Delegated Report - Code - Planning OPW19 0065 · OPW19/0065

of 1

Text shows just the words. Original shows the document exactly as it was published.

Author	Monkeith Kadhum
Development Assessment

APPLICATION DETAILS
Application No.	OPW19/0065
Applicant	Alan B Starkey
Proposal	Operational Works - Drainage Works, Stormwater
Properly Made Date	13 March 2019
Information Request Date	Not Required
Information Response Date	N/A
Decision Due Date	20 May 2019
Report Completed Date	13 May 2019
Number of Submissions	Not Applicable

PROPERTY DETAILS
Property Address	The Palms 706/61 Noosa Springs Dr Noosa Heads Qld 4567
RP Description	Lot 6 GTP 107028
Land Area	1650.0000 m²
Existing Use of Land	Vacant Site
PROPOSAL
The application seeks approval for Operational Works – Stormwater Drainage Works
site details
Background
Condition 5 of REC17/0013 requires stormwater drainage disposal from the site in accordance with an OPW approval. This application is to obtain the OPW approval.
Site Description

Locality Plan
assessment
Instruments for Statutory Assessment
Under the Planning Act 2016 the application must be assessed against each of the following statutory planning instruments to the extent they are relevant to the development:
State Planning Policy;
South East Queensland Regional Plan;
Planning Regulation 2017
The Noosa Plan.
The following codes from the Noosa Plan are applicable to this development:
Engineering Works Codes
conclusion & reasons for decision
The proposed development generally complies with the requirements of the planning scheme and does not raise any significant issues that cannot be addressed by reasonable and relevant conditions. The application is therefore recommended for approval.
The report is provided in accordance with Section 63(5) of the Planning Act 2016.
RECOMMENDATION
With regard to Application No OPW19/0065 for Operational Works - Drainage Works, Stormwater situated at The Palms 706/61 Noosa Springs Dr Noosa Heads Qld 4567 and described as Lot 6 GTP 107028, it is recommended the application be approved in accordance with the following details for the Decision Notice:
application details
Application No:	OPW19/0065
Street address:	The Palms 706/61 Noosa Springs Dr Noosa Heads Qld 4567
Real property description:	Lot 6 GTP 107028
Planning Scheme:	The Noosa Plan (8 June 2018)
Decision details
Council decided to issue the following type of approval:
Development Permit for Operational Works - Stormwater Drainage Works

