Skip to the record
Beware of cheap imitations.

Original source · versioned page text

2018-07-10 P&E Agenda Attachment 1 to Item 8 - Draft Noosa River Plan

of 68

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (11.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                                     A F T
          D R
Bring Back the Fish
This project consists of three elements:
1.	An assessment, undertaken by the University of Queensland, of current baseline environment conditions
    against which the success of restoration efforts can be measured. It includes assessing the links
    between school prawns and the prevailing environmental conditions, a current full stock assessment
    and recommendations for enhancing or restocking prawns in the Noosa lakes and estuary.
2.	Direct restoration of lost oyster reef habitat in the Noosa estuary, undertaken by the University of
    the Sunshine Coast. It includes construction of artificial reefs and monitoring of results; and improved
    understanding of how the restored oyster reefs secure fish diversity, biomass and connectivity in the
    system.
3.	A parallel project involved an assessment, undertaken by Noosa and District Landcare and Healthy Land
    and Water, of erosion prone areas in the Kin Kin Creek sub catchment to determine current sediment
    inputs to waterways. It identifies priority areas for riparian restoration. The objective of this work is to
    reduce the overall sediment load in the system that currently hinders the growth of oyster reefs and
    seagrass beds, which provide habitat for fish and prawns.
The long term outcome sought by Bring Back the Fish is a considered balance between marine biodiversity
recovery and sustainable recreational and commercial fishing.
The project is led by the Noosa Biosphere Reserve Foundation with financial support from Noosa Parks
Association, Noosa Council, Thomas Foundation, the University of the Sunshine Coast, Noosa and District
Landcare and Noosa Integrated Catchment Association.



                                                                                    Noosa River Plan l Page 31
Log in to download the original file

2018-07-10 P&E Agenda Attachment 1 to Item 8 - Draft Noosa River Plan(PDF, 11MB).pdf · 11.3 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.