APPLICATION FOR A MINOR CHANGE TO A DEVELOPMENT APPROVAL
Author	Development Planner, Glen Conforti
Development Assessment

APPLICATION DETAILS
Application No.	132007.738.04
Development Approval	Material Change of Use – Industrial Business Type 1 (Warehouse) & Industrial Business Type 2 (Production, Alteration, Repackaging & Repairing)
Applicant	64 Gateway Drive PTY LTD
Request Received On	9 October 2018

PROPERTY DETAILS
Property Address	64 Gateway Dr Noosaville Qld 4566
RP Description	Lot 13 SP 170295
Land Area	12,350m²
Existing Use of Land	Vacant

STATUTORY DETAILS
SEQRP Designation	Urban Footprint
Locality	Noosaville
Zone	Industry
Overlays	Biodiversity Overlay – Environmental Protection Natural Hazards Overlay - Flood Hazard Area Natural Hazards Overlay – High and Low Potential Acid Sulfate Soils
Assessment Type	Minor Change to Development Approval

PROPOSAL
The applicant seeks approval to change the existing approval to update the external facades, increase GFA/Use Area, increase car parking onsite and undertake the development in 3 stages.
The proposed changes are outlined below.
Built form
The building footprint remains generally unchanged with the external materials changing to incorporate a more industrial warehouse type of architectural design and a natural tone colour scheme. The roof form is mostly 5 degrees with some parapet areas to add horizontal elements and variety. The external materials include a mix of raw and painted tilt panel concrete, composite timber –look cladding, metal strip cladding and axon cladding. Part of the elevations are shown below in Figure 1.

Figure 1 - Southern elevation of the northern tenancies
Gross Floor Area / Use Area
The proposal seeks to increase Use Area from 3,840m² to 5,769m², an increase of 1,929m². The proposed GFA is 5,590m² (excludes balconies). This has occurred by increasing the size of some tenancies by including mezzanines floors.
Carparking
The current approval is for equivalent to 104 car parking spaces. This has been calculated in accordance with Councils traffic consultant which required the tenancies 150m² or less, a parking rate of 1 space per 30m² and for tenancies greater than 150m², 1 space per 50m². The proposal is for the equivalent to 127 spaces in accordance with the rate mentioned above.
Staging
The application also seeks to undertake the development in 3 stages and has provided a staging plan accordingly. The staging plan is provide as Figure 2 below.

