Original source · versioned page text
Slope Stability - lindsays
LINDSAY CONSULTING PTY LTD
LINDSAY CONSULTING PTY
LTD
RPEQ 4928
OFF. 2C/82 PARKER STREET, MAROOCHYDORE PH 54 792 118
BUILDER TO REFER TO THE APPROPRIATE DETAILS THIS DRAWING REMAINS THE PROPERTY OF
LINDSAY CONSULTING PTY LTD AND IS FOR
TO SUIT THE CUT/FILL PLATFORM. THE SOLE USE OF THE CLIENT. NO PART
MAY BE USED IN PART OR WHOLE WITHOUT
PRIOR EXPRESS WRITTEN CONSENT OF
LINDSAY CONSULTING PTY LTD
CLIENT AND PROJECT DESCRIPTION
External edge
GUY MELDRUM
1 in 20
Fall
beams EB1
Cut batter as per PROPOSED RESIDENCE
BCA Part 3.1.1 NO.4 TRISTANIA DRIVE
MARCUS BEACH
Internal beams
IB1 Spoon Drains top & bottom. DRAWING TITLE
Free draining to street TYPICAL PLATFORM DETAILS
Fall Fall
1 in 20 1 in 20
SCALES
Internal beams
IB3
100 mm SLAB TOP FABRIC SURVEY DATUM
CU
Fill piers as per detail .
T
EB2. Piers to be 300mm
below natural ground line
FIL
ASSOCIATED CONSULTANTS
L
Proposed Cut/Fill Line Fill batter as per
Builder to confirm with surveyor. BCA Part 3.1.1
TYPICAL CUT/FILL PLATFORM PLAN
SCALE 1:100
PLAN IS FOR SITE DRAINAGE PURPOSES &
CUT/FILL CONDITIONS THAT MAY OCCUR. REVISION LIST
BUILDER TO CONFIRM A BUILDER REVIEW - NOT FOR CONSTRUCTION 25/03/22
Computer File
220061FD.DWG
DRAWING NUMBER SHEET REV.
22-0061-F9 9 A
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.