Council archive · source document
SUPERSEDED - Decision Notice - Concurrence Agency - QT (Maritime Safety Queensland) [As Published] · 142008.383
2008/383 Page 11 of 15 [OCR of page images] 2008/383 Concurrence Agency Response EPA Permit number: _IPCC01117608 21. All organically enriched sand removed from the top layer (topsoil) within the proposed development areas must be stockpiled separately prior to excavation, and respread over the development area after re- profiling as part of the revegetation works. . 22. Allareas of exposed sand are to be stabilised against wind erosion during the construction period. 23. Al material excavated from a dunal system for construction works must be placed, ievelled and stabilised against wind erosion on the seaward side of the building or structure. 24. Any erosion or loss of sand surrounding the works that occurs because of changes caused by the works must be rectified. 25. Immediately following construction of the works: «The dunal areas are to be re-profiled to achieve the natural profile of the system; « Disturbed areas are to be stabilised against wind erosion and rainwater run-off erosion and revegetated through the re-establishment of the endemic native plants common to the site; « - The revegetated area is to be fenced off where necessary to prevent pedestrian access across the area; and « Riparian vegetation is to be re-instated adjacent to the access jetty where existing vegetation is disturbed ang.where existing pump infrastructure is removed. 26. The drainage of process overflow waters and stormwater associated with the sand shifter pumping station must not cause erosion of the dune or beach system. Site Access 27. Access to the permanent pumping station site shall be along the designated vehicle access track, and the surrounding dunal vegetation must be maintained to the satisfaction of the Environmental Protection Agency. oe, eee en Coastal Management 28. The sand shifting activity and/or associated activities must not cause any long-term maintenance and management implications Erosion Prone Areas and Coastal Hazards 29. The Sunshine Coast Regional Council shall be responsible for the removal of the works, if in the opinion > of the Environmental, Protection Agency, the works causes unacceptable adverse effects or suffers the effects of erosion to the extent that it becomes a danger to the public. 30. Should the sand shifting facility and associated infrastructure be damaged as a result of sea erosion the Sunshine Coast Regional Council shall be responsible for the removal of all debris from the beach. 31. In the event of damage or loss by of the works by sea erosion, the Sunshine Coast Regional Council must submit another application if reconstruction of the works is proposed. 32. Awritten undertaking from the Sunshine Coast Regional Council is to be received by the Environmental Protection Agency agreeing that the works will be considered to be an expendable structure and that no protection works, other than beach nourishment will be carried out in the event of an erosion threat. Page 5 of 7 . Environmental Protection Agency Page 11 of 15
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERSEDED - Decision Notice - Concurrence Agency - QT (Maritime Safety Queensland) [As Published]Related documentApplication case desk ↗
About this file
- File size
- 494 KB (small file)
- File type
No other editions are linked here.