Original source · versioned page text
21-00902_Detailed_Landscape_Plans_Rev[F]
Original PDF page 1, section 1. The text section number identifies this passage in the reader.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnDETAILED LANDSCAPE DOCUMENTATION
65-67 ELANDA STREET, SUNSHINE BEACH Q
LANDSCAPE SPECIFICATION
NOTES
1.0 GENERAL 2.4 Compost and Fertiliser
Compost In mass planted areas: Place after the preparation of the planting bed but before planting and
1.1 Standards General: Provide well rotted vegetative material or animal manure, free from harmful chemicals,
other work.
§ Soils to comply with AS 4419-2003 - Soils for Landscaping and Garden Use. grass and weed growth as per AS 4454. In smaller areas (e.g. planter boxes): Place after the preparation of the planting bed, planting
and other work.
§ Compost, soil conditioners and mulches to comply with: to AS 4454. Fertiliser
Extent: To surrounds of plants planted in grass areas, provide mulch to a minimum of 600mm
§ AS 4970 - Protection of trees on development sites General: Apply Agriform or similar slow release tablets at the following rates. diameter. Keep organic and inorganic mulch not closer than 50mm from plant stems.
§ AS 4377 - Pruning of Amenity Trees Trees 4 Tablets. Shrubs 3 Tablets. Ground covers 1 Tablet. Add a handful of Dynamic Lifter Depths: Spread organic mulch to the nominated depth or a minimum depth of 100mm.
§ NATSPEC reference book: Specifying Trees - a guide to assessment of tree quality 2003 by and water in well each 4 weeks during the establishment period. Fertilize turf areas with
Dynamic Lifter at the rate of 250 grams per 5 m2.
Ross Clark 6.0 PLANT SUPPORT
2.0 SITE AND SOIL 3.0 PLANTS 6.1 Stakes and Ties
2.1 Preparation Stakes
CONTEXT MAP
3.1 General
Weed eradication Requirement: Generally, plants of good quality should be self-supporting, however stake plants REFERENCE SCALE
General: Provide plants with the following characteristics: located in open ground or adjacent to vehicular traffic or as directed to mark their location or
Herbicide: Eradicate weeds using environmentally acceptable methods, such as a non-residual provide additional protection.Material: Hardwood, straight, free from knots or twists, pointed at
§ Large healthy root systems, with no evidence of root curl, restriction or damage.
glyphosate herbicide in any of its registered formulae, at the recommended maximum rate. one end.
§ Vigorous, well established, free from disease and pests, of good form consistent with the
Manual removal of weed undergrowth: Regularly remove, by hand, rubbish and weed growth species or variety. Installation: Drive stakes into the ground for at least a fifth of their length, avoiding damage to
throughout grassed, planted and mulched areas. Remove weed growth from an area 750mm
diameter around the base of the trees in grassed areas. Continue eradication throughout the § Hardened off, not soft or forced, and suitable for planting in the natural climatic conditions
prevailing at the site.
the root system. Place stake at a clear distance of 50mm from the edge of the rootball.
Plants 2.5m high: Three 50x50x2400mm stakes per plant.
DRAWING REGISTER
course of the works and during the planting establishment period.
Vegetative spoil Supply: Supply plants that are propagated in a nursery facility that have been accredited by the Plants 1.0 - 2.5m high: Two 40x40x1800mm stakes/ plant. Drawing No. Drawing Title Issue
Nursery Industry Association of Australia Plants 1.0m high: One 30x30x1200mm stake per plant.
Remove vegetative spoil from site. Do not burn.
