Original source · versioned page text
RFI - Attachment C - Civil Engineering Report
The original of this document is very large (15.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 4, section 1. The text section number identifies this passage in the reader.
31 May 2019
Table of Contents
EXECUTIVE SUMMARY 2
1 PURPOSE 5
2 INTRODUCTION 5
2.1 Project Description 5
3 SITE CHARACTERISTICS 7
3.1 Site location 7
3.2 Topography and Existing Site Drainage 8
4 SITE DATA 8
5 STORMWATER 9
6 EROSION AND SEDIMENT CONTROL 9
7 WATER SUPPLY 9
8 SEWER 9
9 ROADWORKS 9
10 EARTHWORKS 10
11 ELECTRICITY AND TELECOMMUNICATIONS 10
12 GAS 10
13 CODES 11
14 CONCLUSION 11
15 LIMITATONS OF REPORT 11
Excellence with Economy in Engineering 3
l:\7000-7999\7700-7799\7700\reports\31-05-19 civil engineering report_issue c.docx
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.