Skip to the record
Beware of cheap imitations.

Original source · versioned page text

20230025_Gympie Tce Hotel SWMP

of 34

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 3, section 1. The text section number identifies this passage in the reader.

Contents
Introduction..........................................................................................................................................5
Existing Site .........................................................................................................................................6
          2.1. Existing Site Description ...................................................................................................................... 6
          2.2. Existing Drainage Patterns .................................................................................................................. 6

Proposed Development ........................................................................................................................7
          3.1. Stormwater Concept ............................................................................................................................ 7
          3.2. Lawful Point of Discharge .................................................................................................................... 7

Flood Considerations ...........................................................................................................................8
          4.1. Noosa River .......................................................................................................................................... 8
          4.1. Tide Levels ........................................................................................................................................... 8

Stormwater Quality ..............................................................................................................................9
          5.1. Operational Stormwater Quality Management ................................................................................... 9
          5.2. Construction Stormwater Management ........................................................................................... 11

Stormwater Quantity ......................................................................................................................... 14
Conclusion ........................................................................................................................................ 15




Appendices

Appendix A
          Site Survey and Detail (Max Watterson + Associates)

Appendix B
          Proposed Development Floor Plan

Appendix C
          Catchment Plans
          Concept Drainage Plan

Appendix D
          Bioretention Checklist

Appendix E
          Atlan Basin Information




Project number 20230025
File 20230025_Gympie Tce Hotel SWMP, Revision 0              2023-05-31
                                                                                                                                             recorconsulting.com
P +61 7 5211 1003                                        A 75 Noosa Drive, Noosa Heads Qld 4567                                             E [email protected]
Log in to download the original file

20230025_Gympie Tce Hotel SWMP.pdf · 10.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.