Original source · versioned page text
11 Mimosa Street plans showing exisitng original cross-over
Attached to the e-mail Operational Works Application OPW21/0026 - 11 Mimosa St, Peregian Beach.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn‘Adoo jeujbuo sajouep sjeyiul sioyny eng
‘ubiseg Buipling elemnooy fo uoissiuued uayu jNOYY Led ul 40 AyoyM psidoo ag Oo} Jou ale sued esays WybUAdOD @
ipaubls
ued ons
7004S
Lifeiy _| Seep aN JpIMgreyLED,
002: -eeog
Teg
UOIsIAeY ||
doumoyagy /ubiseq
of ‘Aq umeig || 60/LLOZ-ci-S1ONES Joe Buimesg
210¢/¢/91-91€¢ ||
Areujuiyeld /enss} |
yog uelbalad JS eso (LL) per 7 :SSe4ppYy
S1e][AS P :AOJ SUOISUBJXZ pesodo/g
Page 1 of 10
EXIST. UPPER FLOOR PLAN
n
O| 2
=| 3
=| §
ei) &
Q
S| 28
wy | 25
a) te
D/eS
Qe
Tila
O/ 68
o) ss
PAGE 3
z
<
sl
Qo
& 3
eS: 8
®@ 2Oa gs
9 gs5 &
s O32 zt
ROL ee
@ HeoHxS
OG, S29%
agesoeR
WSLE BIS
CR aragk
RSalwko
e4ssequ
LUHAIGHA
ee 4
POHOONBAR
Ly Gy iy Lu uy by tay
OOQOOOG
LET TES
SITE DETAILS
LOT 434 (11)
SUNSHINE COAST REGIONAL COUNCIL
ON RP 434P93147
PARISH OF MARCH
COUNTY OF WEYBA
LOCAL AUTHORITY:
SITE AREA 818.00 M2
APPROVED
JBAgroup
BUILDING DESIGN
Ee io
Ce le) RC ee
41
«Vole Ss
www.accuratebuildingdesign.com
ROLE TAM ae MET A
E [email protected] M 0408 000450
200
SITE PLAN 1
\
PROPOSED ENCLOSING
UNDER EXIST.DWELLING
00.M2)
LOT 434 (11)
(818
cD
Z
_
_
é :
ao ~ Oo. -
_ _
_ \ i _
ia
6
_ J o.
= §- -
_
o
_
/
SITE CLASSIFICATION-W41 N3 ZONE 2
SITE COVERAGE 19.19%
TERMITE PROTECTION SLABS:
An approved monolithic slab with termimesh to penetrations.
Termimesh perimetre treatment,concrete slab constructed
to AS2870. Or an alternative termite protection method
may be used as nominated by the builder.
MASONARY WALLS:
Termite system to be inspected and maintained by competent
persons, as advised by installers or every 12 months whichever
fs the lesser. Builder to discuss menthods of termite control with
owner/client and provide advice to ensure that the owner
Stormwater 90 dia.pvc 100mm min.cover 1 in 100 min.fall.
1 X Downpipe per 12m of gutter, reduce by 1m for each
Builder/surveyor to confirm all offset dimensions
are correct prior to set out.
Notice of termite protection method to be fixed to the
understands their obligations in maintaining the barrier.
Stee! DPC/Barrier under supported walls or framing.
building in a prominent location.
DURABLE NOTICES:
All topsoil with significant organic matter
is fo be stripped (75mm nominal) from
building area prior to construction.
Surface Drainage away from Dwelling.
Builder to ensure there is adequate
Builder to check location of all
underground services before
any excavation commences.
INSPECTION:
Naa gutter.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 9 pages
Page 2
‘Adoo jeujbuo sajouep sjeyiul sioyny eng ‘ubiseg Buipling eleinsoy jo uolssiuled Ua_UM jNoUYM Yed ul 40 ApouM paides ag of Jou are sued esau jYybUAdOD @
paubg) “UPI FOOLY PUNDIDISIXT 6 . . 2 Z © gk
DOLL ag, U9G UPIBalad ‘}g eSOU (LL) PET ‘SSa4pPY |S | ee
Lively _|SeePAN JepiIngHeyved [0/898 | oN ra neo 5
‘7eq uoisiney || doumoyagy /ubiseq : . Qa Eee) g
| of “Aq umeig || 60/2 40%-el-SION8S Jey Buimeiq SAeT]IS AN -AOJ SUOISUB}XF pasodoid $ G 3 Peta E
[ ZL02/2/9 1-218 ] [ AleujuiyOld :ONss} | a a ey 3 3 : . cS
wl 28 Ce ee |
RAS g Sones Ki
PAR EMTS
PN Sets
Paes Be
4 8 oar
aLvenoov
0226
Oz Z 00r ¢
099 & 099 €
|
gz) Oe £ 1 # S
in
N =
AS | q oa
| | | =
o i I |
S| | <
| po <
ae i & & ; a.
