Officer: 	Georgina Schramm
Direct Telephone: 	07 53296569
Our Reference:	RAP22/0004
Your Reference:	002384
29 July 2022
GF Johnson
C/- RG Strategic Australia
PO Box 1818
NOOSA HEADS QLD  4567

[email protected]
Dear Sir/Madam,
Referral Agency Response
Planning Act 2016
I refer to your application and advise that Council, as a concurrence agency for the application, completed its assessment of the application on 29 July 2022. You are advised that Council requires conditions to be attached to any development approval. The conditions are listed below.
application details
Application No:	RAP22/0004
Street address:	30 Hilton Terrace Tewantin Qld 4565
Real property description:	Lot 53 RP 41223
Planning Scheme:	Noosa Plan 2020 (25 September 2020)
type of development
The applicant seeks the following type of referral agency response:
Concurrence Agency Response for Dwelling House
concurrence agency conditions
PLANNING
When Conditions must be Complied With
Unless otherwise stated, all conditions of this Decision Notice must be complied with prior to the use commencing, and then compliance maintained at all times while the use continues.
Approved Plans
Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions.
Plan No.	Rev	Plan/Document Name	Date
04	-	Site Plan, prepared by Christopher Design Group	21.07.22
05	-	Overall Site Layout, prepared by Christopher Design Group	21.07.22
06	-	Level 1 Floor Plan, prepared by Christopher Design Group	21.07.22
07	-	Level 2 Floor Plan, prepared by Christopher Design Group	21.07.22
08	-	Elevations One, prepared by Christopher Design Group	21.07.22
09	-	Elevations Two, prepared by Christopher Design Group	21.07.22
10	-	Elevations Three, prepared by Christopher Design Group	21.07.22
11	-	Elevations Four, prepared by Christopher Design Group	21.07.22

Development authorised by this approval must be undertaken generally in accordance with the Approved Plans listed within this Decision Notice. The Approved Plans must be amended to incorporate the amendments listed within this Decision Notice and resubmitted to Council for approval prior to the booking of a Pre-start meeting.
Side Boundaries
Any part of the garage within the 1.5m boundary clearance is not to be more than 4.5m in height and have a mean height of not more than 3.5m, above natural ground level.
Currency Period
This Concurrence Agency response is no longer valid if the use has not commenced within 4 years of the date of this notice, unless otherwise extended in writing by Council.
Performance Bond
Security in the form of a cash bond or trading bank guarantee to the sum of $5,000.00 must be submitted to Council, to secure performance of all conditions of this approval, prior to the issue of a Development Permit for Building Works. The cash bond or trading bank guarantee will be returned on performance of the conditions of approval less any costs incurred by Council in respect of enforcing performance of this permit. Council reserves the right to call upon the bond or guaranteed sum to effect compliance with conditions.
Building Height
The maximum height of the development must not exceed 8.6 metres above the natural ground surface in accordance with the approved plans.
Certification must be submitted to Council from a Licensed Surveyor which certifies that the building does not exceed the maximum height requirement of this Decision Notice.
Site Access and Driveways
A sealed access driveway must be provided from Hilton Terrace to all parking and manoeuvring areas of the development. The works must be undertaken in accordance with an Operational Works approval and must include in particular: a driveway crossover generally in accordance with:
Council standard drawings RS-049, RS-050 and respective addendums; and
RIENMAC Pty Ltd’s plan 21685-C2: “Driveway Plans, Driveway Cross-Overs”, Rev A, dated 3 May 2022.
Stormwater Drainage
The site must be provided with a stormwater drainage system connecting to a lawful point of discharge. The works must be undertaken generally in accordance with the recommendations of BAX Engineering’s Technical Memorandum 207-002-01: “Stormwater Management, 30 Hilton Terrace, Tewantin”, Rev A, dated 31 January 2022.
The works must be undertaken in accordance with a site specific Stormwater Management Plan (SWMP), prepared by a suitably qualified person.
The site specific SWMP must be approved as part of the subsequent Building Permit.
The site specific SWMP must be consistent with the site specific geotechnical report’s recommendations.
The stormwater drainage discharge from the development must be carried out in accordance with a professionally prepared engineering plan in compliance with the applicable standards and best engineering practices.
The development works must not cause additional ponding of water on any adjoining property (including the road reserve), or concentrate or direct overland flow to any adjoining property.
Private drainage structures must be wholly contained within the subject site.
Easements
Unless otherwise agreed in writing by the relevant service provider, any public or third party infrastructure located on the subject site must be placed within an easement registered against the title of the property.
All easements must be designed in accordance with the planning scheme and granted at no cost to the Grantee.  Where the Grantee is Council or a service authority, the easement documentation must be in accordance with the Grantee’s standard easement terms.  Draft easement documentation must be submitted to Council for endorsement.
All works must be kept clear of any existing or proposed easements on the subject land, unless agreed otherwise in writing by the Grantee.
Earthworks and Retaining Walls
All earthworks and associated foundations/footings, retaining structures/batters, both above and below ground level and both temporary and permanent, must be contained entirely within the subject site unless written permission from the respective landowner(s) is provided to Council. All earthworks must be undertaken in accordance with the provisions of Australian Standard AS3798: Guidelines on Earthworks for Commercial and Residential Developments.
Earthworks carried out on site must not affect the structural integrity of any of the adjoining lands and/or buildings and/or structures and/or services.
All retaining walls must be designed and constructed in accordance with the planning scheme and must be certified by an RPEQ where exceeding 1.0m in height.
Damage to Services and Assets
Any damage caused to existing services and assets as a result of the development works must be repaired at no cost to the asset owner at the following times:
where the damage would cause a hazard to pedestrian or vehicle safety, immediately; or
where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and assets must first be referred to the relevant service authority for approval.
reasons for inclusion of conditions
The proposal is subject to specific built form parameters outlined in The Noosa Plan.
Advisory notes
The following notes are included for guidance and information purposes only and do not form part of the referral agency conditions:
Infrastructure Charges
All developments and/or changes to existing developments may require payment of “Infrastructure Charges” (as applicable) in accordance with Council’s “Charges Resolution” made pursuant to the planning legislation and regulations current at the time of issue.
Sustainability
In line with Noosa Council’s Corporate Plan, Council seeks to encourage sustainable building design for residential and commercial development. Council encourages the use of sustainable building materials, energy efficient fittings, solar hot water, photovoltaic systems (including the use of inverter/charges), water saving devices and rainwater harvesting. For further information go to http://www.noosa.qld.gov.au/sustainable-homes
rEPRESENTATIONS ABOUT REFERRAL AGENCY RESPONSE
The applicant may make representations to Council about this referral agency response at any time before the application is decided pursuant to section 30 of the Development Assessment Rules.

Yours faithfully,

Georgina Schramm
Development Planner

Enc:	Approved Plans/Documents

[word/footer2.xml]
Page 2 of 1

[word/footer3.xml]
PO Box 141		P. (07) 5329 6500	[email protected]	
	TEWANTIN  QLD  4565	F. (07) 5329 6501	www.noosa.qld.gov.au
				Page 1 of 1

[word/header1.xml]
3
Log in to download the original file

Referral Agency Response - Planning RAP22 0004.docx · 125 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.