Figure 2 - Staging Plan.
background
A Development Permit for a Material Change of Use - Industrial Business Type 1 – Warehouse and Industrial Business Type 2 – Production, Alteration, Repackaging & Repairing was issued on 2 July 2008.
132007.738.01 - On 9 April 2013 Council changed Condition 22 to extend the relevant period to 2 July 2016.
132007.738.02 – On 14 June 2016 Council changed Condition 22 to extend the relevant to 2 July 2020.
assessment
Instruments for Statutory Assessment
Under the Planning Act 2016 the application must be assessed against each of the following statutory planning instruments to the extent they are relevant to the development:
State Planning Policy;
South East Queensland Regional Plan;
Planning Regulation 2017;
The Noosa Plan.
The following codes from the Noosa Plan are applicable to this development:
Noosaville Locality Plan
Business Uses Code
Landscaping Code
Engineering Works Codes
Statutory Process
The applicant has requested to make a minor change to a development approval under s78 of the Planning Act 2016. An application for a minor change to a development approval can only be made in circumstances where a change would constitute a ‘minor change’.
The proposed change to the development approval requested by the applicant is determined to constitute a minor change on the grounds that:
the development would not result in substantially different development.
Schedule 1 of the DA Rules sets out circumstances that would result in a substantially different development. The most significant is a proposal introducing a new use to a site and dramatically changes the built form is terms of scale, bulk and appearance.  The development is not introducing any new uses and while the development is increasing use area by 1929m², the built form is not changing dramatically as the increase in use area is via new mezzanines within the tenancies and very minor changes in the building footprint;
the change does not include prohibited development;
the change would not require the application to be referred to an additional referral agency or cause a referral agency to have regard to new mattes prescribed by regulation;
where the original application was code assessable, the change would not cause the application to become impact assessable.
Statutory Instruments – Planning Scheme
The original application was assessed against The Noosa Pan and there has been no changes that would affect the assessment of this development. The development remains consistent with the provisions of the planning scheme.
Condition 1 – Approved Plans
Development undertaken in accordance with this approval must generally comply with the approved plan of development. The approved plan is titled and numbered:
Plan / Document No.	Rev.	Plan / Document Name	Date
Sheet No. 1		“Industrial Development at Precinct N Gateway Drive Noosaville” prepared by Herwig Hartl trading as Smartarch	May 2008
and as may be amended by these conditions.
Applicant’s Request
The applicant seeks a new architectural external design which includes new external finishes and mezzanine floor internal to the tenancies and some minor layout changes. A new suite of plans have been provided to reflect the new design.
Assessment of Request
Changes include an increase in total Use area from 3,840m² to 5,769m², an increase of 1,929m². It should be noted the proposed GFA is 5,590m² (excluding balconies). The increase complies with the relevant Planning Scheme Codes as the building footprint remains generally the same. No GFA provisions for the Industry zone applies as the building size is regulated by setbacks, landscaping and the provision of car parking. The increase in Use area is a result of mezzanine floors proposed within the tenancies.
Car parking has been increased accordingly with a slight change to the configuration to include some tandem car spaces. This is discussed further in the body of this report.
The Planning Scheme requires 15% landscaping. The proposal increases landscaping open space from 35% to 37% complying with the Planning Scheme. An existing condition requires a shade tree for each 6 car spaces within the car parking area.
The setbacks remain unchanged and comply with the Planning Scheme being 6m to the primary frontage and 4.5m to a secondary frontage. A 6m setbacks to the western side of the cul de sac  is proposed and between 4.5m and 7.7m to the eastern side of the cul de sac.
The external finishes include a range of material finishes which create interest and raise no concern.
Staging
The applicant seeks to construct the development in 3 stages as shown above in Figure 2 in section 1 of this report. Staging the development does not raise any concerns providing the car parking, stormwater quantity and quality can be provided so stage 1 and stage 1 & 2 combined can stand alone. The applicant has demonstrated that carparking can work and Councils water quality officer suggests that it appears that stormwater also could work providing the relevant conditions are amended accordingly which are addressed within the body of this report. Overall, an additional condition in the form of a sunset condition is required to ensure the development is not left partially constructed.
The change to the approved plans have been assessed within the body of this report and raise no concerns and as such Condition 1 is agreed to be changed to reflect the proposed development.

