Council archive · source document
Decision Notice - 010.2007.00002291.001 [As Published] · 132007.2291
NOOSA COUNCIL IDAS Development Application Decision Notice 3 of 7
Noosa Council Conditions
INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION
1. Development undertaken in accordance with this approval must generally comply with the approved plans
of development. The approved plans are titled and numbered: Ground Floor Plan, SK100 revision A; First
Floor Plan, SK101 revision A; North & East Elevation, SK102 revision A; and South & West Elevation,
SK103 revision A prepared by Artech Property and dated 15 January 2008 and as may be amended by
these conditions and annotations on the plans.
2. The development must be undertaken and operated in a manner that causes no detrimental effect upon
the amenity of the neighbourhood by reason of the creation of excessive noise, lighting nuisance or other
emissions.
3. A rainwater storage tank with a minimum capacity of 5000 litres shall be provided on site to service the
detached house. The tank is to be installed to ensure water from the tank can be used both:
3.1. For external use such as watering gardens, irrigation, ornamental ponds or water features, topping
up swimming pools, outdoor cleaning; and
3.2. For use in flushing of toilets internal to the building.
4. All hot water systems installed shall be either solar systems; electric heat pump systems; or gas systems
(LPG or natural).
5. The building height shall not exceed 8.0 metres above natural ground level.
6. A verification survey of the building is to be carried out by a Licensed Surveyor and a certificate lodged
with Council at the completion of work confirming compliance with the maximum allowable building
height as required by either the conditions of the approval or the Planning Scheme.
7. A minimum of 20% of the site shall be retained as soft landscaping.
8. Security in the form of a cash bond or trading bank guarantee to the sum of $1,500 must be submitted, to
secure performance of all conditions of this approval, prior to the issue of a Development Permit for
building works. The cash bond or trading bank guarantee will be returned on performance of the
conditions of approval less any costs incurred by Council in respect of enforcing performance of this
permit.
9. Buildings and structures (including swimming pools, sheds, tennis courts or outbuildings) are not
constructed under overhead electricity transmission lines, or within any easements.
Demolition or Relocation of Existing Dwelling
10. Infrastructure including reticulated water, sewerage, stormwater, and electricity are to be protected from
damage and made safe to the standard required by the regulatory authority;
11. All infrastructure must be disconnected, capped or sealed including:-
electricity meters removed and electrical wires disconnected; and
telephone lines are disconnected; and
high speed data cables and television provider boxes are disconnected and removed to the
standard required by the regulatory authority;
12. All building materials containing asbestos, including asbestos cement sheeting or roofing and lagging,
must be removed from the building and disposed of in accordance with industry best practice.
MSOffice c:\docume~1\shesse\locals~1\temp\bcl technologies\easypdf 5\@bcl@1c0dc1c0\@[email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - 010.2007.00002291.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 31 KB (small file)
- File type