Skip to the record
Search everything, all in one place.

Original source · versioned page text

2018-07-10 P&E Agenda Attachment 1 to Item 8 - Draft Noosa River Plan

of 68

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (11.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                                      In Noosa, the Hincksia blooms ‘worsen’ with
                                                      north-easterly winds and are ‘cleared’ from Main
                                                      Beach by south-easterly winds. From 2002 to
                                                      2006, and again in 2017, nuisance blooms of
                                                      Hincksia in Laguna Bay significantly impacted
                                                      the local economy and residents and visitors’
                                                      enjoyment of Noosa’s Main Beach.
                                                      Previous studies and trials aimed at finding the
                                                      source of Hincksia and removing the vast biomass
                                                      of a Hincksia bloom from Laguna Bay proved
                                                      inconclusive.
                                                      Research has recognised macroalgal blooms (such
                                                      as Hincksia) are a ‘symptom’ of increasing nutrient
                                                      loading into aquatic environments which has been




                                                    T
                                                      demonstrated by the disappearance of blooms in
                                                      a number of estuarine bays in the USA and the




                                                  F
                                                      UK following the reduction in nutrient input into
                                                      these systems (Phillips, 2006).




                                                A
                                                      The findings from this research suggest the source
                                                      of nutrients fuelling the bloom at Noosa must be




          R
                                                      identified and management strategies developed
                                                      to reduce nutrient inputs (Phillips, 2006).




        D
Objective 15: The occurrence of coastal algal blooms in Laguna Bay is mitigated and/or reduced.

Management response

Devise a management strategy in conjunction with macroalgal
biology & ecology experts to seek to further understand, manage
and potentially reduce Hincksia sordida blooms.
                                                                     Who

                                                                     Council
                                                                                     When

                                                                                     Short – medium
                                                                                     term




                                                                               Noosa River Plan l Page 55
Log in to download the original file

2018-07-10 P&E Agenda Attachment 1 to Item 8 - Draft Noosa River Plan(PDF, 11MB).pdf · 11.3 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.