service          x   Development Assessment                  Buildings and Facilities
    Governance                    Economic Development                    Civil Operations
    People and Culture            Environmental Services                  Disaster Management
                                  Strategic Land Use Planning             Infrastructure        Planning,
                                                                          Design and Delivery




                                                                                       Page 45 of 60

Section 46

ORDINARY MEETING AGENDA                                                             30 APRIL 2020


5    RAL18/0023 - PLANNING & ENVIRONMENT COURT APPEAL NO 765 OF 2020 –
     REFUSAL OF APPLICATION FOR RECONFIGURING A LOT (1 INTO 23 LOTS) AT 28
     EENIE CREEK ROAD, NOOSAVILLE

Author            Manager, Development Assessment
                  Environment & Sustainable Development Department

Index             ECM/ Application/ RAL18/0023/Case/Stockwell

Attachments       Nil.


EXECUTIVE SUMMARY
Not applicable.

RECOMMENDATION
That Council note the report by the Manager Development Assessment to the Ordinary Meeting
dated 30 April 2020 regarding Planning & Environment Court Appeal No. 765 of 2020 and agree to
defend the appeal.


REPORT
On 20 February 2020, Council, at its Ordinary meeting resolved to refuse an application to
reconfigure 1 lot into 23 lots at 28 Eenie Creek Road, Noosaville for the following reasons:
1.   The proposal is inconsistent with schedule 11, part 2, section 7 of the Planning Regulation
     2017 as the development is situated in a koala assessable development area and does not
     avoid clearing non-juvenile koala habitat trees in circumstances in which any significant
     residual impact of the clearing is unable to be offset.
2.   The proposal is inconsistent with biodiversity assessment benchmarks (1), (2), (4) and (5) of
     Part E of the State Planning Policy as the development will adversely impact upon koala
     habitat, with koala populations recognised as being matters of both national and state
     environmental significance.
3.   The proposal is inconsistent with assessment benchmarks (3) and (4) natural hazards, risk
     and resilience of Part E of the State Planning Policy as the development does not facilitate an
     appropriate disaster management response and recovery capacity and capabilities as the
     emergency access points are unable to be implemented.
4.   The proposed development will adversely impact upon koala habitat, does not maximise the
     retention of existing vegetation, and proposes to prematurely clear significant vegetation
     inconsistent with the needs of the community contrary to Overall Outcomes 13.7.2a)i,
     13.7.2a)iii, 13.7.2a)iv, 13.7.2b), 13.7.2c), 13.7.2d) i, 13.7.2d)vii, 13.7.2g), and Specific
     Outcomes O1b, O2, O3, O7, O8b), O11, O16, O18a), O18b), O18f), O18h), O19b), O19c),
     O19d), O19g) and O19i) of the Biodiversity Overlay Code.
5.   The proposed development is inconsistent with the Overall and Specific Outcomes of the
     Noosaville Locality Code in the following respects:
     i.    The proposal does not provide a satisfactory pedestrian and cycle network for the future
           development of the area and fails to provide satisfactory linkages with the existing
           development in the Shire Business Centre contrary to Overall Outcomes 11.7.2j) and
           tt)viii), Specific Outcomes O25, O100, O101, O127, O138 and O156.