Replacement: Replace damaged or failed plants with plants of the same type and size. 21-00902-CS01 COVER SHEET F
Site topsoil Ties
Remove Strip topsoil from known areas of construction and stockpile in an appropriate area so 3.2 Plant Containers and Stock Sizes General: Provide hessian or equivalent non-abrasive ties fixed securely to the stakes, 21-00902-LP01 LANDSCAPE LAYOUT PLAN F
that drainage and construction is not restricted. Make sure that the soil cannot flow out of the preferably one tie at no more than one-third of the main stem, others as necessary to stabilise
General: Supply plants in weed free containers of the required size. the plant. 21-00902-LP02 GROUND FLOOR PLANTING PLAN F
site in a storm situation and infiltrate the storm water system. Erect silt barriers to protect S/W
system. 21-00902-LP03 ROOFTOP LANDSCAPE PLAN F
4.0 PLANTING 7.0 IRRIGATION
2.2 Subsoil 21-00902-LP04 TYPICAL LANDSCAPE DETAILS F
Cultivation
4.1 General 7.1 General
Individual tree stock in grassed areas and planting in beds: Excavate a hole to at least twice the 21-00902-LP05 PLANTING SCHEDULES F
Cultivation depth to existing subgrade: 150mm unless specified otherwise. Install automatic irrigation to all common areas, and individual tap computers to private
diameter of the rootball and at least 1.5 times deeper than the rootball. Break up the base of
Cultivation depth to garden areas: 300mm unless specified otherwise. courtyards where applicable. Water to be pump fed from on site rain-water tanks connected to
the hole to a further depth of 100mm, and loosen compacted sides of the hole to prevent
down-pipes and storm-water system.
Cultivation depth to turf and grass areas: 100mm unless specified otherwise. confinement of root growth.
Services and roots: Do not disturb services. Keep clear of tree roots in drip zone. Cultivate by 4.2 Watering LANDSCAPING CALCULATIONS
hand if necessary.
Requirement: Thoroughly water the plants before planting, immediately after planting, and as 8.0 COMPLETION
2.3 Topsoil required to maintain growth rates free of stress. SITE AREA GROUND FLOOR LANDSCAPING
Source Watering basins for plants in grass: Except in irrigated grassed areas and normally moist areas 8.1 Planting Establishment
General: Import topsoil unless the topsoil type can be provided from material recovered from
and impervious subsurface strata, construct a watering basin around the base of each
Establishment Period
1020m2 423m2 41%
individual plant, consisting of a raised ring of soil capable.
the site. Commencement: The planting establishment period commences at the date of practical
Placing topsoil 4.3 Placing completion inspection. Unless nominated differently continues for a minimum period of 12
General: Spread the topsoil on the prepared subsoil and grade evenly, making the necessary Remove the plant from the container with minimum disturbance to the rootball. Ensure that the weeks or until satisfactory handover, whichever is greater.
TOTAL HARD SOFT
allowances to permit the following: rootball is moist and place it in its final position, in the centre of the hole and plumb, and with Existing planting and grass
the topsoil level of the plant rootball level with the finished surface of the surrounding soil. LANDSCAPING LANDSCAPING LANDSCAPING
§ Achieve required finished levels and contours after light compaction. Where existing grass or planting is within the landscape contract area, maintain it as for the
§ Finished surface levels of grassed areas to be flush with adjacent hard surfaces such as 4.4 Fertilising corresponding classifications of new grass or planting. 168m2 255m2
kerbs, paths and mowing strips. In planting beds and individual plantings, place fertiliser pellets around the plants at the time of Recurrent works 423m2
planting. 39.7% 60.3%
Finished surface levels of mulched areas to be 25mm below adjacent pathways, kerb or the Throughout the planting establishment period, carry out maintenance work including watering,
like. 54.5 Backfilling mowing, weeding, rubbish removal, fertilising, pest and disease control, reseeding, returfing,
Consolidation staking and tying, replanting, cultivating, pruning, hedge clipping, aerating, reinstatement of
Backfill with topsoil mixture. Lightly tamp and water to eliminate air pockets. Ensure that mulch, renovating, top dressing, and keeping the site neat and tidy.