CURRENCY PERIOD of approval
The currency period for this development approval is 2 years starting the day that this development approval takes effect.
assessment manager conditions
APPROVED PLANS
Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions.
Plan No.	Rev.	Plan/Document Name	Date
C6180/19/P01 Sheet 1/1	-	Drainage Layout Plan, prepared by Walsh Consulting Engineers	Feb 2019
PRIOR TO COMMENCEMENT OF WORKS
A condition report including internal photograph of the existing drainage manhole and the existing connection pipeline must be completed for agreement at the prestart meeting.
Certificates demonstrating currency of public liability insurance and works insurance covering the works must be submitted to Council prior to the prestart meeting.
Council must be contacted at least 5 working days prior to any works commencing to organise a prestart. The contact number to arrange a pre-start meeting is 5329 6245. The pre-start meeting must include the relevant parties for the following aspects of the works:
Civil engineering works;
Erosion and sediment control works;
Other relevant parties
A traffic management measures must be implemented and discussed with Council’s inspector at the prestart meeting and must specifically address the following:
Appropriate traffic signage in accordance with the Manual of Uniform Traffic Control Devices (MUTCD) to provide warning to drivers and road users of any safety hazard or changes to traffic conditions due to the proposed works.
Fencing to the work site during the construction phase as may be necessary to ensure the safety of the public and the road users.
Provision for safe pedestrian and traffic access across the frontage of the site both during daily construction and after daily construction has ceased.
Appropriate measures to minimising adverse impacts on traffic flows in the local roads
A Construction Management Plan or measures must be implemented and discussed at the pre-start meeting and must specifically address the following:
Maintenance and protection of water quality and existing drainage lines through the construction site through the implementation of appropriate erosion and sediment control measures with particular attention at preventing sediment export into nearby Lake Weyba waterways.
Measures to minimise adverse impacts on other properties including noise and dust emissions.
Establishment of a communication protocol with the adjoining owners to advise of construction times, impacts on traffic and services and other relevant issues.
identification of complaint management procedures including:
Contact details for the on-site manager.
Dispute resolution procedures.
Any conflict between the development and an existing or proposed service (eg sewer main and/or connection) must be referred to the relevant service authority for determination prior to commencement of works.
DURING CONSTRUCTION
The developer must meet any costs to repair damage to any Council and public asset during construction, where damage is a result of the development works. Damage to assets must be repaired immediately where it creates a hazard to the community. In circumstances where the damage does not create a hazard to the community, it must be repaired immediately on completion of the works associated with this permit.
All works must be supervised by a Registered Professional Engineer of Queensland (RPEQ) who is independent of the Developer and Principal Contractor, and they must certify that all works conform to the Operational Works permit. Where municipal works are involved, such confirmation must be submitted for the respective hold points prior to any site inspection by Council Officers.
All works must be constructed and work procedure undertaken in accordance with:
The approved plans/documents and conditions detailed in this Decision Notice
The relevant conditions of the higher order Reconfiguration of Lot approval Ref: REC17/0013 to which this approval relates.
All relevant Noosa Council Planning Scheme Policies, standard drawings, standard specifications and guidelines.
The latest version of the Healthy Waterways document “Water Sensitive Urban Design Technical Design Guidelines for South East Queensland” for all water quality devices to be constructed on site
Earthworks Batters
Any slope and batters shall be at a maximum grade of:
1 in 6 where in proximity to waterbodies
1 in 4 for grassed areas.
1 in 3 for planted areas
1 in 2 for combined structural engineering and planting solutions.
Stormwater Drainage
Appropriate scour protection must be provided at the outlet of all stormwater pipes including temporary outlets.
Works associated with this permit must not adversely impact on the existing drainage conditions on other properties (eg by blocking or interfering with natural overland flows).
Construction of all internal stormwater drainage works must comply with the relevant section/s of Australian Standard AS/NZS 3500.3.
Environment – Erosion and Sediment Control
Upon the completion of the works associated with this permit, all site surfaces must be effectively stabilised using methods which have achieved effective short-term stabilisation and which will continue to achieve effective stabilisation in the medium- to long-term. For the purpose of this condition, an effectively stabilised surface is defined as one that does not, or is not likely to result in visible evidence of soil loss caused by sheet, rill or gully erosion or lead to sedimentation, or lead to water contamination
Prescribed Water Contaminants (as defined in the Environmental Protection Act 1994) must not be released from the site or to waters within the site, or be likely to be released should rainfall occur, unless all reasonable and practicable measures are taken to prevent or minimise the release and concentration of contamination.
Erosion and sediment control measures must be installed and maintained to minimise erosion on the site and to minimise the export of sediment and associated pollutants from the site. The erosion and sediment control measures must be designed, installed and maintained in accordance with current best practice standards (refer to advisory notes).
Prior to the sealing of the plan of survey for the development, all site surfaces must be effectively stabilised using methods which have achieved effective short-term stabilisation and which will continue to achieve effective stabilisation in the medium to long-term (refer to advisory notes). For the purpose of this condition, an effectively stabilised surface is defined as one that does not, or is not likely to result in visible evidence of soil loss caused by sheet, rill or gully erosion or lead to sedimentation, or lead to water contamination.
Limit soil exposure on the site to a distance of no more than 2m beyond the extent of works shown on the approved plans except where the exposed soil is effectively stabilised without delay and prior to rainfall occurring.
FOLLOWING CONSTRUCTION AND PRIOR TO COUNCIL SIGNING THE PLAN OF SURVEY
Certification and Final Inspection
Upon completion of the work a certificate must be issued by an RPEQ certifying that the works have been constructed in accordance with the Operational Works permit.
A final inspection and approval of the new driveway and completed reinstatement works by Council’s Inspector is required.  Please contact Council on 5329 6245 to arrange for the inspection.
referral agencies
Not applicable.
Advisory notes
The following notes are included for guidance and information purposes only and do not form part of the assessment manager conditions:
General Advisory Notes
Council has undertaken an audit check of the Operational Works drawings in relations to the proposed works.  A detailed check of the calculations and drawings has not been undertaken, as they have been certified by a RPEQ.  The RPEQ bears full responsibility for all aspects of the engineering design.  Council reserves the right to require further amendments and/or additions at a later date should design errors become apparent.
Should any changes or modifications to the approved plans be required as a result of construction constraints, a “Request to change an existing approval” under the Planning Act 2016 must be made. Amended plans clearly indicating the changes must be lodged with this application along with the appropriate fees.
Prestart, On and Off Maintenance Inspections Request
Contact Council on 5329 6245 to arrange a prestart or an inspection giving a minimum of 5 business days notice of preferred inspection time.
It should be noted prior to arranging a pre-start meeting the Right of Appeal Period of 20 business days should have been passed or the applicant has have confirmed by a letter or an email that he/she has accepted the conditions of Decision Notice and waived his/her appeal right.
If Council officers are required to undertake additional inspections of the same works, a reinspection fee will be applicable in accordance with Council’s Fees and Charges register applicable at the time.
Environmental Advisory Notes
The Environmental Protection Act 1994 states that a person must not carry out any activity that causes, or is likely to cause, environmental harm unless the person takes all reasonable and practicable measures to prevent or minimise the harm. Environmental harm includes environmental nuisance. In this regard persons and entities, involved in the civil, earthworks, construction and landscaping phases of this development are to adhere to their ‘general environmental duty’ to minimise the risk of causing environmental harm.
Erosion and Sediment Control
Accepted best practice standards include:
the Sunshine Coast Regional Council Manual for Erosion and Sediment Control V1.2 or other superseding document subsequently adopted by Council;
Best Practice Erosion and Sediment Control, International Erosion Control Association (2008)
property notes
Not applicable.
VARIATION approval details
Not applicable.
further development permits required
Not applicable.
submissions
Not applicable.
RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the Planning Act 2016 is attached.
During the appeal period, you as the applicant may suspend your appeal period and make written representations to Council about the conditions contained within the development approval. If Council agrees or agrees in part with the representations, a negotiated decision notice will be issued. Only one negotiated decision notice may be given.
OTHER DETAILS
If you wish to obtain more information about the decision, electronic copies are available on line at www.noosa.qld.gov.au or at Council Offices.

[word/footer1.xml]
Page 7 of 7

[word/header1.xml]
3

[word/header2.xml]
DEVELOPMENT ASSESSMENT DELEGATED REPORT

[Attachment: image1.png (image text)]
    
  
 

   

61

Ne fecrps0r078

Used in these records

About this file

File size
406 KB (small file)
File type
DOCX

No other editions are linked here.

Original file

Log in to download the original file

Delegated Report - Code - Planning OPW19 0065.docx · 406 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.