                                                                                     Page 46 of 60

Section 47

ORDINARY MEETING AGENDA                                                                30 APRIL 2020


      ii.    The proposal fails to ensure a high level of residential amenity as it does not provide for
             acoustic fencing to lots 17, 18 and 19 or provide any noise mitigation measures to
             existing plant equipment and loading dock areas and fails to address the future amenity
             of Lot 21, contrary to Specific Outcome O1.
      iii.   The proposal does not retain suitable existing vegetation to ensure future development
             will be within a park like setting contrary to Specific Outcome O3, O22 and O125.
      iv.    The proposal will adversely impact on the site’s environmental values contrary to Overall
             Outcomes 11.7.2a)iv and 13.7.2a)ii, Specific Outcomes O3, O22 and O125.
6.    The proposed subdivision is inconsistent with the Reconfiguring a Lot Code as:
      i.     Insufficient provision has been made for walking and cycling linkages with the existing
             development in the Shire Business Centre as the proposed network and linkages are
             unable to be implemented contrary to Overall Outcomes 14.181.2f), Specific Outcomes
             O8 and O9.
      ii.    The proposed lots will have a significant adverse impact on the natural environment and
             will not retain the sites natural environmental values contrary to Overall Outcomes
             14.181.2g), Specific Outcomes O21b and O22.
7.    Bushfire mitigation measures do not satisfactorily address the risk of bushfire contrary to
      Overall Outcomes 13.30.2a), 13.30.2c), Specific Outcomes O4, O7, O8, O9, O11 and O12 of
      the Natural Hazards Overlay Code.
8.    Bushfire mitigation measures result in the removal of vegetation contained within OS3 as
      detailed in Schedule 4 (Shire Business Centre Map) of the Noosa Plan.
9.    The proposed development is contrary to the draft Noosa Plan provisions, which support the
      refusal of the development application for the same reasons as those applicable under the
      current Noosa Plan because of non-compliance with requirements for pedestrian/cycle links,
      an appropriate response to the site’s natural hazards and protection of the site’s environmental
      values including vegetation retention.
10.   The proposed development cannot be conditioned to comply with the above assessment
      benchmarks.
11.   There are no matters that would warrant approval of the development application
      notwithstanding the noncompliance with the assessment benchmarks.
Refer to Council’s General Committee Agenda, 17 February 2020, Item 7, Page 28 for a full copy of
the assessment report (https://www.noosa.qld.gov.au/downloads/file/2041/2020-02-17-general-
committee-agenda).
The code assessable application was referred to Council given the subdivision sought to facilitate
the future stages of the Noosa Business Centre and represented a significant development for Noosa
Shire. The subdivision also involved a current infrastructure agreement between Council and the
land owner signed at the time of construction of stage 1 of Noosa Civic.
The application was reviewed over an extended period of time with numerous meetings held with
the applicant in an attempt to resolve the issues identified by officers and consultants engaged to
assist in the assessment. However, in October 2019 Council officers reported the matter to Council
as no agreement had been reached on a number of issues and the decision time frame was due to
expire.
The report to Council in October 2019 recommended refusal of the application due to non-
compliance with the State Planning Regulations, State Planning Policy and The Noosa Plan
requirements for the subdivision of the land. These non-compliances related to the proposal’s failure
to:
     satisfactorily address the site’s significant koala habitat,
     include appropriate mitigation measures to minimise the threat of bushfire,

                                                                                        Page 47 of 60

Section 48

ORDINARY MEETING AGENDA                                                               30 APRIL 2020


     achieve a functional stormwater management plan,
     meet traffic and road design requirements,
     address the potential noise impacts of loading dock noise and mechanical equipment from the
      Noosa Civic Shopping Centre on adjacent lots intended for future residential development,
     retain sufficient vegetation to achieve a parklike setting, and
     provide for pathway linkages and the planned future transit lot.
Council, at its October 2019 meeting resolved to defer its decision at the applicant’s request to allow
further time for the applicant to address the issues raised by officers.
Further discussion with the applicant and changes to the proposal resulted in the applicant providing
additional information and amended plans for assessment and extension of the decision making
period.
The updated information and amended plans addressed many of the issues raised by officers in the
report to Council in October 2019, with the exception of the site’s significant koala habitat,
achievement of a parklike setting envisaged by The Noosa Plan and appropriate acoustic measures
for the proposed residential lots.
The proposal resulted in significant clearing of koala habitat contrary to the Noosa Plan, the State
Planning Policy and Planning Regulations 2017. The current Infrastructure Agreement also
complicated this matter, as Council was stopped from conditioning a monetary offset for the
proposed clearing of the koala habitat as would normally be available under the Environmental
Offsets Act 2014. This Infrastructure Agreement further prohibited Council from including conditions
relating to dedication of land and works external to the site required for the extension of Hofmann
Drive as a public road and implementation of the proposed bushfire management measures.
While the applicant prepared a deed of variation to the Infrastructure Agreement to enable Council
to condition the necessary land dedication and works required for the subdivision, there was no
agreement by the applicant to provide an offset for the clearing of koala habitat as the applicant
maintained that previous dedications of open space fully offset the clearing. There were also other
significant issues proposed by the deed of variation which were reported to Council in February 2020
rendering the deed not suitable for execution by Council.
As a result of Council’s decision to refuse the subdivision, the applicant lodged an appeal to the
Planning & Environment Court. The applicant seeks that the development should be approved with
reasonable and relevant conditions.
It is in order for Council to defend the appeal and the recommendation is worded accordingly.
Previous Council Consideration
Ordinary Meeting, 20 February 2020, Item 7, Page 12
That Council note the report by the Coordinator Planning to the Special Meeting dated 28 October
2019 and the further report to the General Committee Meeting dated 17 February 2020 regarding
Application No. RAL18/0023 for a Development Permit for Reconfiguring a Lot – (1 Lot in 23 Lots)
situated at 28 Eenie Creek Road, Noosaville and:
A.    Refuse the application for the following reasons:
      1.    The proposal is inconsistent with schedule 11, part 2, section 7 of the Planning
            Regulation 2017 as the development is situated in a koala assessable development area
            and does not avoid clearing non-juvenile koala habitat trees in circumstances in which
            any significant residual impact of the clearing is unable to be offset.
      2.    The proposal is inconsistent with biodiversity assessment benchmarks (1), (2), (4) and
            (5) of Part E of the State Planning Policy as the development will adversely impact upon
            koala habitat, with koala populations recognised as being matters of both national and
            state environmental significance.