| | i
S| ee S
So
; | pO 5
| gy | |
wo ze | ~l
| é } | ue
B B 6 i I! | ‘9
s & § | i < a
ZEa | f | 2 4 =
wo :
¢ | f | $ 5
<e) I Ks)
. a E . °o
| ! |
o | I | oX
3 i i
© | {| |
sO | | ra
! | ! ©
ee ° H 4 =
| ! | =
x | f | he
3 i | Y
g : i mew,
| i ><
fen gn nn} yo ge WW
2
2 2
8 | | 3
N N
i 5 4 L
OcG é 002 9
0cl6
n ay
£ &
§ 8
BS
8
2
ira
>
Ss
§ @
> «
£ =
&
g 2g
Page 3
MAST
co NV Ss TRUC TIO N NO TE. S “ « » Denotes hardwired smoke alarm = a, g 3
a _———e——eEeE———————eeeeeeeees q QQ <
ay 2
Note #1:- Proposed Enclosing under Existing 2 Storey Dwelling. . . A 6/2 & Y.
Note #2:- Proposed Ext. Walls are kept back off existing support posts as shown. Provide Lift-Off Hing es to Bath door. 3 § g
Note #3:- Builder to confirm ail dimensions on site prior to construction. B\s g
Note #4:- AS Approved External Cladding to be confirmed by client. Wet Areas to comply with BCA Part 3.8.1. Sal)
Note #5:- Builder fo insert a Raking Ceiling in Living and part Bed 2 as shown | 8
due to Verandah above. Builder to ensure correct construction SMOKE ALARM DEVICES M UST NOT BE: = . . 3
and use appropriate flashings to prevent water ingress. (Refer to Detail) Water proofing to be in accordance 5 g
Note #6:- Typically 90mm P10 or P12 T2 Treated Pine Framing required. with AS 3740-2004, ge
Note #7:- Provide 2550H Ceiling in Living/Bath/Bed 1/Bed 2. & &
Note #8:- Provide 2400H Ceiling in Bed 3/Ens./Cpd.
Note #9:- Bulkheads in rooms as per Existing Bearer locations.
Smoke Alarms to comply with
AS3786-2014
Proposed Ground Floor Plan
D
&
5
a
(Photoelectric Alarms Dec 2016) g 3
= 3 5
§)/2)'2
§/s/9
ie
6 uy
2|8 gs |g
5 780 a -
901.300 ‘| 1400 2720 90 ° 3 <=
2 3 UP S ©
8 B 8 Q
8 i = Poa 18 c
Lup i. 8 &
= 8 Hn Dd
| J—4. fs ge
g Bar Bed 1 — = ©
> wi 7 3.8 g 4
2, Z MONTE ist Bearer Exist. Bearer A ° ” ~
i | 5 : =o
—1 i °
i | 820D 820D 2 . &
3 gs i Robe oe a ° x
S l » Smoke 1 000, St > & 8 fe} °
® —_ 8200 J. Storage 3 Exist.Carport s % ~
|| Patio _ we 4d) Ss) 8 ” &
_ ie
o 8, g Living o N71 630 © =
S so N Exist.Bearer Store Exist.Bearer 8 . 9° —
+ ee i 21-18SD ” =
i j =
| ° ee
' I oS
Patio | + 2 St
| Ff x 3
kK
pe le . i al Ww
s & OM.
8 w
2 840 2 ”
— 2000—> 5 780 S §
7 780 os
a x
© 1
Elevation
Directions
a
~
So
Page 30
AREAS M2 «Vole Ss
Proposed Ground Floor 71.10 m2
Proposed Patio 19.18 m2
TOTALAREA __90.28 m2 PROPOSED GROUND FLOOR PLAN 1:100
Ee io
Cle) Ee ee aS
ROLE TAM ae MET A
E [email protected] M 0408 000450
www.accuratebuildingdesign.com
ACCURATE
Blue Authors initials denotes original copy.
© Copyright: These plans are not to be copied wholly or in part without written permission of Accurate Building Design.
Page 4
SMOKE ALARM DEVICES MUST NOT BE:
WITHIN 300 MILLIMETRES OF A LIGHT
AREAS M2
Existing Upper Floor 108.73 m2
Exist. Verandah 47.07 m2
Exist. Rear Landing 1.20 m2
TOTAL AREA 157.00 m2
10 900
2
>
o
~
x
N
o
2
8
ro)
a
oS
oD
=
©
16 500
70| 960/70
IS BIS
iD
1 875 ‘|Z 3025
6 460
704 900
10-18W
elle
Kitchen
06-18W
16 500 5
EXISTING UPPER FLOOR PLAN 1:100
Note:-Builder to update Smoke Alarms N aS .
Salas) |
Qs >
Denotes hardwired smoke alarm é 3 2.