Condition 3 – Landscaped open space
The open space and setback areas are to be landscaped in accordance with Council’s Policy on Landscaping Guidelines and a properly prepared landscape plan prepared by a suitably qualified Landscape Architect or Horticulturalist. Such landscaping is to be completed prior to the premises being occupied and maintained at all times thereafter.  The landscaping shall include:
A minimum of 2m width of landscaping adjacent to uncovered parking at the head of the cul-de-sac;
A minimum of 1 shade tree per six vehicle parking spaces;
Dense native screening vegetation within the landscaped buffer adjacent the western boundary (where not located within the easement area) consisting of species with a range of mature canopy heights;
Revegetation of the landscaped buffer along the northern and eastern boundaries; &
Appropriate landscaping / treatment to bin collection or storage areas so that they do not dominate the streetscape.
Applicant’s Request
The applicant requests the following request to Condition 3
3.The open space and setback areas are to be landscaped in accordance with Council’s Policy on Landscaping Guidelines and a properly prepared landscape plan prepared by a suitably qualified Landscape Architect or Horticulturalist. Such landscaping is to be completed prior to the premises being occupied and maintained at all times thereafter.  The landscaping shall include:
A average of 2m width of landscaping adjacent to uncovered parking at the head of the cul-de-sac in accordance with the approved Master Floor Plan;
A minimum of 1 shade tree per six vehicle parking spaces;
Dense native screening vegetation within the landscaped buffer adjacent the western boundary (where not located within the easement area) consisting of species with a range of mature canopy heights;
Revegetation of the landscaped buffer along the northern and eastern boundaries; &
Appropriate landscaping / treatment to bin collection or storage areas so that they do not dominate the streetscape.
Assessment of Request
The applicant seeks a minimum landscaping of 1.7m & 1.4m to uncovered car parking and between zero & 0.3m to motor cycle spaces. Considerable landscaping is provided to the frontage which will provide an attractive entry to the development. However, it is considered there is not sufficient landscaping between the boundary and 2 of the closest motor cycle spaces each side of the centrally located entry. Therefore, it is not agreed to change the condition as requested by the applicant. Given the development is in excess of motor cycle spaces, it is considered the condition is changed to delete these 2 motor cycle spaces and replace with garden. The condition to read as follows:
3.The open space and setback areas are to be landscaped in accordance with Council’s Policy on Landscaping Guidelines and a properly prepared landscape plan prepared by a suitably qualified Landscape Architect or Horticulturalist. Such landscaping is to be completed prior to the premises being occupied and maintained at all times thereafter.  The landscaping shall include:
A minimum of 2m width of landscaping adjacent to uncovered parking at the head of the cul-de-sac except for car space 12 which must  be setback a minimum of 1.7m and car space 13 which must be setback a minimum of 1.4m. The motor cycle space closest to the each side of the central entry must be removed and replaced with landscaping and include a shade tree;
A minimum of 1 shade tree per six vehicle parking spaces;
Dense native screening vegetation within the landscaped buffer adjacent the western boundary (where not located within the easement area) consisting of species with a range of mature canopy heights;
Revegetation of the landscaped buffer along the northern and eastern boundaries; &
Appropriate landscaping / treatment to bin collection or storage areas so that they do not dominate the streetscape.

Condition 8 – Retail sales
8. The retail sales component of any tenancy shall not exceed 20% of the gross floor area of that tenancy and shall relate to an industry use conducted from that tenancy.
Applicant’s Request
8. The retail sales component of any tenancy shall not exceed the gross floor area requirement of The Planning Scheme for that tenancy and shall relate to an accepted  use conducted from that tenancy.

Assessment of Request
The applicant is preparing for the draft Planning Scheme gazettal. The draft Planning Scheme allows greater flexibility for retail use of up to 30% of the GFA of the tenancy and a broader range of uses for the Industry zone. Furthermore, the draft Planning Scheme has a range of uses which are ‘accepted development subject to requirements’ where these additional uses could be integrated into the development. Therefore, it is agreed to remove reference to the 20% but not the requested removal of Industry as the primary use of the site as it is required to ensure the industrial nature of the development. Rather than using’ industrial use’ it is considered acceptable to use ‘approved use’ which ensures the primary use of the development and the intent of the Planning Scheme to be of an industrial nature or those uses the planning scheme in force at the time may allow to be ‘accepted development subject to requirements’. It is agreed to change the condition to read as follows:
8. The retail sales component of any tenancy shall not exceed the gross floor area requirement of the Planning Scheme in force at the time for that tenancy and shall remain an ancillary component of the approved use.

Condition 10 – Bicycle spaces
10. Secure bicycle racks shall be provided on site to accommodate a minimum of 41 bicycles.  The proposed bicycle racks shall be identified on the landscaping plans and shall be shall be dispersed across the site to the reasonable satisfaction of Council.
Applicant’s Request
10.Secure bicycle racks shall be provided on site to accommodate a minimum of 45 bicycles.  The proposed bicycle racks shall be identified on the landscaping plans and shall be shall be dispersed across the site to the reasonable satisfaction of Council.

Assessment of Request
The applicant suggest an additional 4 bicycle spaces. The Business Use Code requires 1 space per 100m² of GFA which would result in 58 spaces. This is considered excessive and the 45 spaces suggest by the applicant is agreed with.

