2016-11-14 General Committee Agenda

of 111

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (14.4 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                                                                                         8 NOVEMBER 2016


BRANCH ACTIVITIES                            RECENT ACHIEVEMENTS                          CURRENT PRIORITIES                            THE NEXT QUARTER

                                                                                             A draft reseal program to be
                                                                                               developed and presented to Council

Public Transport – electric bus trial           Signing of lease agreement.                Civil works infrastructure.                 Monitor programme and key hold
                                                                                             Livery design.                                points.
                                                                                             Engage designer for Noosa ‘look and
                                                                                               feel’ of the charging infrastructure.

Continue implementation of the mobility         Continued roll-out within the Parks &      Development of more detailed                Pathway     inspections      to    be
application across the organisation with          Natural Areas crews.                         pathway inspection programmes to              implemented     in    mobility    and
greater than 50% implementation of Civil                                                       complement asset condition and                supported with detailed reporting.
Operations (including Parks).                                                                  insurance compliance.

Develop process to reduce the number of         Completion of the majority of backlog      Developing an in-house assessment           Implement the assessment tool with
traffic related CRM’s not completed within        traffic related CRM’s.                       tool to evaluate traffic requests.            minimal backlog CRM’s going
timeframes.                                                                                  Complete all backlog CRM’s.                   forward.

Business as Usual activities                  Ben Lexcen Drive Stage 2 design              Coastal directional signage review.         Cooroy Noosa Road Stage 3, 2 and
                                                complete.                                    Hilton Terrace intersection and               1 design.
                                              The following designs 90% complete:            corridor upgrade design.                    Hilton Tce
                                                o Rufous St civil works and                  Station     Street,    Pomona     Bus       Rural Directional Signage review.
                                                  landscaping                                  Turnaround design.                          Noosa Parade Corridor upgrade
                                                o Thomas St Noosaville stormwater            Black Mountain Rd, Black Mountain             consultation.
                                                  upgrade                                      slip design.
                                                o Cooroy Noosa Rd Tewantin Stage             Noosa      Pde      corridor upgrade
                                                  4                                            consultation & design
                                              The following designs completed              Manufacture of Noosaville Foreshore
                                                o Ben Lexcen Dr Stage 2                        furniture prototype
                                                o David Low Way Peregian Beach               Noosaville      Foreshore    furniture
                                                  footpath upgrade                             redesign.
                                                                                          




                                                                                                                                                              Page 98 of 111
Log in to download the original file

2016-11-14 General Committee Agenda(PDF, 14MB).pdf · 14.4 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.