~h—_sencesnamnes & |S
Smoke Alarms to comply with aig
AS3786-2014
(Photoelectric Alarms Dec 2016)
Certifier/Builder Updates
Revision
Existing Upper Floor Plan
Drawing Ref: Sellers-P-201 7/09
| Issue: Preliminary
Design: ABD/Owner
Sheet:
3 S
ae mM
c
&
: oP
~* coc =
= ©
° o
sf Qs
GZ 9
2 8 = 6
) 638
S = §
“ Qo =
cs
a oa
Zz a Ho =
=) -
: 25
wW
3 &
Hn
gf
o 8
qa <
ae
~
oS
Page 40)
NATE
- “Bui DING DESIGN
wd
Cle) Ee ee aS
ROLE TAM ae MET A
E [email protected] M 0408 000450
www.accuratebuildingdesign.com
ACCURATE
Blue Authors initials denotes original copy.
© Copyright: These plans are not to be copied wholly or in part without written permission of Accurate Building Design.
Page 5
Proposed Enclosing
under existing
2 Storey Dwelling
Block Retaining
to Engineer Design
& Specification.
EXISTING DWELLING
Fibrecement or similar
Cladding fixed in
lance with manufacturers
S.
_ Ext
Min. 2:
Ceiling
uilder to ensure there
adequate drainage
from dwelling.
Wall
& Specification.
SS ~~ Sealed Block,
t
SIDE ELEVATION #3
Select Fibrecement or simila
External Cladding fixed in
accordance with
Specifications.
EXISTING DWELLING
NO
Ceiling
Select Fibrecement or similar
External Cladding fixed in
accordance with manufacturers
specifications,
Aluminium glazed windows
Sealed Block R and doors to BCA Part 3.6.
to Engineer Design & a Rein.Block Retaining Wail
to Engineer Design & Specification.
SIDE ELEVATION #4
[arr]
EXISTING DWELLING
oer Aluminium Glazed
FRONT ELEVATION #1 “isinsnsi.
to BCA Part 3.6.
EXISTIN
DWELLING
ae
‘Aluminium glazed windows
WAN UN ANAS
REAR ELEVATION #2 and doors to BCA Part 3.6.
ACCURATE
Sa /8s| |
38] 8
sa) [5
rg
sé
ce 35 &
< Min.2400 H a 3
Ceiling ~ 3 8 Wy
Ey 8
ie
sek 8
B |S 1a 2
2a) a a}
&
©
ia}
°
&
>
YS
coc =
= ©
oa
OM «a
S i)
,
5 8
- §
Qo =
cs
Qa
—
Om
cN
oy
~
x oS
gd
3 4
Hn
o 2
Q235
o 3
qa <
Page 5 of 10
NATE
- “Bui DING DESIGN
wd
Ee io
Cle) Ee ee aS
ROLE TAM ae MET A
E [email protected] M 0408 000450
www.accuratebuildingdesign.com
Blue Authors initials denotes original copy.
© Copyright: These plans are not to be copied wholly or in part without written permission of Accurate Building Design.
Page 6
e
=), 88) |s
> & D
qa &
SLAB DETAILS CONCRETOR NOTE:- MIN.200mm CONCRETE REINFORCED BLOCK WALLS eres
THICKENING BEAM/FOOTING REQUIRED Se] |g
: , UNDER ALL BRACING WALLS TO AS 3700 REQUIREMENTS g 2] |S
100mm R.C, 20 Mpa slab vibrated and reinforced als s
with 1 layer of slab mesh situated on bar chairs == &
and founded on visqueen or simifar lapped 200mm 8
and taped with pressure sensitive tape and laid | a
over 50mm min.compacted bedding sand. g 3 s
Refer to engineers specifications. || > 3s 3
S]eal js
Se) | gs
SiH nw
2 | |2
2 3/.| 4
SISi\s
| 3||S
£146
IMPORTANT NOTES: = | [S
This plan to be read in conjunction with = £ a
floor plan. Builder fo confirm dimensions & ols
prior to construction. Plumbing fixture SS ay
positions and dimensions provided are B/S |e Ie
to be determined by builder or licensed (4) |S) |S oO
plumbing contractor. Denotes Existing 75 X 75 SHS Stee! Posts and Footings.
S
Denotes Sealed Rein.Block Retaining Wall fea]
Refer to Engineer Design & Specifications. c
5 780 2 840 c
S 1.400 901 2 —
S <1 480 5 Hn d
_ = = = 7A! . @&
Ke zie = a= = os +
S = &
8 | | SINK Qa
S|, || o
% ii | | =
” ody so”
%
| sy
. Y
or : 2 £e
! { ! 100mm Thick Reinforced concrete slab s £
° 4 i ' to engineer detail. Main floor 300mm Qo =
x & 1 : 1 above platform. 3 < =
> § | , 3 S
in.30mm || EXISTING ® =
pl Away || CARPORT Om
3 S ft mm Dwelling | SLAB ° Pan
SS ne ! Sy
o © iH ! t | x 4
Bo | 3 )
ii |e 4 ‘i jp a WW ~
if ‘ 100m Thick Reinforded concrete slab | | | anvh al ~!