                                                                                       Page 48 of 60

Section 49

ORDINARY MEETING AGENDA                                                                 30 APRIL 2020


     3.    The proposal is inconsistent with assessment benchmarks (3) and (4) natural hazards,
           risk and resilience of Part E of the State Planning Policy as the development does not
           facilitate an appropriate disaster management response and recovery capacity and
           capabilities as the emergency access points are unable to be implemented.
     4.    The proposed development will adversely impact upon koala habitat, does not maximise
           the retention of existing vegetation, and proposes to prematurely clear significant
           vegetation inconsistent with the needs of the community contrary to Overall Outcomes
           13.7.2a)i, 13.7.2a)iii, 13.7.2a)iv, 13.7.2b), 13.7.2c), 13.7.2d) i, 13.7.2d)vii, 13.7.2g), and
           Specific Outcomes O1b, O2, O3, O7, O8b), O11, O16, O18a), O18b), O18f), O18h),
           O19b), O19c), O19d), O19g) and O19i) of the Biodiversity Overlay Code.
     5.    The proposed development is inconsistent with the Overall and Specific Outcomes of the
           Noosaville Locality Code in the following respects:
           i.     The proposal does not provide a satisfactory pedestrian and cycle network for the
                  future development of the area and fails to provide satisfactory linkages with the
                  existing development in the Shire Business Centre contrary to Overall Outcomes
                  11.7.2j) and tt)viii), Specific Outcomes O25, O100, O101, O127, O138 and O156.
           ii.    The proposal fails to ensure a high level of residential amenity as it does not
                  provide for acoustic fencing to lots 17, 18 and 19 or provide any noise mitigation
                  measures to existing plant equipment and loading dock areas and fails to address
                  the future amenity of Lot 21, contrary to Specific Outcome O1.
           iii.   The proposal does not retain suitable existing vegetation to ensure future
                  development will be within a park like setting contrary to Specific Outcome O3,
                  O22 and O125.
           iv.    The proposal will adversely impact on the site’s environmental values contrary to
                  Overall Outcomes 11.7.2a)iv and 13.7.2a)ii, Specific Outcomes O3, O22 and
                  O125.
     6.    The proposed subdivision is inconsistent with the Reconfiguring a Lot Code as:
           i.     Insufficient provision has been made for walking and cycling linkages with the
                  existing development in the Shire Business Centre as the proposed network and
                  linkages are unable to be implemented contrary to Overall Outcomes 14.181.2f),
                  Specific Outcomes O8 and O9.
           ii.    The proposed lots will have a significant adverse impact on the natural environment
                  and will not retain the sites natural environmental values contrary to Overall
                  Outcomes 14.181.2g), Specific Outcomes O21b and O22.
     7.    Bushfire mitigation measures do not satisfactorily address the risk of bushfire contrary to
           Overall Outcomes 13.30.2a), 13.30.2c), Specific Outcomes O4, O7, O8, O9, O11 and
           O12 of the Natural Hazards Overlay Code.
     8.    Bushfire mitigation measures result in the removal of vegetation contained within OS3
           as detailed in Schedule 4 (Shire Business Centre Map) of the Noosa Plan.
     9.    The proposed development is contrary to the draft Noosa Plan provisions, which support
           the refusal of the development application for the same reasons as those applicable
           under the current Noosa Plan because of non-compliance with requirements for
           pedestrian/cycle links, an appropriate response to the site’s natural hazards and
           protection of the site’s environmental values including vegetation retention.
     10.   The proposed development cannot be conditioned to comply with the above assessment
           benchmarks.
     11.   There are no matters that would warrant approval of the development application
           notwithstanding the noncompliance with the assessment benchmarks.
B.   Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.
                                                                                         Page 49 of 60

