1.0 GENERAL 2.0 EXCAVATION AND EARTHWORKS 3.0 FINISHED LEVELS & GRADES Branches should be evenly distributed, exhibit a
All works to be performed by a licensed Inspect the site and ascertain the nature of Minimum cross falls of 1:50 on planting and full well formed canopy that occupies a
Contractor familiar with landscape construction excavation required and the working conditions pathways to drainage collection points and minimum 1/3 of the overall current height.
of this nature. The Contractor shall verify the that will be encountered prior to the overflow points. Planting areas should not Specimens are to be prepared for their
location of utilities on site prior to the commencement of work. The location of topsoil exceed 1:3. intended purpose. For ex-ground stock where
commencement of construction, and ensure stockpiles, roadway and cut embankment canopy modification is intended, provide details
that they will not have an effect on the works. profiles and water connection points must be 4.0 CULTIVATION & SUBSURFACE DRAINAGE of how each specimen's visual character will be
The Landscape Subcontractor is advised to visit taken into account. The Landscape Subcontractor is to provide for at time of delivery.
the site to satisfy themselves as to local sufficient surface and sub-surface drainage to
The Landscape Subcontractor shall ensure
conditions, accessibility, storage space, the full
extent and character of the works and the site,
measures to minimise erosion and siltation
relative to the works outlined in this
garden and grass areas to ensure adequately
drained soft landscaped areas free from surface
Foliage shall be evenly distributed across the
crown in proportion to the branching structure
as well as be of a true colour typical of the
landscape design
the nature of the ground, the level of the ponding water and heavy/ waterlogged soils.
specification, including staging of the works, specie, dense and of good size. Ensure foliage is
subsoil water, the supply of materials and Surface and sub-surface drainage is to aid in the
stabilisation of exposed surfaces, diversion free of deficiencies and burn. Plant material is
water and the execution of the contract healthy growth and continued thriving of all t 07 3217 6491 m04 1616 9858
drains and silt traps over and above those to be 'hardened' to full sun and exposed
generally. No claim will be allowed for any plant stock and grass areas.
already installed in civil works. conditions by the supplier to ensure successful po box 527 paddington qld 4064
alleged inadequacy of the description herein. Comply with the relevant Australian Standards plant establishment into the site environment.
Should there be any conflict, the Contractor Surface drainage shall be diverted clear of
to the extent that they are relevant and not For ex-ground stock apply an anti-transpirant.
www.seedlandscapes.com.au
shall notify the Landscape designer excavations and covers shall be provided where
necessary for safety. Ensure that run-off is not over-ridden by the specification.
immediately. At the time of the last plant stock review prior
concentrated onto adjoining properties and
Cultivate sub-grade to a minimum depth of
to site delivery, plant material is to conform abn 85 468 007 510
does not cause a nuisance thereto. Finished 150mm prior to placing topsoil to all planting
Figured dimensions shall take precedence over with the specified minimum plant sizes in the
surfaces shall be graded in accordance with and turf areas on ground.
scale measurements and large scale drawings Plant Schedule. Plants shall not exhibit signs of
over small scale. Unless otherwise specified Construction Plans. having been stressed at any stage during their
5.0 FILL & TOPSOIL
the Drawings and Specification shall include development due to inadequate watering,
everything reasonable for the proper and entire
Erect barriers as required to prevent excavated Fill and subsoil material used to make up levels
excessive shade/sunlight, suffered physical
notes
material and rocks from intruding onto shall be re-used from previous earthworks
completion of the work, not withstanding any adjoining properties. Establish exact locations operations on site or imported as required and damage or have restricted habit due to growth Use figured dimensions in preference to scaled.
omission in the Specification or Drawings. of services, drains, sewers and water supply shall be excavated material which is composed in nursery rows.
Verify discrepancies between Specification and Notify the Landscape Designer before proceeding if
lines and points prior to commencing works and of natural site subsoils but free from: any anomaly is found between this drawing and
Drawings with the Landscape Designer before ensure their protection during the works. 9.0 TURFING
· Logs, stumps or other un-decomposed conditions on site.
proceeding with the particular work. Failure to Supply and install A-grade turf (variety specified
All major earthworks associated with this vegetative material.
do so will not be taken as a reason to claim for on drawings) to areas shown on drawings. Details not certified for construction. Contractor
project shall be carried out as part of the · Materials susceptible to spontaneous
extra work. Finishing levels should be flush with adjacent responsible for structural engineering
Landscape Works. combustion.
surfaces unless otherwise detailed. Spread certifications,hydraulic certifications & building
· Clay, of liquid limit exceeding 90 and/or
Convey soils, earth, sand, loose debris and the topsoil and grade surface to ensure a level approvals.