| : to efigineer detail. Main floor 300mm | || i Min.30mm | 2 Oo ua
a : above platform. |! 7 _ FallAway || vr 7.)
i : y ' | |, | from Dwelling |, | N ®
jb : = 4 | ih a" w w”
: : } . i 2 oo
S 25
“ o° 3
Denotes Rein.Block Retaining Wall “ —— 2000 5 780 2 840 a =
Refer to Engineer Design & Specifications, | Nn Denotes Existing Block Retaining Wall
Page 6 of 10
NATE
- “Bui DING DESIGN
Ee io
Cle) Ee ee aS
ROLE TAM ae MET A
E [email protected] M 0408 000450
www.accuratebuildingdesign.com
SLAB SET-OUT PLAN 1:100
* PLEASE NOTE.- ANY CHANGES TO OR SUBSTITUTION OF STRUCTURAL MEMBERS OTHER THAN BY A CERTIFIED ENGINEER, WILL VOID ACCURATE
BUILDING DESIGN OF ANY RESPONSIBILITY FOR THE STRUCTURAL INTEGRITY AND PERFORMANCE OF THIS BUILDING DESIGN.
ACCURATE
Blue Authors initials denotes original copy.
© Copyright: These plans are not to be copied wholly or in part without written permission of Accurate Building Design.
Page 7
|| Is
S| |.
aalas| [2
MEMBER SCHEDULE W41N (N3) PLY BRACING FRAMING SCHEDULE N3 W41 Ss) ig 8
ere| |g
1 es &
MEMBER SIZE TIE-DOWN PB 6-4 KWM dmm STRUCTURAL PLYWOOD, EXT & INT NON-LOADBEARING 2.5H | T2 TREATED PINE FRAMING Saf |.
FIXED TO FRAME WITH 30 X 2.8 GALV. STUDS X 35 MGP 10/12 @ 450 CTR ==! |} | s
L1 LINTEL 90 X 35 P12 T2 M12 TIE-DOWN ROD AS PER AS1684.2 CLOUTS. 150 CTRS TO TOP & BOTTOM TOP PLATE Box ce MEP In © 490 TRS 83
L2 LINTEL 140 X 35 P12 T2 M12 TIE-DOWN ROD AS PER AS1684.2 PLATES & TO EDGES AND AT 300 CTRS BOTTOM PLATE 90 X 35 MGP 12 sa a
13 LINTEL 190 X 35 P12 T2 M12 TIE-DOWN ROD AS PER AS1664.2 TO INTERMEDIATE STUDS. PROVIDE M12 RIBBON PLATE 90 X 45 MGP 12 33) (3
CYCLONE RODS FULL HEIGHT TO EACH o/s} |
END OF BRACING SHEET. CYCLONE RODS JAMB STUDS <2550H 90mm REFER TO LINTEL LAYOUT Sea | B
MAX. 1200 CTRS GENERALLY. Frame Sheet Roof su =
NN
EXISTING CROSS BRACES ARE TO BE REMOVED 90.X 35 MGP12 (A) a £
AND REPLACED WITH BRACING WALLS. 2/90 X 36 MGPTO @) a /3|(8 5
BUILDER TO CONNECT LOWER FLOOR TO TIE-DOWN TO W41 (N3) AND £86 2
EXISTING FLOOR SYSTEM AND TIE-DOWN NEW £88 —
LOWER FRAMING TO W41N3 AND AS 1684.2 REQUIREMENTS. AS 1684.2 REQUIREMENTS Bag
i LS| |S is
NOTE:- ALL FRAMES ARE NON-LOADBEARING 288 a
(ENCLOSING UNDER EXISTING DWELLING)
CYCLONE ROD/TIE-DOWN DETAIL
S
<
&
Min.45mm Solid Blocking Exist. Upper Floor ” D>
WH o eo
TyT eee ‘N = ®
1.0 PB LT (A) 1.0 PB ‘oO a.
= fy oO
3 a7,
SS
| 90 X 45 MGP12 = a
Underbatten M12 Cyclone Rod vw
Oo 8
~—
: 90 X 35 P12 T2 Non-Loadbearing “ &
| Lower Floor Frame ° =
! Oo ~
| ; 3
Ow
| y cN
I ®
| | 2 wo >
| et 2 * y
| shee - =a}! S WW |
| 0.5PB L2(B) 05*B res} § UM .,
| | = + ®o
| 2 | Q | nH a
| a & | EF gs of
1 “| is 1 © assy Q ws
Lo oe ete = ee BPO | Wy Zaq oD
= === EF (By 06813 (By = = = = gag Q SB
OSS
wes qa <
Gace
Page 7 of 10
DIRECTION A
PROVIDED 53.76 KN + NOM.
