Skip to the record
For the highest quality transcripts.

Original source · versioned page text

Approved Plan - EXE230029

of 45

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
            Report prepared by:
                                                     Paul Roberts CPEng, RPEQ
                                                     Principal Associate | Engineering Geologist



            For and on behalf of
            JK GEOTECHNICS
            PO Box 503,
            Cooroy, QLD, 4563
            Head Office:
            PO BOX 976
            NORTH RYDE BC NSW 1670


            DOCUMENT REVISION RECORD
               Report Reference                              Report Status                                  Report Date
               35891URrpt                                    Final Report                                   24 April 2023
               35891URrpt Rev1                               Revised report following review by             16 May 2023
                                                             architect



            © Document copyright of JK Geotechnics

               This report (which includes all attachments and annexures) has been prepared by JK Geotechnics (JKG) for its Client, and is
               intended for the use only by that Client.

               This Report has been prepared pursuant to a contract between JKG and its Client and is therefore subject to:
               a)         JKG’s proposal in respect of the work covered by the Report;
               b)         The limitations defined in the Client’s brief to JKG;
               c)         The terms of contract between JKG and the Client, including terms limiting the liability of JKG.
               If the Client, or any person, provides a copy of this Report to any third party, such third party must not rely on this Report, except
               with the express written consent of JKG which, if given, will be deemed to be upon the same terms, conditions, restrictions and
               limitations as apply by virtue of (a), (b), and (c) above.

               Any third party who seeks to rely on this Report without the express written consent of JKG does so entirely at their own risk and
               to the fullest extent permitted by law, JKG accepts no liability whatsoever, in respect of any loss or damage suffered by any such
               third party.

               At the Company’s discretion, JKG may send a paper copy of this report for confirmation. In the event of any discrepancy between
               paper and electronic versions, the paper version is to take precedence. The USER shall ascertain the accuracy and the suitability
               of this information for the purpose intended; reasonable effort is made at the time of assembling this information to ensure its
               integrity. The recipient is not authorised to modify the content of the information supplied without the prior written consent of
               JKG.




            35891URrpt Rev1                                                 ii
Document Set ID: 22532435
Version: 1, Version Date: 07/08/2023
Log in to download the original file

Approved Plan - EXE230029.pdf · 2.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.