Section 50

ORDINARY MEETING AGENDA                                                               30 APRIL 2020


Finance & Risk
It is premature at this stage to provide advice on the likely prospects of the appeal. There will be
costs associated with defending the appeal, particularly if the matter proceeds to trial.
Notably mediation was held with the applicant and the Court registrar on 2 April 2020 wherein
agreement in principle was generally reached on a number of minor matters around the wording of
a new Infrastructure Agreement that would enable Council to condition the dedication of land and
works external to the site required for the subdivision.
Since the mediation further material has been supplied by the appellant which officers, Council’s
external consultants and Council’s planning solicitor are currently reviewing.
Consultation
External Consultation - Community & Stakeholder
Wakefield Sykes - Solicitor
Internal Consultation
The following internal consultation has been undertaken:

Departments/Sections Consulted:

    Chief Executive Officer       Community Services                      Corporate Services
    Executive Officer             Director                                Director
    Executive Support             Community Development                   Financial Services
                                  Community Facilities                    ICT
                                  Libraries & Galleries                   Procurement & Fleet
                                  Local Laws                              Property
                                  Waste & Environmental Health            Revenue Services

    Executive Services        x   Environment & Sustainable Development   Infrastructure Services
    Director                  x   Director                                Director
    Community Engagement          Building & Plumbing Services            Asset Management
    Customer Service          x   Development Assessment                  Buildings and Facilities
    Governance                    Economic Development                    Civil Operations
    People and Culture            Environmental Services                  Disaster Management
                                  Strategic Land Use Planning             Infrastructure        Planning,
                                                                          Design and Delivery




                                                                                       Page 50 of 60

Section 51

ORDINARY MEETING AGENDA                                                            30 APRIL 2020


6      COUNCIL MEETING STRUCTURE AND TIMETABLE

Author            Chief Executive Officer, Brett de Chastel
                  CEO’s Office

Index             ECM/ Subject/ Council Meetings General

Attachments       1.    Council Meeting Calendar April – December 2020
                  2.    Meeting Structure Options


EXECUTIVE SUMMARY
Nil.

RECOMMENDATION
That Council note the report by the Chief Executive Officer to the Ordinary Meeting dated 30 April
2020 regarding the Council meeting structure and timetable for the remainder of 2020 and:
A.     Approve the re-establishment of the Planning and Environment Committee, the Services and
       Organisation Committee, and the General Committee as Standing Committees under section
       264 of the Local Government Regulation 2012, with the relevant roles and responsibilities
       identified in the Chief Executive Officer’s report;
B.     Appoint the following Councillors to each of the Committees:
           Planning and Environment Committee
            Mayor Clare Stewart
            Councillor __________
            Councillor __________
            Councillor __________
           Services and Organisation Committee
            Mayor Clare Stewart
            Councillor __________
            Councillor __________
            Councillor __________
           General Committee
            The Mayor and all Councillors
C.     Appoint the following Chairpersons to the Standing Committees:-
           General Committee – Councillor ___________
           Planning and Environment Committee – Councillor ________
           Services and Organisation Committee – Councillor _________.
D.     Note that Council can amend its decision-making structure, membership of Committees or
       Chairpersons of Committees as it requires, by resolution, from time to time;
E.     Adopt the times and dates of future meetings of the Council and Committees in accordance
       with the Meeting Calendar 2020 shown at Attachment 1 to the report, with meetings to be held
       at the Council Chambers at Tewantin unless otherwise determined by Council; and
F.     Note that due to the COVID-19 Pandemic, Ordinary Meetings, Special Meetings and Standing
       Committee meetings can be held by teleconference / video-conference and undertaken without
       the public present if required on the basis that Council and Committee meetings can be
       livestreamed.

