Skip to the record
Mmm.. taste the original NoosaWatch™

Council archive · source document

ASTP TP Report · MCU24/0001

of 15

Text shows just the words. Original shows the document exactly as it was published.

 Performance Outcome                                     Acceptable Outcomes
             streetscape character;                      Where located on the boundary:
         (c) avoid interference with movement of            (a) the solid portion of front fences and walls
             surface stormwater;                                 is no more than 1.2 metres high; or
         (d) allow for casual surveillance of the           (b) the walls contain openings or materials
             street;                                             that ensure it is 50% transparent and has a
         (e) provide planting in front of solid fences           height not exceeding 1.8 metres.
             and walls; and
         (f) ensure plantings between the front          AO17.3
             fence and the footpath does not create      Solid front fences and walls may be 1.8 metres in
             an impediment for pedestrians using         height if the property has frontage to an arterial
             the footpath                                road or a distributor road.

                                                         AO17.4
                                                         The area of land between the front fence and the
                                                         boundary is landscaped to screen the fence from
                                                         the street however landscaping does not encroach
                                                         more than 500mm into the road reserve or within
                                                         1.5 metres of a sealed footpath.
 Response
 The proposal does not comply with the above Acceptable Outcomes.

 The front property boundary will be fenced with solid walls/palings that exceed 1.2 metres in height.
 This is required in order to screen and secure the private open space area of each unit from the street.
 Further, the front fence does not step in or allow for landscaping in front. The proposed front fencing
 outcome is resultant from the considerable constraint imposed by the extensive dual street frontage
 and the need to provide sufficient private open space onsite, whilst still maintaining a 6 metre front
 setback to the walls of the development. As such, private open space areas must adjoin the street, to
 enable the front setback to comprise landscaped open space, however it is still needed to afford the
 residents a reasonable level of privacy and security.

 This outcome is appropriate on the basis that garden beds will be provided behind part of the fencing
 and tree planting will occur within the site, which will be visible from the street. Further, it is proposed
 to retain the existing mature street trees in the verge and plant three (3) new street trees, which will
 collectively aid the screening and buffering of the front fence from the street. Finally, the fence will be
 constructed using a range of materials, including rendered blockwork, painted palings, aluminium gates
 and textured stonewall, such that it will provide a varied and visually interesting street address. Overall,
 the proposed front fence will not compromise the visual amenity of the streetscape.

 The proposal complies in full with PO17 of the Code on the following basis:
     •      the front fencing comprises a combination of high-quality materials with mid-rise planting
            provided behind, collectively providing visual interest and contributing to the overall
            attractiveness of the streetscape;
     •      the adjoining and adjacent properties all provide 1.8 metre high solid fences/walls along the
            front boundary. Further, this outcome is common for properties in the wider streetscape. As
            such, the proposed front fencing outcome is compatible with the existing streetscape
            character;
     •      inter-allotment drainage is provided onsite to convey stormwater to a lawful point of discharge,


ASTP Ref: 230904                                                                                  Page 12 of 15

Used in these records

About this file

File size
1.1 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

ASTP TP Report.pdf · 1.1 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.