MPN CONSULTING PTY LTD (N) () .
STRUCTURAL AND CIVIL ENGINEERS consulting
Level 5,39 Sherwood Road, Toowong, Qid, 4066

P O Box 328, Toowong, Qld, 4066

Phone 61733354555

Email [email protected]
Web ~ www.mpnc.net.au

ABN 39.062 191799

File: 7700
18 July 2019

Noosa Shire Council
PO Box 141
TEWANTIN QLD 4565

Attention: Lisa Pienaar

Dear Lisa Pienaar

RE: | OUTSTANDING MATTERS NOTICE
36 & 40 HOFMANN DRIVE - NOOSAVILLE
LOT 6 &7 SP 264847
COUNCIL REFERENCE: MCU19/0017 & RAL19/0004

Please find enclosed a response to the Outstanding Matters Notice dated 2 July 2019 from Noosa
Shire Council Development Planner Lisa Pienaar for the proposed development at 36 & 40
Hoffmann Drive, Noosaville.

STORMWATER
Item 28 - PASS and ASS

The information response mentions that at the time of the geotechnical investigation, groundwater was
located more than 4 metres below surface level. It is unclear from the plans whether this is below the depth
that groundwater will need to be permanently lowered to, and therefore unable to determine whether the
permanent basement dewatering will impact on PASS.

Further to this, there is potential for over liming acidic water to have an impact on the way that the humic
acids form in the receiving environment. The humic acid cycle needs to be protected from the buffering
over liming could cause. This is critical to give the wallum froglets a competitive breeding advantage.

Further Information Required

Provide preliminary construction plans to indicate the complete depth of required excavations, and
indicate the depth permanent ongoing dewatering is proposed to.

Provide further justification for liming of acidic waters (that are not affected by Acid Sulfate Soils) and
demonstrate how such activities will not affect the humic acid cycle necessary for the wallum frog breeding
advantage.
Log in to download the original file

24-7-19 Attachment E - MPN consulting Response.pdf · 851 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 2 pages

Page 2

18 July 2019 (7 10 M consulting

Response

The concept bulk earthworks layout and section on MPN Plan DA.03 demonstrates the bulk
excavation for the proposed basement will be less than 4m in depth from existing surface level. As
no groundwater was observed during the geotechnical investigation, no permanent dewatering
measures are anticipated to be required as part of the development. On this basis, the application
of lime to the acidic soils as recommended in the Acid Sulfate Soils Investigation will not result in
impact to the wallum frogs through dewatering measures.

Item 31 & 32
There is inadequate information to assess and verify the validity of the input nodes to the MUSIC model to
achieve the stated water quality outcomes.

No information was provided to verify what the input parameters to the treatment nodes of the MUSIC
model should be and whether they were correct as tested under the SQUIDEP protocol.

The extensive information provided does not address:

e howthe proposed proprietary devices have been tested against the SQIDEP protocol,
e whether the pollutant reduction claims of the proposed proprietary devices relate to sites of
comparable size or rainfall patterns to the subject site.

Further, the information provided does not demonstrate that the suitably qualified and experienced
professional offering verification has a minimum of 10 years urban stormwater testing and modelling
experience with examples to demonstrate appropriate reputation and track record within the stormwater
industry to provide such independent advice confirming that the devices are tested and verified as per the
SQIDEP protocol.

Fi formation Required

Please provide the information requested within previous information request 31 & 32.

Where this information is provided - the person verifying the pollutant reduction capability of the
proprietary device must also include the input parameters to be included within the MUSIC treatment
nodes.

Where this information is unable to be provided - review the stormwater design to instead include a
traditional bioretention basin with filter media area sized to 2.2% of the contributing catchment (to meet
the Water by Design Deemed to Comply solutions), or provide a music model to verify filter media surface
areas that are smaller than the 2.2% catchment size.

Response

The stormwater design has been updated to include a bioretention basin for stormwater treatment
instead of proprietary treatment devices. The updated stormwater design is detailed in the
attached Stormwater Management Plan along with the accompanying MUSIC Model.

Excellence with Economy in Engineering 2

Page 3

18 July 2019 ION consulting

Should you require any further information on the above, please do not hesitate to contact the
undersigned.

Yours faithfully

Mhnoltc

Matthew Hendle

RPEQ 19730

For and on behalf of

MPN CONSULTING PTY LTD

mbhirr

Excellence with Economy in Engineering 3

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.