8.0 COMPLIANCE CERTIFICATION
For final building approvals, a compliance certificate may be required by the local authority to assess
that the relevant slope aspects of the development have been constructed in accordance with the
recommendations contained within this report.
In the event that a this certificate is required and as good practise in general, site inspections by STA
Consulting should be carried out at various stages of the development. This shall include, as a
minimum:

            1. Site preparation works prior to building construction. This may include inspection on
               topsoil stripping, cut and fill batters (temporary and/or permanent), drainage
               measures etc.. This inspection would enable the identification of areas of
               geotechnical concerns at the early stage of development.
            2. Work Completion. This inspection is expected to assess the compliance with the
               recommendations in this report and advise if further works are needed.
               Inspections pertaining to footings, slab, retaining walls etc.. should be carried out
               separately to the above inspections.

It should be noted, STA Consulting reserves the right to decline a request for a compliance inspection
and subsequent certification on the basis we have not undertaken staged site inspections as outlined
above.

9.0 CONCLUSION
In conclusion, it is our considered opinion, from a geotechnical viewpoint that the site is suitable for
the proposed residence that had been indicated by the client at the time of writing this report.
This recommendation is subject to the implementation of the measures specified within this report.

On site foundation inspections including footing, slab & retaining walls must be undertaken by a
suitably qualified and experienced Engineer.

Thank you for entrusting us with this work, if we can be of any further assistance in this matter,
please let us know.


For and on behalf of
STA Consulting Group Pty Ltd
                                                     Digitally signed by STA Consulting Engineers
                                                     DN: c=AU, st=Queensland, l=Brisbane, o=STA
                                                     Consulting Engineers, cn=STA Consulting
                                                     Engineers, [email protected]


Robin Cao BEng                                                       Justin J Williamson
MIEAust CPEng NPER RPEQ 12198                                        A.D. Civil Eng. Cert. Mining Eng
Log in to download the original file

Slope Stability Report.pdf · 6.6 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.