16400ms.ms - Final Town Planning Letter - 24 Sunshine Beach Road (00016125) · MCU15/0076
Attached to the e-mail MCU15/0076 Development Application - Wellbeing Type 2 - Social -.
services at the gym. At Easter and Christmas, donations from the Church
congregations to the City Care programme will also be stored temporarily on site.
4.0 Statutory Assessment
4.1 Sustainable Planning Act 2009
The Sustainable Planning Act 2009 (SPA) provides the overall statutory planning
framework for Queensland. The subject site is located within the local government
boundaries of Noosa Council and the development application is subject to the
provisions of the Noosa Plan 2006 (the planning scheme). Based on the relevant
provisions of the planning scheme, the proposed development requires code
assessment and those matters that the Assessment Manager must have regard to
when assessing the application are set out in section 313 of SPA.
4.2 State Planning Regulatory Provisions
There are currently seven (7) State Planning Regulatory Provisions (SPRPs) in force
but only the SEQ Regional Plan 2009-2031 SPRP (May 2014) and the SPRP (adopted
charges) have any relevance to this proposal. These documents are discussed
briefly below.
4.2.1 SEQ Regional Plan 2009-2031 SPRP (May 2014)
The site is subject to the South East Queensland Regional Plan 2009-2031 (SEQRP),
which was released in July 2009, and the South East Queensland Regional Plan
Regulatory Provisions 2009-2031, which implement the Regional Plan. The Regional
Plan maps show that the subject site forms part of the “Urban Footprint”
designation in the SEQRP. The proposed use is entirely consistent with this
designation and, on this basis no further assessment is required against the State
Development Assessment Provisions (SDAP).
4.2.2 SPRP (adopted charges) (August 2013)
The SPRP establishes a maximum adopted charge for trunk infrastructure. The
Noosa Council has adopted an Infrastructure Charges Resolution in line with the
SPRP. As infrastructure contributions for this development will be payable in
accordance with the Council’s adopted policy, no further assessment is required
against the SPRP.
4.2.3 State Planning Policy
As the planning scheme predates the current State Planning Policy (SPP), the
proposal has been reviewed against the interim development assessment
requirements set out in Part E of the SPP. This review has identified that the
application does not seek approval for the type of development mentioned in Part
E of the SPP and as such, no further assessment is required against the Policy.
4.2.4 State Development Assessment Provisions
The State Assessment and Referral Agency (SARA) became active on 1 July 2013.
A review of the SARA mapping illustrates that the following SARA layers apply to the
site:
August 2015 Proposed Material Change of Use – Wellbeing Type 2 - Social Page 5
24 Sunshine Beach Road, Noosa Heads
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
16400ms.ms - Final Town Planning Letter - 24 Sunshine Beach Road (00016125).pdfRelated documentApplication case desk ↗
About this file
- File size
- 424 KB (small file)
- File type
No other editions are linked here.