Condition – Relevant period and staging
22. The Development Permit for a material change of use of premises lapses if the use has not happened by 2 July 2020 unless an application to extend the currency is approved by Council.
Applicant’s Request
22. The Development Permit for a material change of use of premises lapses if the use has not happened by 2 July 2022, unless an application to extend the currency is approved by Council.
Propose an extension for a further two years to allow for potential development staging of the development and to meet market conditions. In support of this request, it is noted the proposed New Noosa Plan still supports this development in the site.
Assessment of Request
It is agreed that the proposal meets the provisions of The Noosa Plan. The draft Noosa Plan seeks the same intent for the site although the site is proposed to be split zoned Low Impact Industry and Environmental Management. The Environmental Management zone reflects the current setback of this proposal.
Given the proposal meets the Noosa Plan and the draft Planning Scheme it is reasonable to extend the time for possible staging of the development. A sunset clause is the usual policy applied for staged development and not just an extended relevant period. The standard of 6 years sunset clause could be integrated into the a timeframe by allowing a further 2 years relevant period and a 4 year completion date as a sunset clause and read as follows:

22. The Development Permit for a material change of use of premises lapses if the use has not happened by 2 July 2022 unless an application to extend the currency is approved by Council.
A staging condition and a sunset clause is required should the development be staged and is provided as 2 additional conditions and read as follows:
Staging
83. Should the development be staged, the staging sequence must be undertaken in accordance with the approved master plan - staging plan.
Sunset Clause for Completion of Approved Development
84. Pursuant to s88(1) of the Planning Act 2016, the uncompleted aspects of this development approval lapses if the whole of the approved use has not happened by 2 July 2026.

Condition 24 - Access
24. Vehicular access to the site shall be constructed from the Gateway Drive frontage of the site generally in accordance with Drawing Job No: M0906, Sheet No: 1 dated May 2008 by Hartland consultants Pty Ltd - Smartarch and as may amended by these conditions.
Applicant’s Request
The applicant seeks to amend the condition to reflect the new plans
Assessment of Request
Agreed.

Conditions  31 & 32 - Car parking
31.Car parking, loading zones and skip bin storage shall be designed and constructed generally in accordance with Drawing Job No: M0906, Sheet No: 1 dated May 2008 prepared by Hartland consultants Pty Ltd - Smartarch.
32.A minimum of 104 uncovered carpark spaces shall be provided on site and shall include:-
3 clearly defined and strategically placed disabled carpark spaces.
A minimum of the equivalent of 3 of the car parking spaces designated for motorcycle and motor scooter parking, to accommodate a minimum of 12 spaces.  Motorcycle and motor scooter parking is to be evenly dispersed across the site.
Applicant’s Request
The conditions are required to be changed to reflect the new plans and the increase in the number of car parking spaces throughout the site.
Assessment of Request
Agree.
The proposal plans provide car parking at the rate identified by Councils consultant traffic engineer at the time of the original approval which is 1 space per 30m² for tenancies 150m² or less and 1 space per 50m² for tenancies greater than 150m². Parking in the form of 125 car spaces and 14 motor cycle spaces are proposed.
There are some in tandem spaces which is acceptable for staff car parking.
Proposed Condition 3 requires 2 motor cycle spaces to be removed either side of the central vehicle access which results in 12 motor cycle spaces which is equivalent to 3 car spaces  resulting in equivalent to 128 car spaces proposed. The development requires a total of 127 spaces. It is likely the additional space will be removed to comply with the waste bin conditions.

