~ IDAS C-6
In the latter case, alternative action may be appropriate to minimise the risk in the first instance. For
example, where the nsk of exposure to any UXO that may exist is reduced by the presence of a
structure or natural barrier, issuance of the standard UXO warning (see Condition 4.2) may suffice
while the structure, stockpile or barrier remains in place. Where a structure is to be removed or
reduced as part of the development program, protective precautions, commensurate with any greater
risk to which workers might then be exposed, may need to be considered. Progressive assessment
will be necessary where such circumstances exist. Unless, at the completion of preliminary works,
there is evidence then available to the UXO contractor that any residual risk is negligible, the use of
detection equipment will typically be required to confirm the site’s status.
Where investigation, along with any subsequent remedial action and assessment, is to be
implemented by stages to satisfy Condition 4.1 and 4.3, a preliminary investigation report should be
submitted by the applicant to the EPA along with a management plan for the proposed work. Staged
investigation/remediation is most likely to be applicable where development of smaller, built-on lots
(which can present circumstances such as those discussed above) or broadhectare sites is proposed. In
such cases, the EPA’s assessment of the report and advice to Council in regard to approval of the
development will be dependent on agreement with the management plan.
Where Condition 4.1 is to be satisfied by a whole lot or broadhectare development stage being
subjected to investigation and any necessary remedial action, the EPA, based on the subsequent
investigation/remediation report’s findings and recommendation/s, may reassess the lot, or that portion -
comprising the development stage, as being remediated or not needing remediation, and advise the
applicant and Council accordingly. Otherwise, any balance of land that has not been further ~
investigated will retain the risk assessment made by Defence. This is unless evidence obtained from
the investigated part/s can be used to refute Defence’s assessment in regard to all or part of the .
balance. In the latter case, the EPA may reassess all of the balance or the applicable part/s as being
unaffected by UXO.
6 Additional information So,
This concurrence response applies only to contaminated land issues and does not remove the need to
. obtain any further approval for this development which may be required by this or other legislation,
_ State and/or Commonwealth. Applicants are advised to check with all relevant statutory authorities.
Applicants should also comply with all relevant legislation.
The EPA has not provided a notification to native title parties for this application. The State’s
Native Title Work Procedures indicate that the responsibility for assessment of native title issues for
an IDAS application rests with the Assessment Manager. It is recommended that the Assessment
Manager determines whether native title notification is required for this application.
*End of response* .
IDAS C-6 CLM
VER 2See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
0015A860.001.pdfRelated documentPublic source context ↗
07/1457 Concurrence agency response [As Published]Related documentApplication case desk ↗
About this file
- File size
- 251 KB (small file)
- File type
No other editions are linked here.