ENVIRONMENTAL PROTECTION plasticity index exceeding 65.
like to or from the site in a manner that will finished surface, which drains to nominated
The Landscape Subcontractor should consider · Refuse and rubbish, including paper, plastics, Levels taken from information provided from the
prevent dropping of materials on streets, public field gullies.
in every instance whether the use of chemicals rubber, metal and all type of containers. Client's site setout plan. Confirm all finished levels on
and private areas. Cover all loads with taut Turf to be free from nutgrass or other noxious
is strictly necessary before application, and · Concrete, bitumen, brick, steel, masonry site prior to excavation.
heavy-duty purpose fitted tarpaulins to ensure rubble or other deleterious material. weeds or any other material deleterious to
no loss of load or dust. Ensure that the wheels, assess the product, site conditions and species
to ensure minimum risk to his employees, other · Toxic substances and compounds that would plant growth. © 2015 SEED Landscapes
tracks and body surfaces of all vehicles and
users of the site and the environment. inhibit healthy plant life. Deliver the turf within 24 hours of cutting, and all rights reserved. the information contained in the
plant leaving the site are free of mud and that · Any material not capable of being
mud is not carried onto adjacent paved streets When using pesticides the Landscape lay it within 36 hours of cutting. Prevent it from document is copyright and cannot be reproduced or
Subcontractor must use a certified operator satisfactorily compacted. drying out between cutting and laying. copied by any means without the written permission
or other areas.
and take appropriate safety precautions in Any such material shall be removed from site to of seed landscapes.
accordance with all current statutory the Landscape Subcontractors own tip. 10.0 EDGING
Check all delivery tickets, labels, identification
regulations. Sandy subsoils are preferred for these works. Supply and install all edging as per drawings.
marks and, the goods themselves to ensure
The Landscape Subcontractor must dispose of Clay soils may be used when in a dry state, but Paved edging shall sit on 100mm of concrete.
that all products comply with the project
unused and unwanted containers and extreme care is necessary to ensure the Timber edging must be constructed from
documents. Where different types of any
chemicals in a safe way in accordance with the resulting subsoil profiles are not compacted or hardwood and joined using galvanised fittings. NB. Where specifications conflict with details
product are specified, check to ensure that the
methods approved by the relevant authorities. subject to excess moisture. provided, specifications override details. Contact
correct type is being used in each location. In
particular, check that:- Disposal will be off site. Supply and install imported topsoil that 11.0 IRRIGATION Seed Landscapes to confirm.
All stock has been adequately protected for Herbicide must never drift, fall or run-off onto complies with Australian Standards to all turf The irrigation system shall be fully automatic
loading and in transit. open water or onto adjacent sites, gardens or (100mm) and garden (300mm) areas as shown provide even cover to all grass and planting
The sources, types, qualities, finishes and ground not intended for treatment. on drawings unless otherwise specified. Ensure areas. Do not waste water. Take particular care
colours are correct, and match any approved modified site soil is free from stones, sticks, to install the correct nozzle for the situation, project
The Landscape Subcontractor will be
samples. roots, rubbish and material toxic to plant and also allow for specific sprinkler and valve
responsible for assessing any potential wildlife
The correct species, cultivars, pot sizes, plant
height, girth or spread have been supplied for
each consignment from the supplier.
problem when tendering and during the course
of the works. Allowance must be made for any
protection or control of such pests the
growth. Modified topsoil shall have a friable
structure with good drainage and high organic
content.
adjustment as will be required.
This Specification is not project or site specific.
The intent is to provide a basis on which a
150922
All materials should be clean, undamaged and Fire Ant Control 6 Crank Street
Landscape Subcontractor deems necessary. professional standard, fully operational,
otherwise in good condition. Subsequent wallaby or rabbit damage to The Landscape Subcontractor is to allow to compliant (with all applicable industry, local Sunshine Beach QLD 4567
Where appropriate protective covers should be planting or other works will be deemed as carry out all necessary measures, inspections authority and Australian standards) irrigation
intact with unbroken seals. defective work and subject to replacement as and safeguards to ensure Fire Ants do not enter system can be provided for the site. Submission
per the normal contract conditions. the site via equipment, machinery, materials of the design to Local Authority for approval client
Ensure adequate provision is made for the Any proposed method of protection or control and plant stock. and all costs involved are the responsibility of
protection and storage of deliveries. In
particular ensure that:-
Materials which may deteriorate with storage
of pests must be agreed with the
Superintendent prior to use on site.
