ASTP TP Report · MCU24/0001
Performance Outcome Acceptable Outcomes
streetscape character; Where located on the boundary:
(c) avoid interference with movement of (a) the solid portion of front fences and walls
surface stormwater; is no more than 1.2 metres high; or
(d) allow for casual surveillance of the (b) the walls contain openings or materials
street; that ensure it is 50% transparent and has a
(e) provide planting in front of solid fences height not exceeding 1.8 metres.
and walls; and
(f) ensure plantings between the front AO17.3
fence and the footpath does not create Solid front fences and walls may be 1.8 metres in
an impediment for pedestrians using height if the property has frontage to an arterial
the footpath road or a distributor road.
AO17.4
The area of land between the front fence and the
boundary is landscaped to screen the fence from
the street however landscaping does not encroach
more than 500mm into the road reserve or within
1.5 metres of a sealed footpath.
Response
The proposal does not comply with the above Acceptable Outcomes.
The front property boundary will be fenced with solid walls/palings that exceed 1.2 metres in height.
This is required in order to screen and secure the private open space area of each unit from the street.
Further, the front fence does not step in or allow for landscaping in front. The proposed front fencing
outcome is resultant from the considerable constraint imposed by the extensive dual street frontage
and the need to provide sufficient private open space onsite, whilst still maintaining a 6 metre front
setback to the walls of the development. As such, private open space areas must adjoin the street, to
enable the front setback to comprise landscaped open space, however it is still needed to afford the
residents a reasonable level of privacy and security.
This outcome is appropriate on the basis that garden beds will be provided behind part of the fencing
and tree planting will occur within the site, which will be visible from the street. Further, it is proposed
to retain the existing mature street trees in the verge and plant three (3) new street trees, which will
collectively aid the screening and buffering of the front fence from the street. Finally, the fence will be
constructed using a range of materials, including rendered blockwork, painted palings, aluminium gates
and textured stonewall, such that it will provide a varied and visually interesting street address. Overall,
the proposed front fence will not compromise the visual amenity of the streetscape.
The proposal complies in full with PO17 of the Code on the following basis:
• the front fencing comprises a combination of high-quality materials with mid-rise planting
provided behind, collectively providing visual interest and contributing to the overall
attractiveness of the streetscape;
• the adjoining and adjacent properties all provide 1.8 metre high solid fences/walls along the
front boundary. Further, this outcome is common for properties in the wider streetscape. As
such, the proposed front fencing outcome is compatible with the existing streetscape
character;
• inter-allotment drainage is provided onsite to convey stormwater to a lawful point of discharge,
ASTP Ref: 230904 Page 12 of 15
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
ASTP TP Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.1 MB (small file)
- File type
No other editions are linked here.