Skip to the record
Every meeting, every word.

Original source · versioned page text

RFI - Attachment C - Civil Engineering Report

of 60

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (15.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 54, section 1. The text section number identifies this passage in the reader.

WATER SENSITIVE DESIGN CODE
Performance Criteria and Acceptable Solution
Hofmann Drive Medical Centre
1 August 2018
Issue A


              PERFORMANCE OUTCOMES                                               ACCEPTABLE OUTCOMES                                                      RESPONSE

Maintenance of environmental values and water quality objectives
PO1                                                                AO1.1                                                       RO1.1
Downstream ecosystems, properties and infrastructure are           Development meets the applicable performance outcomes       Complies – The development meets the applicable
not adversely impacted by either changes to flow, water            of the State Planning Policy Appendix 2 SPP Code: Water     performance outcomes of the State Planning Policy
quality or ecosystem health caused by development.                 Quality;                                                    Appendix 2 SPP Code: Water Quality. Refer to the
                                                                   AND                                                         Stormwater Management Plan prepared by MPN Consulting
                                                                                                                               for further information.

                                                                   AO1.2                                                       RO1.2
                                                                                                                               Not applicable – Proprietary filters are proposed to be
                                                                   Design and construction methods for stormwater quality      constructed as part of the development instead of vegetated
                                                                   treatment assets are in accordance with Healthy             assets. Refer to the Stormwater Management Plan prepared
                                                                   Waterways Water By Design Guidelines;                       by MPN Consulting for further information.
                                                                   AND
                                                                   AO1.3                                                       RO1.3
                                                                   Commitments are made to implement a cost effective          Complies – A maintenance plan will be prepared and
                                                                   maintenance strategy for the life cycle of any engineered   implemented prior to completion of the works for the
                                                                   water quality treatment device;                             proposed water quality treatment devices.
                                                                   AND
                                                                   AO1.4                                                       RO1.4
                                                                   Water quality nutrient load modelling is undertaken in      Complies – Water quality nutrient load modelling has been
                                                                   accordance with Water by Design Music Modelling             completed as part of the Stormwater Management Plan
                                                                   Guidelines to demonstrate compliance with the SPP           prepared by MPN Consulting to demonstrate compliance
                                                                   nutrient reduction requirements;                            with the SPP nutrient reduction requirements.
                                                                    AND




l:\7000-7999\7700-7799\7700\codes\01-08-18 water sensitive design code.docx
                                                                                            Page 1
Log in to download the original file

RFI - Attachment C - Civil Engineering Report.pdf · 15.6 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.