Original source · versioned page text
11 Mimosa Street plans showing exisitng original cross-over
Attached to the e-mail Operational Works Application OPW21/0026 - 11 Mimosa St, Peregian Beach.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnSAFE DESIGN AND BUILDING OF STRUCTURES 1. FALLS, SLIPS, TRIPS. (A) WORKING AT HEIGHTS DURING CONSTRUCTION Wherever possible, components of this building should be prefabricated off site or at ground level to minimize the risk of workers falling more than two meters. However, construction of this building will require workers to be working where a fall in excess of two metres is possible and injury is likely to result from such a fall. The builder shall provide a suitable barrier wherever a person is required to work in a situation where falling more than two metres is a possibility. Site/Task Risk assessment and safe work method statements are to be carried out in accordance with the Workplace Health & Safety Act and Workcover and the Construction Work Code of Practice. DURING OPERATION OR MAINTENANCE For houses or other Low-rise buildings where scaffolding is appropriate: Cleaning & Maintenance of windows, walls,roof or other components of this building will require persons to be situated where a fall from height in excess of two metres is possible. Where this type of activity is required, scaffolding, ladders or trestles should be used in accordance with the relevant codes of practice, regulations and legislation. Task Risk assessment and safe work method statements are to be carried out in accordance with the Workplace Health & Safety Act and Workcover requirements. For houses or other Low-rise buildings where scaffolding ladders, and trestles are not appropriate: Cleaning and maintenance of windows, walls, roof or other components of this building will require persons to be situated where a fail from a height in excess of two metres is possible. Where this type of activity is required, scaffolding, fall barriers or Personal Protective Equipment (PPE) should be used in accordance with the relevant Codes of Practice, Workplace health & Safety Regulations & Workcover Legisiation. (B) SLIPPERY OR UNEVEN SURFACES FLOOR FINISHES Floor finishes noted on these drawings are only finish types for the purpose of conducting an energy rating assessmem. The owner is responsibie for the selection of the surface finishes in the pedestrian trafficable areas of this Building. Surfaces should be selected in accordance with AS HB 197:1999 and AS/NZ 4586:2004 STEPS, LOOSE OBJECTS AND UNEVEN SURFACES Where Steps/and or Ramps are included in the building which may be a hazard to workers carrying objects or otherwise occupied. Steps should be clearly marked with both visual and tactile warning during construction, maintenance, demolition and at all times the building operates as a workplace. Building owners and occupiers should monitor the pedestrian access ways and in particular access to areas where maintenance is routinely carried out to ensure that surfaces have not moved or cracked, so that they become uneven and present a trip hazard. Spills, loose material, stray objects or other material that may cause a slip or trip hazard should be cleaned or removed from access ways. Alf contractors and workers are expected to maintain a tidy work site during construction, maintenance or demolition to reduce the risks of trips and falls in the workplace. Materials for construction or maintenance should be stored in designated areas away from access ways and work areas. 2. FALLING OBJECTS LOOSE MATERIAL OR SMALL OBJECTS Construction, Maintenance or Demolition work on or around this building is likely to involve persons working above ground level or above floor levels. Where this occurs one or more of the following measures should be applied to avoid objects falling from the area where the work is being carried out onto persons below. 1/ Prevent or restrict access to areas below where the work is being carried out. 2/ Provide toeboards to scaffolding or work platforms. 3/ Provide a protective structure below the work area. 4/ Ensure that all persons below the work are have the appropriate Personal Protective Equipment. BUILDING COMPONENTS During construction, renovation or demolition of this building, parts of the structure including fabricated steelwork, heavy panels, engineered timber products or roof trusses and many other components wiff remain standing prior to or after supporting parts are in place. Contractors should ensure that temporary bracing and other required support is in place at ail times as the possible collapse may injure persons in the work area. Refer to Engineer or manufacturers recommendations if required. Mechanical Lifting of Materials and components during construction, maintenance or demolition presents a risk of falling objects. Contractors should ensure the appropriate lifting devices are used, that loads are properly secured and that access fo areas below the load is prevented or restricted. 3. TRAFFIC MANAGEMENT For buliding on a major road, a narrow road or steeply sloping road:- Parking of vehicles or loading/unloading of vehicles on this roadway may cause a traffic hazard. During construction, maintenance or demolition of this building designated parking areas for workers and loading areas should be provided. Trained traffic managment personnel should be responsible for the supervision of these areas. For a Building where on-site loading/unloading is restricted:- Construction of this building will require loading and unfoading of materials on the roadway. Deliveries should be well planned to avoid congestion of loading areas, and trained traffic management personnel should be used to supervise loading/unloading. For aff Buildings:- Busy construction and demolition sites present a risk of colfisian where deliveries and other traffic are moving within the site. A traffic management plan supervised by trained traffic management personnel may need to be implemented for the work site. 4.SERVICES Rupture of services during excavation or other activity creates a variety of risks, including the possible release of hazardous material. Existing services are to be located on or around this site. Where known these are identified on the plans, but the exact location and extent of services may vary from that indicated. In locations with underground power, power lines must be disconnected or carefully located and adequate warning signs used prior to any construction, maintenance or demolition commencing. Services should be located using the appropriate service (such as Dial Before You Dig) appropriate excavation practice should be used and, where necessary, specialist contractors should be used. Where overhead power lines are on or near this site they pose a risk of efectrocution if struck or approached by lifting devices or other plant and person working above ground level. Where there is a danger of this occurring, power lines should be, where practical, disconnected or relocated. Where this is not practical adequate warning in the form of bright coloured tape or signage should be used or a protective barrier provided. 