                                                                                    Page 51 of 60

Section 52

ORDINARY MEETING AGENDA                                                              30 APRIL 2020


REPORT
The purpose of this report is for Council to consider the re-establishment of Standing Committees
as part of its decision making process, membership of those Committees and the adoption of a
meeting timetable for the remainder of 2020.

The Local Government Regulation 2012 provides that a Council may appoint from its Councillors,
standing committees or special committees to assist it to deal with matters. It is proposed that the
Council’s decision making process continue with the system used by the Noosa Council since 2014.
Noosa Council also used a similar meeting structure prior to amalgamation in 2008. This structure
is made up of two Standing Committees each comprising the Mayor and three Councillors
(Committees), a Standing Committee comprising all Councillors (General Committee) and the
Ordinary meeting.

A local government can revisit its decision making structure at any time during its term.

Other than a mandatory requirement to hold an Ordinary meeting each month, each Council can
choose how to manage its decision-making framework. It could choose to only have an Ordinary
meeting each month, only one Standing Committee, or multiple Standing Committees etc.
Attachment 2 sets out the typical models used across Queensland local governments and outlines
some pros and cons of each of the options.

Noosa Council has traditionally used option 4 in that attachment and it has served this Council well
for many years (both pre-amalgamation and post de-amalgamation).

Pursuant to Section 264 of the Local Government Regulation 2012, it is proposed that the following
Standing Committees be re-established:
    Planning and Environment Committee comprising the Mayor and three Councillors;
    Services and Organisation Committee comprising the Mayor and three Councillors; and
    General Committee comprising the Mayor and all Councillors.

The roles of the Planning and Environment Committee, the Services and Organisation Committee,
and the General Committee are:
1.   To make recommendations to Council on:
          The formulation of program policies, objectives, priorities and levels of service and the
           course of action for specific issues and matters presented to the relevant Committee for
           determination;
          Issues arising from the monitoring and review of the operation and performance of the
           Council’s programs.
2.   To provide oversight and guidance to staff on policies and issues relating to the programs
     under their Department’s jurisdiction.

Areas of responsibility of the Planning and Environment Committee include the responsibilities
associated with the functions of:
    Development Assessment Planning;
    Building and Plumbing;
    Economic Development;
    Strategic Land Use Planning; and
    Environment (including Sustainability and Natural Areas).




                                                                                       Page 52 of 60

Section 53

ORDINARY MEETING AGENDA                                                              30 APRIL 2020


Areas of responsibility of the Services and Organisation Committee include the responsibilities
associated with the functions of:
    Community Services (including Community Facilities, Libraries and Galleries, Waste
     Management, Environmental Health, Local Laws and Community Development);
    Infrastructure Services (including Asset Management, Infrastructure Planning and Design,
     Building & Facilities, Civil Works and Maintenance and Parks);
    Corporate Services (including Finance, ICT, Revenue Services, Procurement and Fleet and
     Property);
    Executive Services (including Governance, Customer Service, People and Culture and
     Community Engagement ); and
    CEO’s office.
The General Committee has the responsibility to deal with matters not dealt with at the Planning and
Environment Committee and the Services and Organisation Committee or matters referred directly
to that Committee by the Chief Executive Officer.

As a matter of protocol, matters are referred to the General Committee for consideration when a
Councillor does not agree with the staff recommendation or when the matter is so significant that it
should be considered by all Councillors. Our protocol requires a Councillor to request a matter be
referred to the General Committee with such a request being made to the Mayor, the Chairperson
of the relevant Committee or via the CEO, generally prior to the Committee meeting.

The rules for the conduct of Standing Committees and Council Ordinary meetings are dictated by
the Local Government Act 2009 the Local Government Regulation 2012 and Council’s Standing
Orders.

Standing Committees can only deal with the subject matters for which they are formally established,
they have no statutory powers and can only recommend a course of action to the Council unless
formal delegation of power by the Local Authority has been given. It is not proposed to have Standing
Committees with decision making powers.

Like the Ordinary meeting, Standing Committees are open to the public unless a meeting is closed
pursuant to section 275 of the Local Government Regulation 2012. Noosa Council has always had
a tradition of not closing meetings to the public unless there is a clear legal requirement or need to
do so. Items for Council consideration are placed on the agenda of the appropriate Committee by
the CEO.

