Skip to the record
The only place to find full transcripts.

Original source · versioned page text

2018-07-10 P&E Agenda Attachment 1 to Item 8 - Draft Noosa River Plan

of 68

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (11.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Noosa River Community Jury
The Jury recommended Council take on




                                                         T
management of anchoring, mooring and
living on the river on the basis it would




                                                       F
be a ‘user pays’ system funded through
alternative means to rates.




                                                     A
In    addition,  detailed     operational
recommendations were also provided which
include:




             R
•	Implement a role with authority on the
   river around compliance and monitoring.                Living on the river




           D
•	Remove abandoned, unattended,                          The Department of Transport and Main Roads has
   unauthorised, derelict and unsafe vessels              issued a number of long-term and casual approvals
   to an impound area in the river for                    for people to live on the Noosa River, either
   auction.                                               temporarily, intermittently or permanently.
•	Review anchoring and mooring locations                 Vessels used to live on board are either at anchor
   and types of moorings.                                 or moored, and there is no fee associated with
•	Determine a cap and locations for live on              these approvals.
   boards.                                                The Transport Infrastructure (Waterways
• Review fees for mooring and anchoring.                  Management) Regulation outlines the legislative
                                                          provisions for living on board. These provisions
•	Undertake effective monitoring and                     restrict vessels being used for living on the
   facilitation of waste tank effluent                    river (whether temporarily, intermittently or
   removal and disposal from vessels.                     permanently) from remaining in the river for more
•	Implement lighting and marker options                  than 48 hours, unless the living on board is in
   for boats (and beacons) for safety                     accordance with the State approval.
   reasons.                                              As a ‘condition of use’ the vessel used to live on
                                                         board must have the appropriate waste holding
                                                         system on board. Occupants must ensure waste
                                                         is not discharged to the river, ensure that a fixed
or mobile pump-out facility is used to empty the contents of the waste holding system and keep written
records of each discharge while the vessel remains in the river.
Council regularly receives complaints from the general public and other river users that people discharge
waste to the river. The Noosa River and adjoining lakes is a nil discharge area for treated and untreated
sewage. These provisions are set out in the waterways management and marine pollution legislation.


                                                                                   Noosa River Plan l Page 23
Log in to download the original file

2018-07-10 P&E Agenda Attachment 1 to Item 8 - Draft Noosa River Plan(PDF, 11MB).pdf · 11.3 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.