Condition 43 & 44 - Stormwater
43.The treatment train including the gross pollutant traps/oil arrestors, Bio-Retention Basin/Unit and Raingardens shall have three (3) years maintenance period from the date of the accepting the operational works on the site on maintenance.
During the three years maintenance period the applicant shall monitor the quality of the stormwater runoff existing the site to ensure that water achieve the water quality objectives as set out by Council and generally as described by the Stormwater Quality Management and Assessment Report dated March 2007 prepared by Callaghan & Toth.  Should the monitoring indicate that the objectives have not been met or indicate that objectives may not be met the applicant shall undertake the necessary works and/or upgrading works to ensure the objectives are achieved on a regular basis.
44.The applicant shall provide a comprehensive ongoing stormwater quality monitoring, management and maintenance program for the stormwater treatment train on the development site including the water tanks and gross pollutants traps (GPTs).  The management plan shall be submitted to the Council for approval in conjunction with obtaining a Development Permit for Operational Works.
The approved maintenance plan must be incorporated in the Community Management Scheme for the development and a copy of this shall be provided for Council’s records prior to commencement of the approved Use.
Applicant’s Request
The applicant did not request for these conditions to be changed.
Assessment of Request
The stormwater conditions are required to be changed to ensure the development manages water quality and quantity in accordance with the Noosa Plan and the relevant guidelines and should the development be staged each stage’s stormwater is managed appropriately as a standalone development.

Condition - Unitywater
Conditions 45, 50, 51 and 52 are requested to be amended to reflect the change in reticulated water and sewer asset ownership.

Condition 68 – Infrastructure Charges
68. Monetary contributions shall be paid to Noosa Council towards the cost of providing and/or upgrading various infrastructure at the rates applicable at the time of payment.  An estimate only of the contribution amounts under the current Council policies and requirements is outlined in the table below:
Contribution Required For:	Amount:
PSP12 – Public Open Space Contributions (Park)	$13,086
PSP16 – Sewerage Headworks Contributions	$31,492
PSP17 – Water Supply Headworks Contributions	$27,331
PSP20 – Pathway Trunk Network Contributions	$13,911
TOTAL Contribution Amount =	$ 85,820
Please note that these amounts are all subject to variations in the Consumer Price Index, All Groups Brisbane from March 2008 until the date of payment.

All contributions must be paid prior to the issue of a Development Permit for Operational Works
Alternatively a trading bank guarantee shall be submitted to Council plus 20%.  Should the contributions not be paid at the due time, Council shall call upon the trading bank guarantee in full.
Processing of bonds for security where specific Council approval has been given for the bonding of contributions will incur an administration fee in accordance with Council’s Land Development Commercial & Regulatory Fees at the time of lodgement.
In the event that the Development Permit for Material Change of Use of Premises lapses or is cancelled, the paid contributions and/or the trading bank guarantee will be returned.
Applicant’s Request
The applicant seeks the condition to be deleted suggesting it is superseded by an Infrastructure Agreement.
Assessment of Request
Disagree. The infrastructure agreement (IA) does supersede the condition but it is considered that the condition remains to ensure infrastructure changes are paid in accordance with the Planning Act 2016. A new infrastructure agreement is proposed to replace the existing agreement as the development seeks additional gross floor area. The new IA includes the 2 charging regimes in accordance with the Planning Act 2016.
The amended condition is provided track changed below:
68.  Monetary contributions shall be paid to Noosa Council towards the cost of providing and/or upgrading various infrastructure at the rates applicable at the time of payment.  An estimate only of the contribution amounts under the current Council policies and requirements is outlined in the table below:
Contribution Required For:	Amount:
PSP12 – Public Open Space Contributions (Park)	$25,474.00
PSP16 – Sewerage Headworks Contributions	$62,375.00
PSP17 – Water Supply Headworks Contributions	$54,735.00
PSP20 – Pathway Trunk Network Contributions	$26,614.00
TOTAL Contribution Amount =	$ 169,198.00
Please note, that these amounts are all subject to variations in the Consumer Price Index, All Groups Brisbane from March 2019 until the date of payment.
All contributions must be paid prior to the change of use happens

In addition, 4 advisory notes are required to be amended to reflect the increase in use area.

