Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

2018-07-10 P&E Agenda Attachment 1 to Item 8 - Draft Noosa River Plan

of 68

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (11.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Objective 9: The quality of water running off urban areas is improved.

Management response                                                           Who            When

Ensure inclusion of environmental considerations in new and renewal           Council        Ongoing
capital projects and the asset management program.

Ensure capital works projects include stormwater quality improvement          Council        Ongoing
devices, including litter nets, to reduce any pollution of waterways.

Continue to require, regulate and ensure compliance of stormwater             Council        Ongoing
management systems and water sensitive urban design in private
development.

Continue to conduct risk-based annual inspections to monitor compliance       Council        Ongoing




                                                      T
of ERA licensed industrial operations.




                                                    F
Conduct risk-based annual inspections of non-EA licensed industrial           Council        Ongoing
operations to monitor activities.




                                                  A
Develop and implement a proactive education, behaviour change and             Council,       Medium
compliance program to increase community awareness of the impact of           Community      term




          R
specific practices which pollute waterways (e.g. erosion & sediment control   stakeholders
on construction sites, roof painting, pool backwashing and car washes).




        D
                                                                               Noosa River Plan l Page 39
Log in to download the original file

2018-07-10 P&E Agenda Attachment 1 to Item 8 - Draft Noosa River Plan(PDF, 11MB).pdf · 11.3 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.