Restrict dust caused by the Works to a
6.0 FERTILISER
Provide proprietary fertilisers, delivered to the
the irrigation subcontractor.
Fully automatic commercial quality system; Kidd & Co
must not be stockpiled on site.
Adequate and appropriate provision is made
for storage prior to deliveries arriving on site.
minimum. Take all practicable steps to
minimise noise resulting from the Works.
site in sealed bags marked to show
manufacturer or vendor, weight, fertiliser type,
N:P:K ratio, recommended uses and application
· 24 station (min) commercial controller in
lockable box;
· Mains tapping point back flow device,
Designers
ALL materials in storage are to be suitably rates. Store in a dry secure environment. including dual check valve in lockable box to
EROSION AND SEDIMENT CONTROL
protected from physical damage and extremes Apply according to manufacturer's council requirements, to be undertaken by
Take all precautions necessary to prevent
of weather and to minimise hazards persons, recommendations builder refer to hydraulic drawings;
erosion, contamination and sedimentation of
materials and equipment. Keep storage areas (rate/reapplication/watering). · Filter at back flow;
the site, surrounding areas, water and drainage
neat and tidy. · Control wire;
systems, in accordance with the Environmental Garden beds - Slow Release - Osmocote or · Conduit access to all isolated areas;
drawing
Do not use roads, driveways, paths hard Protection (Water) Policy 1997. Methods of similar approved. · Drip irrigation to new garden areas;
standings and the like forming part of the works
for access or storage unless prior written
approval has been given.
protection shall include but not be limited to
the following:
· Construction of temporary surface swales;
Tree plantings - Slow Release - Osmocote or
similar approved.
Grassing - Growforce 301 or similar
· Pop-up irrigation to grassed areas;
· Coordinate penetrations and suspended
under slab conduit and copper work with
specifications
· Diversion and dispersal of concentrated flows approved100kg/Ha
Operatives must be appropriately skilled and to point where the water can pass through
builder. drawing no. 150922 01
experienced for the type and quality of work · An approved rainswitch override is to be drawn ps
the site without damage; 7.0 MULCH
and familiar with the terms of the specification. installed to cut-off irrigation after a pre-set
· Construction and maintenance of silt traps (eg Supply and install organic mulch to a minimum
Inspect products/materials/stock carefully rainfall level has been reached. Install to
hay bales) to prevent the discharge of of 100mm and gravel mulch to a minimum of
before use and reject any which are defective. manufacturers' directions with a manual
scoured materials to downstream areas; 50mm. Ensure mulch meets Australian
Use products/materials only in the method and override switch.
· Progressive restoration of disturbed areas; Standards and is free from deleterious matter,
for the purpose recommended by the · Construction of temporary siltation fencing. fungi and disease. Mulch shall finish 25mm Give 10 working days notice of the proposed
manufacturer. below adjacent surfaces. date for the instruction. Provide written
Ensure appropriate quantities are utilised, Any erosion damage reinstatement or cleanup
operational instructions for the installation
provide adequate measures for mixing and as a result of the contractor not adequately
8.0 PLANT SUPPLY under the Contract. The defects liability period issue
spreading of all products or materials. protecting the site, materials or the works shall
The Contractor shall supply plants as specified for the irrigation system shall be 52 weeks from
Set out components or stock to ensure correct be the responsibility of the landscape
contractor. in the planting schedule. Plants shall be the date of Practical Completion. a 19/10/15 client approval
positioning and spacings are achieved. delivered on site true to pot size, species and b 22/10/15 client approval
Protect finished work from subsequent Remove temporary erosion control measures type, and free of weeds, disease and fungal 12.0 TANK INSTALLATION
operations and interference by others as when they are no longer required. infection. Substitutes will not be made without Supply and install tank to size and location
project progresses. prior consent of the Landscape Designer. specified as per drawing by others.