In relation to the conduct of Standing Committees, section 267 of the Local Government Regulation
2012, states that a local government may appoint a chairperson of each Committee or alternatively,
the Committee may appoint a chairperson if the Council does not make such an appointment. The
proposal is that Council appoints the Chairperson of the Standing Committees in the first instance.
My advice to Council is that we provide other Councillors with the opportunity to gain experience in
chairing Committee meetings in the future and it may well be that membership of the Standing
Committees can be reviewed also to provide a broader base of experience for Councillors. While up
to Council, it would be ideal to change the Chairpersons of Standing Committees after two years.

It is also proposed that the meetings of the Committees occur in the Tewantin office generally on a
monthly cycle during the remainder of 2020 as follows:
    Planning and Environment Committee, on the Tuesday morning prior to the week of the
     General Committee Meeting and the Ordinary Meeting, commencing at 9.30am.
    Services and Organisation Committee, on the Tuesday afternoon prior to the week of the
     General Committee Meeting and the Ordinary Meeting, commencing at 1.30pm.
    General Committee, on the Monday prior to the Ordinary Meeting, commencing at 10am.
    Ordinary Meeting, on the third Thursday of each month, commencing at 5pm.
                                                                                       Page 53 of 60

Section 54

ORDINARY MEETING AGENDA                                                               30 APRIL 2020


Special Council Meetings
It should be noted that Special Council meetings can be called at any time to deal with specific issues
if required.

Online Council meetings and special provisions applying to the COVID-19 Pandemic
As Council would be aware, we are currently facing a significant public health crisis which includes
strict requirements in terms of social distancing. In recognition of this issue, the State government
has passed a special regulation called the Local Government Electoral (2020 Quadrennial Election)
Regulation 2020. This is the same regulation which the government used to change how “how to
vote” cards etc were managed during the election process.
Included in that regulation are new provisions which allow councils to change how they conduct their
Committee and Ordinary meetings during the COVID-19 pandemic. A summary of these changes
is as follows:
      An Ordinary meeting or a Committee meeting can be held by teleconference / videoconference
       instead of in person (there have always been provisions allowing an individual Councillor to
       attend a meeting by teleconference but this new regulation makes it clear that the entire
       meeting can be held by teleconference).
      If the meeting is held by teleconference, the Council must ensure the meeting is available for
       real-time viewing or listening by the public either at the Council office or via the Council’s
       website.
      Further, if the Chair of the Ordinary meeting or the Chair of the Committee meeting is satisfied
       that it is not practical for the public to physically attend the meeting because of health and
       safety reasons associated with COVID-19, the meeting can be physically closed to members
       of the public but it must be live streamed.
In practice, our Council Chambers is of sufficient physical size to allow meetings to proceed with
Councillors present while meeting social distancing requirements if the Council wishes to do so. Of
course, any Councillor could seek to attend by teleconference if they wished. Also, we have
technology in place that allows us to live stream all Council and General Committee meetings.
We have set up technology to allow for Standing Committee and Ordinary meetings to be undertaken
by video-conference and live streamed at the same time.
Community Council Meetings
Council has held two Ordinary meetings per year offsite in recent years. These community Council
meetings provide an opportunity for local communities to meet with the Mayor and Councillors and
discuss local issues. Most of these have been held in hinterland towns in recent years and have
mainly been well attended by local residents as an opportunity to meet with elected representatives
and discuss local issues. It is intended to continue this process, however given the current situation
with the coronavirus, we will revisit this issue when safe to do so. A separate report will be provided
to Council on potential community based Council meetings once the coronavirus pandemic threat
recedes.

Previous Council Consideration
Nil.

Finance
Provision exists within the 2019-20 budget to meet any expenses associated with the conduct of
Council meetings.

Risks & Opportunities
Meetings are the principal decision-making forum for local governments and all decisions are made
at the Ordinary meeting with Committee meetings making recommendations to Council.

                                                                                        Page 54 of 60

Section 55

ORDINARY MEETING AGENDA                                                                      30 APRIL 2020


Consultation
External Consultation - Community & Stakeholder
Nil.