PERMANANT POWER POLE PP
SEWER LINE
PROPOSED BELOW GROUND
DETENTION TANKS
Compact lightly and uniformly in 150mm loose layers. Avoid differential subsidence and topsoil is not placed over the top of the rootball, so that the plant stem remains the same height METERBOX
RETAINING WALL 89°56'36"
PROPERTY BOUNDARY 33.544M | 89° 56' 36"
excess compaction. Produce a finished topsoil surface that has the following characteristics: above ground as it was in the container. Replacements RL 43440
UP
RL 43440
ENTRY PATH DP DP
GAS BOTTLE
179°58'36"
UP
GATE INFILTRATION /
SOAKAGE TRENCH.
ENTRY ALFRESCO
Continue to replace failed, damaged or stolen plants. Replacement plants are to match the
WATERMETER RL 43290 REFER CIVIL DETAILS
§ Finish to design levels. RUMPUS
PROPERTY BOUNDARY 15.091M | 359° 59' 36"
POOLS WITH FRAMELESS
WORKBENCH
H1 GLASS POOL FENCES TO
5.0 MULCHING
1:8
HANDWASH COMPLY WITH QDC
species and sizes outlined in the approved planting schedule. Plant densities to match the
MP3.4 AND AS1926
GARAGE
§ Smooth and free from stones or lumps of soil.
359°59'36"
190mm STEP POOL
RL 43470 BATH
approved planting plans at the time of handover. BED
STREET
LIFT AC
5.1 General
ROBE POOL
§ Graded to drain freely, without ponding or concentration of flows to catchment points.
1:8 1:6 1:4 1:6 PUMP
POOL
PROPERTY BOUNDARY 15.091M | 179° 58' 36"
Grassed areas PUMP SEWER
ROBE
CONNECTION
AC POINT
LIFT
INFILTRATION /
BED
§ Graded evenly into adjoining ground surfaces.
SOAKAGE TRENCH.
General: Organic Mulch shall be free from stones, soil, clay, dust, weeds, seeds, roots, sticks,
BATH REFER CIVIL DETAILS
190mm POOL
Commence grass maintenance works at the completion of sowing, hydroseeding and turfing.
GARAGE STEP
RL 43470
SEWER MH SL41.8
§ Ready for planting. rubbish, vermin, insects, pests, fungus, disease and other deleterious material. It shall be free Maintain healthy weed free growth. Grass coverage must achieve at least 80% at the time of
KERB, CHANNEL AND
FOOTPATH TO CIVIL ENG'S
DETAILS
H2
RUMPUS
ALFRESCO
from matter toxic to plant growth. practical completion and 100% at the time of handover.
GAS BOTTLE
HANDWASH
WORKBENCH
GATE
UP
SEW
ER
LIN
E
Topsoil depths GATEHOUSE
ENTRY PATH
44690
UP
D
WORKBENCH
UP
SEWER
CONNECTION
179°58'36"
ELANDA
HANDWASH GATE POINT
ATE ARK
Type: Mulch shall be Natramulch or Hoop Pine Fines N
SIG R
P RL 43290 ALFRESCO 3.138
GRATE DRAIN TO HYDRAULIC DETAILS
DE ITO
Planting areas generally: As specified otherwise 300mm.
RUMPUS
VIS INFILTRATION /
H3 SOAKAGE TRENCH.
REFER CIVIL DETAILS
5.2 Organic Mulch Installation
RL 43290
GARAGE
359°59'36"
POOL
Grassed areas generally: As specified otherwise 150mm. BATH
BED
29' 29"
LIFT AC
| 197°
ROBE POOL
Tree pits: As specified otherwise 800mm. General: Place mulch to the required depth, clear of plant stems, and rake to an even surface 1:10 1:6 1:8
PUMP
93M
POOL
RY 13.5
ROBE PUMP
AC
NDA
LIFT
flush with the surrounding finished levels. Spread mulch to the specified thickness so that after
TY BOU
BED
BATH
Podium and containterized planters: As specified otherwise, 1000mm for small trees, 600mm
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.