EXISTING TREES
Unless otherwise specified, reinstate all existing Protect all existing vegetation unless otherwise All plants shall be true to scheduled 13.0 LIGHTING
surfaces, items, structures and anything specified. All vegetation and weed removal is to nomenclature, well formed, hardened off and All lighting is to be carried out out a qualified
disturbed or damaged by the performance of be carried out using industry standard accepted disease free nursery stock. They shall be electrician. All recommended lighting is merely
the works, to its condition at the safety procedures and equipment to ensure container grown in potting soil with root system a suggestion, with the ultimate style of lighting
commencement of the Contract, other than personal and environmental protection. Avoid firmly established but with no large roots used at the description of the client.
that forming part of or directly modified by the damage to nearby trees and surroundings. growing out of the container. No plant shall be
new work. Grub out stumps and roots over 75mm pot bound. 14.0 MAINTENANCE/ESTABLISHMENT PERIOD
Remove and cart away debris, spoil and surplus diameter to a minimum depth of 500mm below Ensure that trunks and branches are free of Maintenance of all landscape works is to be
building materials from the site and buildings, sub-grade. Stumps less than 75mm diameter dieback, cavities, sunburn and secretions. Trunk carried out by the Contractor until completion
with the exception of those works associated shall be cut off at ground level and treated to and braches are to be evenly tapered and of the landscape works.
with others prior to practical completion. prevent regrowth. textured typical of the specie. Plant material is Maintenance includes replacement of dead
Completely remove woody weeds within the to be matured enough to support themselves and/or diseased plant stock, removal of weeds
extent of works. without staking. and rubbish, weed spraying and mowing.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 3 pages
Page 2
seed
LANDSCAPE PLAN
Scale 1:200 @ A3
landscape design
t 07 3217 6491 m04 1616 9858
po box 527 paddington qld 4064
www.seedlandscapes.com.au
abn 85 468 007 510
notes
Use figured dimensions in preference to scaled.
Notify the Landscape Designer before proceeding if
any anomaly is found between this drawing and
conditions on site.
Details not certified for construction. Contractor
responsible for structural engineering
certifications,hydraulic certifications & building
approvals.
SHRUB PLANTING: Levels taken from information provided from the
Client's site setout plan. Confirm all finished levels on
Shrubs and trees to screen fence
34
site prior to excavation.
and provide privacy from neighbours
33
© 2015 SEED Landscapes
TREE PLANTING: all rights reserved. the information contained in the
32
21°3
Shade trees with non-invasive 0
18.3 '00"
document is copyright and cannot be reproduced or
31
77
copied by any means without the written permission
root systems to maintain RETAINING WALL: of seed landscapes.
privacy and aid in sustainable Boulder retaining wall to terrace
building practices steep sloped garden area
GARDEN EDGING: TURFED AREA:
75mm corten steel 'formboss' garden Install A-Grade Green Couch Turf
edging to separate all garden, deco over 100mm topsoil to open space
and turfed areas; install as per SCREENING PLANTING:
manufacturers guidelines Planting to screen clothesline and
provide privacy from neighbours
TIMBER FENCE: DRYING AREA: project
34
1800mm timber paling fence to side
110.4 m2
Fold-down clothesline to drying
boundary as per architects drawings area; refer to manufacturers details 150922
270°00'
33.444
6 Crank Street
TIMBER FENCE: Sunshine Beach QLD 4567
33
1800mm timber paling fence to side
28
boundary as per architects drawings
client
ACCESS PATH:
1m wide path for fire exit from
rear of property Kidd & Co
Designers
30
drawing
POOL GATE:
270°00'00"
26.709
Frameless glass pool gate to access
pool courtyard; fencing must comply
to local council and Australian
Standards codes FEATURE PLANTING:
landscape plan
Feature planting to create aesthetic drawing no. 150814 02
TREE PLANTING: visual diversity in the landscape drawn ps
Screening trees to 6m to reduce CONCRETE DRIVEWAY: scale 1:200 @ A3
impact of building
'
Standard entry driveway, north
Standard local council crossover;
Refer to engineers details issue
ORGANIC MULCH: a 18/10/15 client approval
75mm deep organic 50mm TREE PLANTING: b client approval
28 20/10/15
Hoop bark mulch (no fines) to Shade trees with non-invasive root c 22/10/15 client approval
all garden beds unless systems to maintain privacy and aid
otherwise stated in sustainable building practices legend
SCREENING PLANTING:
GARDEN EDGING: 17.099
180°0'00''
1500mm wide dense planting to proposed tree
75mm corten steel 'formboss' garden
screen fence and provide privacy existing tree
edging to separate all garden, deco
from street frontage
and turfed areas; install as per groundcovers/grasses
manufacturers guidelines STREET IDENTIFICATION:
Rendered block plinth stainless proposed shrubs
steel Letterbox with s/s street turfed areas
TURFED AREA: number identification and
Install A-Grade Green lighting driveway
Couch Turf over 100mm pedestrian path
topsoil to council verge Crank Street
paved area
Page 3
seed
PLANTING PLAN
Scale 1:200 @ A3
landscape design
t 07 3217 6491 m04 1616 9858
po box 527 paddington qld 4064
www.seedlandscapes.com.au
abn 85 468 007 510
notes
Use figured dimensions in preference to scaled.
