Original source · versioned page text
Operational Management Plan - 51995.1611.04
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn ○ Acoustic shielding and enclosures fitted where necessary.
○ Maintenance contracts to ensure all equipment operates efficiently and
quietly.
○ Quarterly noise audits of refrigeration units conducted by management.
1.2 Bin and Bottle Disposal
● Restricted Times: Bin movements and bottle disposal prohibited after 9pm.
● Procedures:
○ Staff to use plastic liners in bottle bins to reduce glass-on-glass impact.
○ Bins to be wheeled quietly, avoiding dragging or tipping near residential
areas.
● Collection:
○ Waste collection scheduled between 7am–6pm only.
○ Contractor briefed on noise minimisation expectations.
1.3 Staff Pack-Down Procedures
● Quiet Pack-Down Policy:
○ No amplified music during clean-up.
○ Staff to use low voices, with specific training on respect for neighbours.
○ All external doors and windows to remain closed during clean-up.
○ Closing duties near the eastern boundary minimised after 9pm.
● Accountability:
○ Duty Manager responsible for enforcing protocols.
○ Random spot checks carried out by senior staff.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.