Internal Consultation

Executive Team
Mayor and Councillors

Departments/Sections Consulted:

 X     Chief Executive Officer   X   Community Services                      X   Corporate Services
       Executive Officer         X   Director                                X   Director
 X     Executive Support             Community Development                       Financial Services
                                     Community Facilities                        ICT
                                     Libraries & Galleries                       Procurement & Fleet
                                     Local Laws                                  Property
                                     Waste & Environmental Health                Revenue Services

 X     Executive Services        X   Environment & Sustainable Development   X   Infrastructure Services
 X     Director                  X   Director                                X   Director
       Community Engagement          Building & Plumbing Services                Asset Management
       Customer Service              Development Assessment                      Buildings and Facilities
       Governance                    Economic Development                        Civil Operations
       People and Culture            Environmental Services                      Disaster Management
                                     Strategic Land Use Planning                 Infrastructure        Planning,
                                                                                 Design and Delivery




                                                                                              Page 55 of 60

Section 56

ORDINARY MEETING AGENDA    30 APRIL 2020


                          ATTACHMENT 1




                            Page 56 of 60

ORDINARY MEETING AGENDA                                                      30 APRIL 2020

                                                                              ATTACHMENT 1
 eke] NOOSA COUNCIL
   om                                       MEETING CALENDAR 2020

             APRIL                             MAY                            JUNE
  M    T   Ww  T    F   S    Ss    M    T   Ww  T    F   Ss  Ss     M   T   Ww   T   F   Ss   Ss
           1   2    3   4    5                       1   2   3! /1      2   3    4   5   6   7
  6   7    8   9                        5   6   7   8    9   10} | 8        10  11   12  13  14
      14   15  16  17   18  19              13  14  15  16   17         16  17°18 19     20  21
  20  21  22   23  24°25 26            19  20 21 22     23  24     22   23  24  25  26   27  28
 27   28  29   30                  25  26  27   28  29  30  31     29   30
             JULY                           AUGUST                        SEPTEMBER
  M   T    Ww  T    F   Ss  Ss     M    T   WwW T    F   Ss  Ss     M   T   WwW  T   F   Ss   Ss
           1   2    3   4    5                           1   2          12       3   4   5   6
  6        8   9   10   11 12      3    4   5   6    7   8   9} | 7         9   10       12 13
      14  15 16 17      18  19     10       12  13  14  15   16         15  16       18  19  20
 20   21  22   23  24   25  26         18   19/20 21    22  23     21   22  23  24  25   26  27
 27   28  29   30  31              24  25  26   27  28  29  30     28   29  30
                                   31
          OCTOBER                         NOVEMBER                         DECEMBER
  M   T    Ww  T    F   Ss  Ss     M    T   Ww  T    F   Ss  Ss     M   T   Ww   T   F   Ss   Ss
                1   2   3   4                                1          12       3   4   5   6
           7   8    9   10  11} |2      3   4   5    6   7   8      7       9   10   11  12  13
      13  14 15 16      17  18     9        11  12  13  14   15         15  16       18  19  20
  19  20  21   22  23   24  25         17   18/49 20    21  22     21   22  23  24           27
 26   27  28   29  30   31         23  24  25   26  27  28  29          29  30  31
                                   30

  Membership:
  Planning & Environment Committee:    To be determined
  Services & Organisation Committee:   To be determined
  General Committee                    All Councillors

       9.30am Planning & Environment Committee              Public Holidays
       1.30pm Services & Organisation Committee                         y
PY toam        General Committee
 |   | 5pm     Ordinary Meeting

                                                                                 Page 56 of 60

Section 57

ORDINARY MEETING AGENDA    30 APRIL 2020


                          ATTACHMENT 2




                            Page 57 of 60

ORDINARY MEETING AGENDA                                                               30 APRIL 2020

                                                                                    ATTACHMENT 2
                 OPTIONS FOR COUNCIL MEETING STRUCTURES

  Some brief notes on different types of Council decision making structures. There are nuances on
  some of these but these are the most common types for Councils in Queensland.

  OPTION 1 - Council Meetings only (No Committees)

     @) cellar las
     meeting

  About
  °     Used by a lot of councils (particularly smaller councils).
  °     Most use a once a month meeting approach but some run two meetings a month.
  Pros
  e    All Councillors deal with all issues and make a decision on the day
  °     Less meetings
  Cons
  °     Difficult to request further information without deferring the decision to the next month.
  °     Less time between the issue of the agenda and the decision time leaving less time for
       consideration by Councillors.
  °     Only able to consider the issue once, not debate and seek further information before the final
       decision.
  e     Leads to long Council meetings (often all day) which can lead to fatigue towards the end of the
       day and potentially poor decision-making.