Notify the Landscape Designer before proceeding if
any anomaly is found between this drawing and
conditions on site.
Details not certified for construction. Contractor
responsible for structural engineering
certifications,hydraulic certifications & building
approvals.
29 SYZ HG
Levels taken from information provided from the
Client's site setout plan. Confirm all finished levels on
34
site prior to excavation.
33
8 CRI ped © 2015 SEED Landscapes
all rights reserved. the information contained in the
32
5 MYO ell 21°3
0 document is copyright and cannot be reproduced or
18.3 '00"
31
2 WAT flo 77
copied by any means without the written permission
of seed landscapes.
5 MYO ell
10 LOM til
10 LOM til 7 CRI ped
1 WAT flo
5 MYO ell
11 SYZ cas
project
34
110.4 m2
150922
270°00'
33.444
6 Crank Street
Sunshine Beach QLD 4567
33
28
client
14 ALP RB
Kidd & Co
21 SYZ cas
Designers
30
270°00'00"
drawing
26.709
18 LOM lon
12 ALO bri
24 VIO hed
7 VIO hed
1 CUP ana
planting plan
6 ALP RB 10 ALO bri drawing no. 150922 03
19 ALP RB 18 ALP RB drawn ps
8 VIO hed 2 PAN ped scale 1:200 @ A3
5 VIO hed
'
2 PAN ped north
10 LOM til
12 MYO ell issue
a 19/10/15 client approval
28 b 20/10/15 client approval
c 22/10/15 client approval
9 SYZ HG
8 LOM til 8 LOM til legend
1 HIB rub 17.099 2 HIB rub
180°0'00''
6 SYZ HG proposed tree
existing tree
groundcovers/grasses
proposed shrubs
1 LOP con turfed areas
driveway
pedestrian path
Crank Street
paved area
Page 4
seed landscape design
t 07 3217 6491 m04 1616 9858
po box 527 paddington qld 4064
www.seedlandscapes.com.au
abn 85 468 007 510
notes
Use figured dimensions in preference to scaled.
Notify the Landscape Designer before proceeding if
any anomaly is found between this drawing and
conditions on site.
Details not certified for construction. Contractor
responsible for structural engineering
certifications,hydraulic certifications & building
approvals.
Levels taken from information provided from client's
site setout plan. Confirm all finished levels on site
prior to excavation.
© 2015 SEED Landscapes
all rights reserved. the information contained in the
document is copyright and cannot be reproduced or
copied by any means without the written permission
of seed landscapes.
100mm mulch layer
TURF: 200mm deep modified project
A-Grade turf site soil except where
IMPORTED SOIL:
100mm depth bedding course
tree plantings occur
150922
6 Crank Street
Sunshine Beach QLD 4567
client
SUBGRADE
Kidd & Co
CULTIVATED SUBGRADE:
100mm min depth cultivated
Cultivate subgrade
to 100mm depth. Designers
sub-grade
TURF PLANTING DETAIL ORGANIC MULCH DETAIL
drawing
Stake and tie single Scale 1:25 @ A3 Scale 1:25 @ A3
stemmed stock with
appropriate materials details
drawing no. 150922 04
Excavate hole drawn ps
1000mm wide Provide Provide depression
and 1000mm depression in 75mm
in mulch at base of
75mm
deep, backfill mulch at base plant
Mulch Mulch
hole with of plant
issue
modified site
a 19/10/15 client approval
topsoil
4 x 10g slow
release
fertilizer tablets
Install root
barrier to
900mm SUBGRADE SUBGRADE
deep
Cultivate soil at Excavate hole 200mm wider
100mm cultivated subgrade Excavate hole 200mm wider & 100mm
base of hole to deeper than pot size and backfill cultivated & deeper than pot size and
100mm depth SUBGRADE with imported topsoil subgrade backfill with imported topsoil
TREE PLANTING DETAIL SHRUB PLANTING DETAIL MASS PLANTING DETAIL
Scale 1:25 @ A3 Scale 1:25 @ A3 Scale 1:25 @ A3
Used in these records
Landscape Plans.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.8 MB (small file)
- File type
No other editions are linked here.