draft planning scheme
The draft Planning Scheme provisions have been addressed within the assessment of each condition above.
conclusion & reasons for decision
There has been no changes to The Noosa Plan that effect the assessment of this development. The built form changes do not result in a substantially different development as set out in the DA Rules and the car paring complies with the rate identified by Councils traffic consultant at the time of the original approval.
RECOMMENDATION
With regard to Application No. 132007.738.04, to make a minor change to an existing approval for Material Change of Use – Industrial Business Type 1 (Warehouse) & Industrial Business Type 2 (Production, Alteration, Repackaging & Repairing) situated at 64 Gateway Dr Noosaville Qld 4566 described as Lot 13 SP 170295, is provided in accordance with Section 63(5) of the Planning Act 2016, Council on decided to:
A.	Approve the change.
B.	Amend conditions 1, 3, 8, 10, 22 24, 31, 32, 43, 44, 45, 50, 51, 52 and 68 to read as follows:
Development undertaken in accordance with this approval must generally comply with the approved plan of development. The approved plan is titled and numbered:
Plan / Document No.	Rev.	Plan / Document Name	Date
A.102	B	Master Plan - Staging Plan, prepared by Zest Design	19-06-2019
A.200	E	Master Floor Plan, prepared by Zest Design	19-06-2019
A.201	C	Pod A – Floor Plan, prepared by Zest Design	30-05-2019
A.202	C	Pod B – Floor Plan, prepared by Zest Design	30-05-2019
A.203	C	Pod C – Floor Plan, prepared by Zest Design	30-05-2019
A.204	C	Pod D & E – Floor Plan, prepared by Zest Design	30-05-2019
A.205	C	Pod F – Floor Plan, prepared by Zest Design	30-05-2019
A.206	C	Pod G – Floor Plan, prepared by Zest Design	30-05-2019
A.207	C	Pod H – Floor Plan, prepared by Zest Design	30-05-2019
A.300	B	Elevations, prepared by Zest Design	30-05-2019
A.301	A	Elevations, prepared by Zest Design	09-05-2019
and as may be amended by these conditions.
The open space and setback areas are to be landscaped in accordance with Council’s Policy on Landscaping Guidelines and a properly prepared landscape plan prepared by a suitably qualified Landscape Architect or Horticulturalist. Such landscaping is to be completed prior to the premises being occupied and maintained at all times thereafter.  The landscaping shall include:
A minimum of 2m width of landscaping adjacent to uncovered parking at the head of the cul-de-sac except for car space 12 which must  be setback a minimum of 1.7m and car space 13 which must be setback a minimum of 1.4m. The motor cycle space closest to the each side of the central entry must be removed and replaced with landscaping and include a shade tree;
A minimum of 1 shade tree per six vehicle parking spaces;
Dense native screening vegetation within the landscaped buffer adjacent the western boundary (where not located within the easement area) consisting of species with a range of mature canopy heights;
Revegetation of the landscaped buffer along the northern and eastern boundaries; &
Appropriate landscaping / treatment to bin collection or storage areas so that they do not dominate the streetscape.
8.	The retail sales component of any tenancy shall not exceed the gross floor area requirement of the Planning Scheme in force at the time for that tenancy and shall remain an ancillary component of the approved use.
10.	Secure bicycle racks shall be provided on site to accommodate a minimum of 45 bicycles.  The proposed bicycle racks shall be identified on the landscaping plans and shall be shall be dispersed across the site to the reasonable satisfaction of Council.
22.	The Development Permit for a material change of use of premises lapses if the use has not happened by 2 July 2022 unless an application to extend the currency is approved by Council.
24. 	Vehicular access to the site shall be constructed from the Gateway Drive frontage of the site generally in accordance with the approved plans and as may amended by these conditions.
31.	Car parking, loading zones and skip bin storage shall be designed and constructed generally in accordance with the approved plans.
32.	A minimum of 127 uncovered carpark spaces shall be provided on site and shall include:-
clearly defined and strategically placed disabled carpark spaces.
a minimum of the equivalent of 3 of the car parking spaces designated for motorcycle and motor scooter parking, to accommodate a minimum of 12 spaces.  Motorcycle and motor scooter parking is to be evenly dispersed across the site.
43.	Prior to issue of any Operational Works Approval for the development, the applicant must provide Council with an updated stormwater quality management plan for the site that demonstrates that the following targets are achievable within the development design including for each individual stage of development:
All stormwater from the site must be treated to achieve the following pollution reduction targets:
80% reduction in Total Suspended Solids
60% reduction in Total Phosphorous
45% reduction in Total Nitrogen
Where Bioretention basins are proposed to achieve the outcomes, they must be designed in accordance with the Water By Design Technical Design Guidelines and demonstrate that all infrastructure that is part of the bioretention basin is not likely to become compromised by future sea-level rises.
44.	Any bioretention basins must be maintained in accordance with the Water by Design Technical Design Guidelines and records made available to Council on request. Bioretention basin maintenance requirements must be incorporated in the Community Management Scheme for the development and a copy of this must be provided for Council’s records prior to commencement of the approved use.
45.	The site shall be connected to Unitywater’s existing sewerage reticulation systems and be constructed in accordance with Council’s standards and requirements at no cost to Council.
The site shall be connected to Unitywater’s existing town water supply and be constructed in accordance with Unitywater’s standards and requirements at no cost to Unitywater.
Each individual water connection to the water reticulation system shall extend to the property boundary and be metered.  All fees for the supply of water meters shall be paid to Unitywater.
All water meters must be located outside the property boundary and in an easily assessable location to facilitate unhindered reading by Unitywater and/or Unitywater’s contracted water meter readers, and not behind fences or locked gates.  In this regard approval of the water meter configuration and location must be obtained from Unitywater prior to lodgement and approval of hydraulic drawings.
Contributions Towards Council Infrastructure (amended xx/xx/2019)
68. 	Monetary contributions shall be paid to Noosa Council towards the cost of providing and/or upgrading various infrastructure at the rates applicable at the time of payment. An estimate only of the contribution amounts under the current Council policies and requirements is outlined in the table below:

