            5.2.2 Risk Analysis
            Our geotechnical assessment of the risk of instability is based on the methodology proposed by Australian
            Geomechanics Society (2007c) ‘Practice Note Guidelines for Landslide Risk Management’ (Reference 1) and
            the relevant site features described above.

            Risk To Property
            The attached Table A summarises our assessment of risk to property under existing conditions and during
            and following construction.

            Under existing conditions, during and following construction, Table A indicates that the assessed risk to
            property is “Low” and “Very Low”. In accordance with the criteria given in Reference 1, “Low” and “Very
            Low” risk levels are considered to be “Acceptable”.

            Risk To Life
            We have not completed a comprehensive assessment of risk to life. However, based on the indicative
            probabilities associated with the assessed likelihood of instability and assuming typical temporal,
            vulnerability, evacuation and spatial factors for this type of site, we consider that the levels of risk to life
            under existing condition, during and following construction to be “Acceptable” in relation to the criteria given
            in Reference 1, i.e. less than 1 x10-6. We note that this assumes the recommendations outlined in Section 6
            below are adopted.



            5.2.3 Additional Comments
            It must be recognised that, due to the many complex factors that can affect a site, the subjective nature of a
            risk analysis, and the imprecise nature of the science of geotechnical engineering, the risk of instability for a
            site cannot be completely removed. It is, however, essential that risk be reduced to at least that which could
            be reasonably anticipated by the community in everyday life and that landowners be made aware of
            reasonable and practical measures available to reduce risk as far as possible. Hence, risk cannot be
            completely removed, only reduced, as removing risk is not currently scientifically achievable.

            In preparing our recommendations given below we have assumed that no activities on surrounding land
            which may affect the risk on the subject site would be carried out. We have further assumed that all Council
            buried services and other buried services within and neighbouring the site are, and will be regularly
            maintained to remain, in good condition.



            5.3     Geotechnical Constraints to Development
            Based on the contents of Sections 5.1 and 5.2 we consider that there are no geotechnical constraints to the
            proposed development. Provided the proposed development is designed and constructed in accordance
            with the advice presented in Section 6, we consider that following construction, the levels of risk to life and
            property will remain at “Acceptable” levels.



            35891URrpt Rev1                                     7
Document Set ID: 22532435
Version: 1, Version Date: 07/08/2023
Log in to download the original file

Approved Plan - EXE230029.pdf · 2.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.