Original source · versioned page text
Operational Management Plan - 51995.1611.04
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnEffective waste management is critical to maintaining hygiene, minimising
environmental impact, and reducing amenity concerns such as noise and odour for
neighbouring residents. Crackerjack has implemented a comprehensive waste
management system designed to address these obligations.
5.1 Waste Segregation
● Three-Bin System:
○ General Waste: Non-recyclable material.
○ Recycling: Glass, cardboard, plastics, and metals.
○ Organic Waste: Food scraps and compostable items.
● Bin Locations:
○ Strategically placed in staff-only areas including the kitchen, bar, and
service courtyard.
○ Clearly labelled signage provided to reduce risk of contamination between
waste streams.
5.2 Noise Minimisation
● Restricted Movement Times:
○ Bottle and bin disposal restricted to 7:00am–9:00pm.
○ No waste movements after 9pm to reduce late-night noise disturbance.
● Procedures:
○ Plastic liners used in bottle bins to reduce glass-on-glass noise.
○ Staff trained to wheel bins quietly, avoiding dragging across concrete
surfaces.
5.3 Collection Schedule
● Commercial Contractor:
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.