  OPTION 2 - Council Meeting with one Standing Committee

     Standing            Ordinary
    Committee            meeting

  About
  °    All Councillors are members of a committee (often called a General Committee) that considers
        issues on the agenda in the first instance and makes recommendations to the Council.
  °    The Standing Committee does not make any decisions per se (other than a decision to make
       a recommendation to the Council).
  °    The Council then considers the recommendations from the Standing Committee and makes
        its decisions.
  Pros
  °    All Councillors have input into all matters on the agenda in the first instance.
  °    With a significant number of new Councillors, this approach would assist new Councillors in
       getting across all issues coming before the Council for consideration.
  e    There is time between the Standing Committee meeting and the Council Ordinary meeting to
        receive more information before the final decision is made.
  °     It allows Councillors “two bites of the cherry” to consider the issues and hear debate before a
       final decision is made.
  Cons
  e     Likely to lead to very long General Committee meetings which could lead to fatigue towards
       the end of the day and potentially poor decision-making.
  °     Higher level of workload for all Councillors with two meetings to consider all issues.

                                                                                       Page 57 of 60

Section 58

ORDINARY MEETING AGENDA   30 APRIL 2020




                          Page 58 of 60

ORDINARY MEETING AGENDA                                                        30 APRIL 2020

 OPTION 3 - Council Meeting with multiple Standing Committees (No General Committee)

    Standing
    eye        ‘N\,
    Standing            1) collar 1a%
   Committee            meeting
    Standing     a
   Oe

 About
 e     The Mayor and a few Councillors make up each Standing Committee with each Committee
       making recommendations to the Council on the specific subject matters allocated to that
       standing committee.
 e     The Ordinary meeting of the Council then makes the final decision.
 e     This model is used by quite a few of the larger councils.

 Pros
 e     A more efficient use of time for Councillors with sharing of the load to consider matters and
       make recommendations to Council.
 e     Can be more informal at smaller Committees (positive for both staff and Councillors).
 e     Allows for more information to be provided between the Committee meeting and the Council
       meeting if required.
 Cons
 e     Not all Councillors have input into controversial or significant issues in the first instance.
 °     Other Councillors may choose to attend Committees they are not on to “keep an eye” on other
       subjects, thus adding to workload.

 OPTION 4 — Council Meeting with multiple Standing Committees and a General Committee

                 _——
   Committee  ™       eral ee)           Ordinary
                     Oo) aaiico       ,   meeting
    Standing   /-
   Oe

 About
 e     This is the model used by Noosa Shire Council for many years.
 e     It is a “multi-layered” model with the initial Standing Committees making recommendations to
       Council on minor or non-controversial matters and the Standing Committee considering major
       or controversial matters.
 e     The Ordinary meeting of the Council makes the final decision based on recommendations from
       the various Committees.
 e     This model is not widely used in other councils.

                                                                                 Page 58 of 60

Section 59

ORDINARY MEETING AGENDA   30 APRIL 2020




                          Page 59 of 60

ORDINARY MEETING AGENDA                                                            30 APRIL 2020

  Pros
  e    Well understood by existing Councillors and staff due to its historic use at Noosa Council.
  °    The two initial Standing Committees allow for very informal discussion which is a good learning
       ground for staff and Councillors.
  e    The General Committee deals with major matters/controversial issues allowing all Councillors
       to have input into those important matters before a final decision is made by the Council.
  e    Allows time for further information to be provided to the General Committee or Council Ordinary
        Meeting if required.
  Cons
  e     In the post COVID-19 environment, there may not be as many reports to Council resulting in
       fewer reports to the initial two Committees.
  e     Not all Councillors address all issues at a Committee level before the matter comes to Council.
  °    The majority of items may end up being referred to the General Committee so all Councillors
       can have input which almost negates the need to have the smaller Committees.

                                                                                    Page 59 of 60

Section 60

ORDINARY MEETING AGENDA     30 APRIL 2020



10   CLOSED SESSION

     Nil.




11   PUBLIC QUESTION TIME




12   NEXT MEETING

     To be determined.




13   MEETING CLOSURE




                            Page 60 of 60

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.