REQUIRED 49.50 KN. & CCURATE,
- “Bui DING DESIGN
LOWER FRAMING LAYOUT 1:100 ;
* PLEASE NOTE.- ANY CHANGES TO OR SUBSTITUTION OF STRUCTURAL MEMBERS OTHER THAN BY A CERTIFIED ENGINEER, WILL VOID ACCURATE
BUILDING DESIGN OF ANY RESPONSIBILITY FOR THE STRUCTURAL INTEGRITY AND PERFORMANCE OF THIS BUILDING DESIGN.
Cle) Ee ee aS
ROLE TAM ae MET A
E [email protected] M 0408 000450
www.accuratebuildingdesign.com
ACCURATE
Blue Authors initials denotes original copy.
© Copyright: These plans are not to be copied wholly or in part without written permission of Accurate Building Design.
Page 8
SAFE DESIGN AND BUILDING OF STRUCTURES 1. FALLS, SLIPS, TRIPS. (A) WORKING AT HEIGHTS DURING CONSTRUCTION Wherever possible, components of this building should be prefabricated off site or at ground level to minimize the risk of workers falling more than two meters. However, construction of this building will require workers to be working where a fall in excess of two metres is possible and injury is likely to result from such a fall. The builder shall provide a suitable barrier wherever a person is required to work in a situation where falling more than two metres is a possibility. Site/Task Risk assessment and safe work method statements are to be carried out in accordance with the Workplace Health & Safety Act and Workcover and the Construction Work Code of Practice. DURING OPERATION OR MAINTENANCE For houses or other Low-rise buildings where scaffolding is appropriate: Cleaning & Maintenance of windows, walls,roof or other components of this building will require persons to be situated where a fall from height in excess of two metres is possible. Where this type of activity is required, scaffolding, ladders or trestles should be used in accordance with the relevant codes of practice, regulations and legislation. Task Risk assessment and safe work method statements are to be carried out in accordance with the Workplace Health & Safety Act and Workcover requirements. For houses or other Low-rise buildings where scaffolding ladders, and trestles are not appropriate: Cleaning and maintenance of windows, walls, roof or other components of this building will require persons to be situated where a fail from a height in excess of two metres is possible. Where this type of activity is required, scaffolding, fall barriers or Personal Protective Equipment (PPE) should be used in accordance with the relevant Codes of Practice, Workplace health & Safety Regulations & Workcover Legisiation. (B) SLIPPERY OR UNEVEN SURFACES FLOOR FINISHES Floor finishes noted on these drawings are only finish types for the purpose of conducting an energy rating assessmem. The owner is responsibie for the selection of the surface finishes in the pedestrian trafficable areas of this Building. Surfaces should be selected in accordance with AS HB 197:1999 and AS/NZ 4586:2004 STEPS, LOOSE OBJECTS AND UNEVEN SURFACES Where Steps/and or Ramps are included in the building which may be a hazard to workers carrying objects or otherwise occupied. Steps should be clearly marked with both visual and tactile warning during construction, maintenance, demolition and at all times the building operates as a workplace. Building owners and occupiers should monitor the pedestrian access ways and in particular access to areas where maintenance is routinely carried out to ensure that surfaces have not moved or cracked, so that they become uneven and present a trip hazard. Spills, loose material, stray objects or other material that may cause a slip or trip hazard should be cleaned or removed from access ways. Alf contractors and workers are expected to maintain a tidy work site during construction, maintenance or demolition to reduce the risks of trips and falls in the workplace. Materials for construction or maintenance should be stored in designated areas away from access ways and work areas. 2. FALLING OBJECTS LOOSE MATERIAL OR SMALL OBJECTS Construction, Maintenance or Demolition work on or around this building is likely to involve persons working above ground level or above floor levels. Where this occurs one or more of the following measures should be applied to avoid objects falling from the area where the work is being carried out onto persons below. 1/ Prevent or restrict access to areas below where the work is being carried out. 2/ Provide toeboards to scaffolding or work platforms. 3/ Provide a protective structure below the work area. 4/ Ensure that all persons below the work are have the appropriate Personal Protective Equipment. BUILDING COMPONENTS During construction, renovation or demolition of this building, parts of the structure including fabricated steelwork, heavy panels, engineered timber products or roof trusses and many other components wiff remain standing prior to or after supporting parts are in place. Contractors should ensure that temporary bracing and other required support is in place at ail times as the possible collapse may injure persons in the work area. Refer to Engineer or manufacturers recommendations if required. Mechanical Lifting of Materials and components during construction, maintenance or demolition presents a risk of falling objects. Contractors should ensure the appropriate lifting devices are used, that loads are properly secured and that access fo areas below the load is prevented or restricted. 