SERVICES & ORGANISATION COMMITTEE MEETING AGENDA 8 NOVEMBER 2016
BRANCH ACTIVITIES RECENT ACHIEVEMENTS CURRENT PRIORITIES THE NEXT QUARTER
A draft reseal program to be
developed and presented to Council
Public Transport – electric bus trial Signing of lease agreement. Civil works infrastructure. Monitor programme and key hold
Livery design. points.
Engage designer for Noosa ‘look and
feel’ of the charging infrastructure.
Continue implementation of the mobility Continued roll-out within the Parks & Development of more detailed Pathway inspections to be
application across the organisation with Natural Areas crews. pathway inspection programmes to implemented in mobility and
greater than 50% implementation of Civil complement asset condition and supported with detailed reporting.
Operations (including Parks). insurance compliance.
Develop process to reduce the number of Completion of the majority of backlog Developing an in-house assessment Implement the assessment tool with
traffic related CRM’s not completed within traffic related CRM’s. tool to evaluate traffic requests. minimal backlog CRM’s going
timeframes. Complete all backlog CRM’s. forward.
Business as Usual activities Ben Lexcen Drive Stage 2 design Coastal directional signage review. Cooroy Noosa Road Stage 3, 2 and
complete. Hilton Terrace intersection and 1 design.
The following designs 90% complete: corridor upgrade design. Hilton Tce
o Rufous St civil works and Station Street, Pomona Bus Rural Directional Signage review.
landscaping Turnaround design. Noosa Parade Corridor upgrade
o Thomas St Noosaville stormwater Black Mountain Rd, Black Mountain consultation.
upgrade slip design.
o Cooroy Noosa Rd Tewantin Stage Noosa Pde corridor upgrade
4 consultation & design
The following designs completed Manufacture of Noosaville Foreshore
o Ben Lexcen Dr Stage 2 furniture prototype
o David Low Way Peregian Beach Noosaville Foreshore furniture
footpath upgrade redesign.
Page 98 of 111
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.