            in some degree of differential deflection, and potential cracking of the floor slabs. If this cannot be accepted,
            then the floor slabs should be suspended (and provided with void formers) as described in Section 6.7 above.

            The following earthworks recommendations should be complemented by reference to AS3798-2007
            “Guidelines on Earthworks for Commercial and Residential Developments”.



            6.8.1 Subgrade Preparation
            Prior to placement of engineered fill for treatment of poor subgrade areas and/or construction of on-grade
            floor slabs, the soil subgrade should be prepared as follows:
                Following removal of any existing paved surfaces, and stripping of topsoil and/or any root affected soils,
                 any remaining poorly compacted fill should be removed, as directed by the geotechnical engineer.
                Proof roll the soil subgrade with a minimum 2 tonne deadweight smooth drum roller, using the static
                 (non-vibration) mode, following thorough moistening of the sand subgrade. Where access is restricted,
                 proof rolling is expected to require the use of a hand-held plate/sled compactor.
                If soil softening occurs after rainfall, then the clay subgrade should be over-excavated to below the depth
                 of moisture softening and replaced with engineered fill. Conversely, if a clayey subgrade exhibits
                 shrinkage cracking, then the surface should be lightly watered and rolled until the shrinkage cracks are
                 no longer evident.
                Proof rolling should be closely monitored by the geotechnical engineer to detect soft or unstable areas
                 which should be removed and replaced with engineered fill (as outlined below). Care should be taken
                 not to over-compact the clayey subgrade.
                Care should also be taken when using vibrating equipment not to cause damage to any adjacent
                 structures. The vibrations should be qualitatively monitored by site personnel and if there is any cause
                 for concern then proof rolling should cease and further advice sought.



            6.8.2 Drainage During Construction
            The subgrade will comprise clay soils which may be found to be unstable if proper site drainage is not
            implemented during construction. It is therefore important to provide good drainage in order to promote
            run-off and reduce ponding. Earthworks platforms should be graded to maintain cross-falls during
            construction. If the clays are exposed to periods of rainfall, softening may result and site trafficability will be
            poor. If softening occurs, the subgrade should be over-excavated to below the depth of moisture softening.
            The material removed should be replaced with engineered fill. Trafficability may be improved by the use of
            a sacrificial surface layer of crushed demolition rubble.



            6.8.3 Engineered Fill
            For treatment of any poor subgrade areas and backfill to retaining walls, engineered fill should be used.

            Engineered fill should be free from organic materials, other contaminants and deleterious substances and
            have a maximum particle size not exceeding 40mm. The locally excavated clays may be used as engineered

            35891URrpt Rev1                                     13
Document Set ID: 22532435
Version: 1, Version Date: 07/08/2023
Log in to download the original file

Approved Plan - EXE230029.pdf · 2.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.