3. TRAFFIC MANAGEMENT For buliding on a major road, a narrow road or steeply sloping road:- Parking of vehicles or loading/unloading of vehicles on this roadway may cause a traffic hazard. During construction, maintenance or demolition of this building designated parking areas for workers and loading areas should be provided. Trained traffic managment personnel should be responsible for the supervision of these areas. For a Building where on-site loading/unloading is restricted:- Construction of this building will require loading and unfoading of materials on the roadway. Deliveries should be well planned to avoid congestion of loading areas, and trained traffic management personnel should be used to supervise loading/unloading. For aff Buildings:- Busy construction and demolition sites present a risk of colfisian where deliveries and other traffic are moving within the site. A traffic management plan supervised by trained traffic management personnel may need to be implemented for the work site. 4.SERVICES Rupture of services during excavation or other activity creates a variety of risks, including the possible release of hazardous material. Existing services are to be located on or around this site. Where known these are identified on the plans, but the exact location and extent of services may vary from that indicated. In locations with underground power, power lines must be disconnected or carefully located and adequate warning signs used prior to any construction, maintenance or demolition commencing. Services should be located using the appropriate service (such as Dial Before You Dig) appropriate excavation practice should be used and, where necessary, specialist contractors should be used. Where overhead power lines are on or near this site they pose a risk of efectrocution if struck or approached by lifting devices or other plant and person working above ground level. Where there is a danger of this occurring, power lines should be, where practical, disconnected or relocated. Where this is not practical adequate warning in the form of bright coloured tape or signage should be used or a protective barrier provided. 5. MANUAL. TASKS Components within this design with a mass in excess of 25kg should be lifted by two or more workers or by a mechanical lifting device. Where this is not practical suppliers or fabricators should be required to limit the component mass. All material packaging, building and maintenance components should clearly show the total mass of packages and where practical ail items should be stored on site in a way which minimizes bending before lifting. Advice should be provided on safe lifting methods in all areas where lifting may occur. Construction, maintenance and demolition of this building wilf require the use of portable tools and equipment. These should be fully maintained in accordance with the manufacturers specifications and not used where faulty or (in the case of electrical equipment) not carrying a current electrical safety tag. All safety guards or devices should be regularly checked and Personal Protective Equipment should be used in accordance with manufacturers specification. 6. HAZARDOUS SUBSTANCES Powered Material Many materials used in the construction of this building can cause harm if inhaled in powdered form. Persons working on or in the building during construction, operational maintenance or demolition should ensure good ventilation and wear Personal Protective Equipment including protection against inhalation of harmful material when sanding,drifing, cutting or otherwise disturbing or creating powdered material. Treated Timber The design of this building includes provision for the inclusion of treated timber within the structure. Dust or fumes from this material can be harmful. Persons working on or in the building during construction, operational maintenance or demolition should ensure good ventilation and wear Personal Protective Equipment including protection against inhalation of harmful material when sanding, drilling, cutting or using treated timber in any way that may cause harmful material to be released. Do not burn Treated Timber. Volatile Organic Compounds Many types of glue, solvents, spray packs, paints, varnishes and some cleaning materials and disinfectants have dangerous emissions. Areas where these are used should be kept well ventilated while the material is being used and for a period after installation. Personal Protective Equipment may also be required. The manufacturers recommendations for use must be carefully considered at all times. Synthetic Mineral Fibre Fibreglass, rockwool, ceramic and other material used for thermal or sound installation may contain synthetic mineral fibre which may be harmful if inhaled or if if comes in contact with the skin, eyes or other sensitive parts of the body. Personal Protective Equipment incfuding protection against inhalation of harmful material should be used when installing, removing or working near bulk insulation material. Timber Floors Areas where finishes are applied should be kept well ventilated during sanding and application and for a period after installation. Personal Protective Equipment may also be required. The manufacturers recommendations for use must be carefully considered at ail times. 7, CONFINED SPACES Excavation Construction of this building and some maintenance on the building may require excavation and installation of items within excavations. Where practical, installation should be carried out using methods which do not require workers to enter the excavation. Where this is not practical, adequate support for the excavated area should be provided to prevent collapse. Warning signs and barriers to prevent accidental or unauthorized access to alf excavations should be provided. 