5. MANUAL. TASKS Components within this design with a mass in excess of 25kg should be lifted by two or more workers or by a mechanical lifting device. Where this is not practical suppliers or fabricators should be required to limit the component mass. All material packaging, building and maintenance components should clearly show the total mass of packages and where practical ail items should be stored on site in a way which minimizes bending before lifting. Advice should be provided on safe lifting methods in all areas where lifting may occur. Construction, maintenance and demolition of this building wilf require the use of portable tools and equipment. These should be fully maintained in accordance with the manufacturers specifications and not used where faulty or (in the case of electrical equipment) not carrying a current electrical safety tag. All safety guards or devices should be regularly checked and Personal Protective Equipment should be used in accordance with manufacturers specification. 6. HAZARDOUS SUBSTANCES Powered Material Many materials used in the construction of this building can cause harm if inhaled in powdered form. Persons working on or in the building during construction, operational maintenance or demolition should ensure good ventilation and wear Personal Protective Equipment including protection against inhalation of harmful material when sanding,drifing, cutting or otherwise disturbing or creating powdered material. Treated Timber The design of this building includes provision for the inclusion of treated timber within the structure. Dust or fumes from this material can be harmful. Persons working on or in the building during construction, operational maintenance or demolition should ensure good ventilation and wear Personal Protective Equipment including protection against inhalation of harmful material when sanding, drilling, cutting or using treated timber in any way that may cause harmful material to be released. Do not burn Treated Timber. Volatile Organic Compounds Many types of glue, solvents, spray packs, paints, varnishes and some cleaning materials and disinfectants have dangerous emissions. Areas where these are used should be kept well ventilated while the material is being used and for a period after installation. Personal Protective Equipment may also be required. The manufacturers recommendations for use must be carefully considered at all times. Synthetic Mineral Fibre Fibreglass, rockwool, ceramic and other material used for thermal or sound installation may contain synthetic mineral fibre which may be harmful if inhaled or if if comes in contact with the skin, eyes or other sensitive parts of the body. Personal Protective Equipment incfuding protection against inhalation of harmful material should be used when installing, removing or working near bulk insulation material. Timber Floors Areas where finishes are applied should be kept well ventilated during sanding and application and for a period after installation. Personal Protective Equipment may also be required. The manufacturers recommendations for use must be carefully considered at ail times. 7, CONFINED SPACES Excavation Construction of this building and some maintenance on the building may require excavation and installation of items within excavations. Where practical, installation should be carried out using methods which do not require workers to enter the excavation. Where this is not practical, adequate support for the excavated area should be provided to prevent collapse. Warning signs and barriers to prevent accidental or unauthorized access to alf excavations should be provided. 7. CONFINED SPACES CONT. Enclosed Spaces Where workers are required to enter enciosed spaces, air testing equipment and Persoani Protective Equipment should be provided. Small Spaces Where small spaces within this building require access by construction or maintenance workers provide warning signs and barriers to unauthorized access, These should be maintained throughout the life of the building. Where workers are required to enter small spaces they should be scheduled so that access is for short periods. manual Lifting and other manual activity should be restricted in small spaces. 8. PUBLIC ACCESS Public access to construction and demolition sites and to areas under maintenance causes risk to workers and the public. Warning signs and secure barriers to unauthorized access should be provided. The perimeter fence must be adequate and be of a suitable height to deter entry, eg:1800H and be constructed from dedicated materials and be difficult to climb. Be difficult to gain access underneath the gates and joints in the fence and should be secure and not present a weak point for entry. In case of emergency, builders must ensure signs are clearly visible form outside the site, stating the names and contact telephone numbers of the person in control of the building work. Where electrical installation, excavations, plant or loose materials are present they should be secured when not fully supervised. 9. OPERATIONAL USE OF BUILDINGS (For Residential Buildings) This building has been designed as a residential building. if at a later date it is used, or intended to be used as a workplace, the provisions of the Workplace Health & Safety Act 2017 or subsequent replacement Act should be applied for the new use. 10. OTHER HIGH RISK ACTIVITY All electrical work should be carried out in accordance with the Code of Practice: Managing Electrical Risks at the Workplace, AS/NZ 3012 and ail licensing requirements. All work using Plant should be carried out in accordance with the Code of Practice: Managing Risks of Plant in the workplace. All work should be carried out in accordance with the code of practice: Managing Noise and preventing Hearing Loss at work. Due to the potential risks involved in Steelwork and Concrete placement particular care fs to be exercised. The principal contractor is to implement and monitor Workpiace Health & Safety, Safe Work Method Statements, and Risk Assessments. All workers are to comply with the Relevant Code of Practice and Australian Standards and in General the Code of Practice: Managing Risks in Construction Work. (Work Place Health & Safety Act 2011.) Sa /8s| | B§| | Ba) 5 3 & sg 3 alg 5 Sigs | 2 Se 6 so) 18 e5/ | a/§|/g q 286/S/e glsiss 8 Bi Siig 2 2a) a a) <= © Q c & D Y 9 oc f= = © oa OM ws so” ., %& 638 = § oO = cs Oo ma~ aT Om cN Oo + Ad x 3 We 3 & Hn Qo 2 235 o 3 qa < Page 8 of 10 «Vole Ss Jason ACCURATE | atta Ses, aN eEE tik ® Drafting. ea ingdes: ING DESIGN a Cle) Ee ee aS ROLE TAM ae MET A E [email protected] M 0408 000450 Pa ACA ele Blue Authors initials denotes original copy. © Copyright: These plans are not to be copied wholly or in part without written permission of Accurate Building Design.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.