Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

2016-11-14 General Committee Agenda

of 111

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (14.4 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                                                                                       8 NOVEMBER 2016


BRANCH ACTIVITIES                           RECENT ACHIEVEMENTS                          CURRENT PRIORITIES                           THE NEXT QUARTER

                                              10 Motion Tablets deployed to field         Seeking additional tablets for field
                                                crews.                                        crews
                                             Street Sweeping Level of Service
                                                reviewed in conjunction with the new
                                                contract
Identify Branch level actions within          LED street lighting proposals               Exploring emission reduction &             Participation in ZEN Action Team
Council's Carbon Reduction and Energy            submitted to ZEN Project Control             recycling opportunities through the          relating to the development of 5 year
Efficiency Plan including waste reduction        Group                                        road      resurfacing     programme          plan of works
                                                                                              including presentation to Councillors
Conduct a Branch Workforce Planning            Draft Workforce Plan prepared              Finalise Workforce Plan seek               Implement actions arising from the
Pilot project                                                                                 endorsement from Leadership Team             Workforce Plan

Management of Ringtail Quarry including        Successful    blasting    operations       Crushing blasted rock                      Renew Ringtail Quarry Site Based
associated   Stockpile  &     materials          conducted in July resulting in 15,000                                                     Management Plan.
Recycling Operations                             Blasted Cubic Metres of rock                                                            Risk training for relevant staff
                                               Auction of surplus materials netting                                                    Conduct an external business review
                                                 approx. $40,000 from sales                                                                of Ringtail Quarry operations
                                               Dedicated     Quarry      Supervisor
                                                 appointed on a temporary basis
                                                 pending business review.

Business as Usual activities                   New contracts in place for Mowing,         Refresh supply contracts for Quarry        Finalise discussions with SEQ Water
                                                 Road Resurfacing and Street                  Materials & Pre-mix Concrete                 regarding the tenure for the Noosa
                                                 Sweeping                                   Recruitment of Parks Technical               Botanic Gardens
                                               Maintenance of fire trails completed         Officer
                                                 in preparation for fire season             Tree management workshop with
                                                                                              Councillors
                                                                                            Tenders for Landscaping Contract



Infrastructure Planning & Design
Development of the Noosa Transport             Councillor workshop to identify and        Report to Council to adopt Transport       Councillor workshop to development
Strategy in conjunction with Strategic           confirm Transport Plan mission,              Policy.                                      of locality transport plans and
Planning                                         principles and outcomes                                                                   community engagement plan.




                                                                                                                                                            Page 96 of 111
Log in to download the original file

2016-11-14 General Committee Agenda(PDF, 14MB).pdf · 14.4 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.