7. CONFINED SPACES CONT. Enclosed Spaces Where workers are required to enter enciosed spaces, air testing equipment and Persoani Protective Equipment should be provided. Small Spaces Where small spaces within this building require access by construction or maintenance workers provide warning signs and barriers to unauthorized access, These should be maintained throughout the life of the building. Where workers are required to enter small spaces they should be scheduled so that access is for short periods. manual Lifting and other manual activity should be restricted in small spaces. 8. PUBLIC ACCESS Public access to construction and demolition sites and to areas under maintenance causes risk to workers and the public. Warning signs and secure barriers to unauthorized access should be provided. The perimeter fence must be adequate and be of a suitable height to deter entry, eg:1800H and be constructed from dedicated materials and be difficult to climb. Be difficult to gain access underneath the gates and joints in the fence and should be secure and not present a weak point for entry. In case of emergency, builders must ensure signs are clearly visible form outside the site, stating the names and contact telephone numbers of the person in control of the building work. Where electrical installation, excavations, plant or loose materials are present they should be secured when not fully supervised. 9. OPERATIONAL USE OF BUILDINGS (For Residential Buildings) This building has been designed as a residential building. if at a later date it is used, or intended to be used as a workplace, the provisions of the Workplace Health & Safety Act 2017 or subsequent replacement Act should be applied for the new use. 10. OTHER HIGH RISK ACTIVITY All electrical work should be carried out in accordance with the Code of Practice: Managing Electrical Risks at the Workplace, AS/NZ 3012 and ail licensing requirements. All work using Plant should be carried out in accordance with the Code of Practice: Managing Risks of Plant in the workplace. All work should be carried out in accordance with the code of practice: Managing Noise and preventing Hearing Loss at work. Due to the potential risks involved in Steelwork and Concrete placement particular care fs to be exercised. The principal contractor is to implement and monitor Workpiace Health & Safety, Safe Work Method Statements, and Risk Assessments. All workers are to comply with the Relevant Code of Practice and Australian Standards and in General the Code of Practice: Managing Risks in Construction Work. (Work Place Health & Safety Act 2011.) Sa /8s| | B§| | Ba) 5 3 & sg 3 alg 5 Sigs | 2 Se 6 so) 18 e5/ | a/§|/g q 286/S/e glsiss 8 Bi Siig 2 2a) a a) <= © Q c & D Y 9 oc f= = © oa OM ws so” ., %& 638 = § oO = cs Oo ma~ aT Om cN Oo + Ad x 3 We 3 & Hn Qo 2 235 o 3 qa < Page 8 of 10 «Vole Ss Jason ACCURATE | atta Ses, aN eEE tik ® Drafting. ea ingdes: ING DESIGN a Cle) Ee ee aS ROLE TAM ae MET A E [email protected] M 0408 000450 Pa ACA ele Blue Authors initials denotes original copy. © Copyright: These plans are not to be copied wholly or in part without written permission of Accurate Building Design.
Page 9
BS
N ols -.
GENERAL NOTES =a [88] fs
eSeCHb
All work is to comply with the Building Act 1991. Standard Building S 2 8 2.
Regulations 1993. Building Code of Australia, and alf relevant 3/3 g
Australian Standards, a & & Ss
Timber work is to comply with AS 1684. a — eS b
All dimensions and details to be checked on site prior to construction. uy | . zg
Bracing & Timber Sizes nominated to be checked/certified by an Engineer. Exist. Po é
Footing Detail and Slab Design to be checked/provided by Engineer. 2400H gs a
Tie-Down and bracing to W41N (N3) and AS Requirements. Ceiling o g s 2
Alf contractors to carry out work in accord with Workplace = - a 2 & ® oS
Health and Safety Requirements. Ve I. L I VI n g K, I tc h e n = 9 <
Smoke Alarms to AS 3786. ” Si 2
Termite Control to comply with AS 3660 and BCA Part Q 3.1.3.1. DETAIL A Provide Flashing Rafter tie-down to a g
Alf External timbers to be Durability class hwd or H3 Treated and and Fibrecement moet AS 1684.2 g)i8 3
or suitably protected against the weather in accordance with 140 X 45 H3 Treated Cladding to prevent Requirements, 75H3 Tr d = 3)|§ 3
manufacturers recommendations. Roof Beam. water ingress. reate §)/2/ 0
Floor Tiling to be carried out in accordance with AS 3958.1 Ceramic Tiles. . L Transfer Block. i §/s/9
All concrete work to be carried out in accordance with AS 2870-1996 Existing 240 X 75 F14 xy eX ie
(Residential Slabs & Footings construction.) AS 3600-2001 _ Roof Beam. — / aly 190mm Rein. Coneret MBs se:
(Concrete Structures.) Builder to insert Mini-orb Roofing WI — Existing Wf Existing 7omm Plasterboard Céiling I Block Wall to A83700. 3 a 3 $
Waterproofing to be in accordance with AS 3740-2004 to completely seal between Exist. 70 X 35 P1272 Bearer Bearer i F 2g 18 a
- an . . ion 2550H & Engineer Design & =]
(Waterprooting of wet areas within residential buildings.) Verandah & Bed 2. Fix Roofing Rafters at 600 Cirs. 440 Cyclone rods Ceiling Specifications.
Aluminium & Timber Doors & Window sizes, Swing & Hinge Movements to Beams on sheet ridges with rofer in bracin e "
are fo be confirmed with the clients/builder prior to manufacture. Builder to Gal.or Stainless Steel Roof Screws. 90 X 35 P12 T2 schedule ig &
ensure installation is in accordance with External eo
manufacturers details & specifications. Colorbond Sheet Roofing Framing STO R E B ed 1 Reinforced Concrete a
Builder to ensure the use appropriate fixings due to close proximity to the fixed in accordance with Slab and footings to
beach. manufacturers specifications. Reinforced Concrete q Engineer design and <
. | . Slab and footings to Specification.
