NOOSA COUNCIL IDAS Development Application Decision Notice                                                  7 of 11


       41.4. Erosion & Sediment Control
42.    A suitably qualified Registered Professional Engineer shall prepare engineering drawings and
       specifications for all engineering works that will become Council infrastructure, which shall be submitted in
       conjunction with an application for a Development Permit for Operational Works. In this regard a
       DXF/DWG file on GDA94 zone 56 grid of the proposed cadastre layout is to be submitted in conjunction
       with any application for Operational Works.

43.    Digital detailed designs including drawings, calculations, etc shall be submitted with any application for a
       Development Permit for Operational Works in respect of roadworks and stormwater drainage works. The
       design shall be in accordance with Council’s Planning Scheme Policy PSP05 – Engineering Design
       Standards – Roads, Drainage and Earthworks. To avoid conflict with underground pipes or services, all
       existing and proposed services required by the development shall be shown on the plans.

44.    Any damage caused to any public utility during the course of construction shall be repaired to Council’s
       standards and at no cost to Council.

45.    Any alteration of any public utility or other facilities necessitated by the development of the land or
       associated construction works external to the site shall be at no cost to Council.

46.    The transportation of all materials to and from the site shall be undertaken in a manner such that no
       particle matter escapes onto a public road. All vehicles carrying materials either to or from the site shall
       be covered to prevent materials including dust being windblown from the vehicle.
Environmental Health
47.    The developer must provide waste storage and disposal facilities in accordance with Planning Scheme
       Policy “Waste Management Multi-Dwellings and Commercial and Industrial Premises”, including an
       external imperviously paved area correctly sized for all refuse and recycling containers and suitably
       screened from public places and neighbouring properties.

48.    The developer must ensure there is a safe and suitable kerbside bin pick up location, or must provide a
       safe and suitable onsite collection. NB the refuse vehicle must be able to enter and leave the site in a
       forward direction without any dangerous maneuvers.

49.    A bin wash area is required with a cold-water tap, hose and drain outlet connected to sewer, via a bucket
       trap. The drain outlet is to be designed to prevent storm water entry to the sewerage system and this can
       be achieved with a nib wall 50mm high and up to 700mm x 700mm wide (max 0.5m²), or alternatively the
       waste area can be roofed, or any other design approved by Council.

50.    Noise emission from mechanical equipment (air conditioners, refrigeration equipment or pool pumps etc)
       shall comply with the following requirements:

       50.1. The equipment shall be installed and located in a manner that prevents excessive noise in
             accordance with Council’s Local Law No. 12 - Control of Nuisances. Infringement Notices (on-the-
             spot fines) may apply for offences.

       50.2. A person must not use equipment on any day if it makes or causes noise to be made:

              50.2.1.    From 10pm to 7am: More than the lower of either –
                               40 dB(A)
                               3 dB(A) above the background noise level
              50.2.2.    From 7am to 7pm: More than the lower of either –
                               50 dB(A)
                               5 dB(A) above the background noise level
              50.2.3.    From 7pm to 10pm: More than 3 dB(A) above the background noise level.

              50.2.4.    Pool pumps must not be audible at an effected premises between 10pm-7am

       50.3. Submission of written certification from a suitably qualified person confirming that the noise levels
             comply when measured at either the residential boundary or outside the most exposed part of an
             affected building, whichever is the closest to the equipment. This is required immediately after
             installation of the equipment and prior to any occupation of the building, and in a format approved
             by Council. This assessment must take into account noise from all fixed equipment on the property
             e.g. swimming pool pump, heating equipment, that may increase the overall noise level emitted.



MSOffice c:\docume~1\shesse\locals~1\temp\bcl technologies\easypdf 5\@bcl@d40326fc\@[email protected]

Used in these records

About this file

File size
52 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - 010.2007.00001447.001 [As Published].pdf · 52 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.