Original source · versioned page text
2018-07-10 P&E Agenda Attachment 1 to Item 8 - Draft Noosa River Plan
The original of this document is very large (11.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnManagement theme: Rural and urban runoff (and other pollution sources)
18 Develop and implement Council, New initiative Medium Best management
a targeted extension and Natural term practices in rural areas
education program for rural Resource ensure sediment loads
landholders in important Management and other contaminants to
rural sub catchments. groups, waterways are reduced..
Community
stakeholders
19 Continue to explore, Council, New initiative Ongoing Key erosion hot spots
partner and invest in Natural remediated. Sediment
projects and initiatives Resource loads to waterways are
that seek to improve and Management reduced. Riparian areas
T
remediate erosion hot groups, are protected to stabilise
spots and rehabilitate Community banks, maintain habitats
riparian areas. Example: stakeholders and ecological function.
F
Keep It In Kin Kin partner
project.
A
20 Investigate the potential Council New initiative Medium Sediment runoff to
R
of unsealed rural roads term waterways from unsealed
in important rural sub- rural roads is quantified
catchments contributing to better inform future
D
sediment-laden runoff to management.
waterways when it rains.
21 Ensure inclusion Council Existing Ongoing Stormwater quality
of environmental program improvement
considerations in upgrade infrastructures are
and renewal capital works maintained over life
projects and the asset cycle of asset to ensure
management program. treatment efficiencies are
maintained.
22 Ensure capital works Council Existing Ongoing Capital works are well
projects include program managed and do not add
stormwater quality pollution to waterways.
improvement devices, such
as litter nets, to reduce any
pollution of waterways.
23 Continue to require, Council Existing Ongoing Private developments
regulate and ensure program effectively manage inputs
compliance of stormwater into the stormwater
management systems system.
and water sensitive
urban design in private
development.
Noosa River Plan l Page 61
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.