EXTERNAL TIMBER APPLICATION NOTE:- Physical termite Barrier Engineer design and a
as per AS 3660. n Specification. ”
Note:- All Timber used in an external above ground +t - ane NS
application, and members directly exposed to the weather | ikl = | o
are to be painted and sealed to AS1684.2 requirements before TLL | TE ee b lle Ful nd
it is installed, including all cuts, notches and driff holes to minimize el leslie eles A TESTE —
the ingress of moisture and further once sealed a ‘malthoid' or similar Ce 7 E i a
cover strip be applied to all top edges of deck joists/bearers and or beams. Pll feallEal Fal i < i Palle 7
All above ground external timbers to be Min. Durability Class 1 or 2 Hwd “ETE Ee ea Lee ”
or CCA H3 Treated. Alternatively these members can be painted and fully TE Tales TEE es Tee “IE =
covered with Fibrecement sheet cladding. Where Engineered Timber
Products are used in H3 LOSP application please refer to the uy
manufacturers Guide for installation considerations & recommendations.
SECTION A:A 1:60
Address: L434 (11) Mimosa St. Pereg
S
~—
- ”
4 £
m 4 Exist. °
2400H 4 —
Ceiling Ww
Bed 5 Bed 4 S
Ver. e ¢
= Ww
i ®
- a
L 90X35P12T2 | 2400H X 10mm Plasterboard Ceiling 1 Note:- All members directly exposed to the weather °
External Ceiling ioc, are to be painted and Min.H3 Treated, or alternatively Q.
yclone rod: .
Framing refer to bracing members can be H2 Treated/painted and fully covered °
schedule au with Fibrecement sheet cladding. a
P a ti oO Bed 3 a th 190mm Rein.Concrete
50mm Sand bed o1 90 X 35 P10 T2 Block Wall to AS3700 Page 9 of 10
Sib ona testimonies compacted fill Internal & Engineer Design &
Physical termite Barrier Engineer design and zo uM Poivthene BPC Framing eax | Specifications. .
as per AS 3660. Specification. a aterproor Membrane Pile
? ee
SEAT ar | Poe fg agai
oll =l tt E 4 qr Fir
E Tee Fale EEE] Fale a BUILDING DESIGN
oe ne int SECTION B:B 1:60 .
TIE Pll lel le .
1 i Fa Fl ——_—_—_——— Rene ici
Cle) Ee ee aS
ROLE TAM ae MET A
E [email protected] M 0408 000450
www.accuratebuildingdesign.com
ACCURATE
Blue Authors initials denotes original copy.
© Copyright: These plans are not to be copied wholly or in part without written permission of Accurate Building Design.
Page 10
[] th
IMPORTANT NOTES: LICENSED PLUMBING CONTRACTOR TO CONFIRM DRAINAGE LAYOUT PLUMBING LEGEND s a ss 8
This plan to be read in conjunction with AND NOMINATE POSITIONS FOR ALL ITEMS REQUIRED FOR COUNCIL g Slyo 2
floor plan. Builder to confirm dimensions PLUMBING INSPECTOR. ST SEPTIC TANK Pas g
prior to construction. Plumbing fixtures HT HOLDING TANK é 8 3 ©
and electrical locations fo be determined ORG OVERFLOW R/GULLY = a 5 a
by builder. Do not scale for plumbing positions 10 INSPECTION OPENING g =
or slab edges. i INSPECTION JUNCTION ass
GIT GREASE INT.TRAP > g s 8
DB DISTRIBUTION BOX /<8 3
Drainage To be connected to existing. Vv VENT s= =
To be confirmed by licensed plumbing contractor. SP SOIL PIPE a o
FWG FLOOR WASTE GULLY gis a
FF FROG FLAP Ses x
DFW | DRY FLOOR WASTE eas 5
RA ROOF ACCESS ae a a
DP DOWN PIPE Qs Ple .
seats |s
a8 38 6
ELECTRICAL LEGEND
LIGHTING
REFER TO FLOOR PLANS FOR SMOKE ALARM LOCATIONS
Symbol Description Qy
OC) | Ceiling Light
@ Down Light "i
w Wall Light x
| IXL Tastic ®
= Fluro Batten ”
POWER =
e Switch re
cy Single Power Point
ak Double Power Point
TV. T.V.Point
BH
Phone Point
i T.V.Antenna & Booster
D.W. Dishwasher Point
Address: L434 (11) Mimosa St. Peregian Bch
Proposed Extensions for
RH. Rangehood Point
MLW. Microwave Point
OTHER ITEMS
EF Exhaust Fan
x Ceiling Fan
x Ceiling Fan with light
Coa Meter Box
O HWS | Hot Water System Page 10 of 10
———| Smoke Alarm
=
S
© Copyright: These plans are not to be copied wholly or in part without written permission of Accurate Building Design.
NATE
- “Bui DING DESIGN
wd
LOWER ELECTRICAL & DRAINAGE LAYOUT
Cle) Ee ee aS
ROLE TAM ae MET A
E [email protected] M 0408 000450
www.accuratebuildingdesign.com
ACCURATE
Blue Authors initials denotes original copy.