Contribution Required For: Amount:
PSP12 – Public Open Space Contributions (Park)	$25,474.00
PSP16 – Sewerage Headworks Contributions	$62,375.00
PSP17 – Water Supply Headworks Contributions	$54,735.00
PSP20 – Pathway Trunk Network Contributions	$26,614.00
TOTAL Contribution Amount =	$169,198.00
Please note that these amounts are all subject to variations in the Consumer Price Index, All Groups Brisbane from March 2019 until the date of payment.

All contributions must be paid prior to the change of use happens.
C.	Delete Item 6 Approved Plans/Documents.
D.	Include the following additional conditions 83, 84:
Additional Conditions July 2019
Staging
83. Should the development be staged, the staging sequence must be undertaken in accordance with the approved master plan - staging plan.
Sunset Clause for Completion of Approved Development
84. Pursuant to s88(1) of the Planning Act 2016, the uncompleted aspects of this development approval lapses if the whole of the approved use has not happened by 2 July 2026.
E.	Amend Advice Notes 1, 2 and 13 to read as follows:
1.	The applicant is advised that development contributions and infrastructure charges applicable to this change to a development approval (amended xx/xx/2019) have been based on the following Uses Class/ Uses and applicable quantities:-

Existing Development	Approved Development
Existing Use Class / Use	Existing Quantity	Approved Use Class / Use	Approved Quantity
Non-residential	Vacant Land	Industrial Business – Type 1 & 2	5,769 m2

The applicant is informed that approval of this change to a development approval (amended xx/xx/2019) will trigger an Amended Infrastructure Charge in accordance with the Coastal Major Road Network Infrastructure Charges Plan for the estimated amount of $257,626.00 and is subject to variations in the Consumer Price Index, All Groups Brisbane from March 2019 until the date of payment. An Amended Infrastructure Charge Notice will be issued in accordance with Chapter 5 of the Integrated Planning Act 1997.
Additional Advisory Note 14 June 2016 (amended XX/XX/2019)
13	An Infrastructure Agreement applies to this development that requires alternative Infrastructure Contributions in accordance with the Noosa Shire Charges Resolution No.3 (2018) replacing the Contribution Conditions and Infrastructure Charge applied by the original Development Approval.
F.	Delete Advisory Note 3.

[word/footer1.xml]
Page 13 of 13

[word/header1.xml]
3

[Attachment: image1.png (image text)]
   

    
  
 

hon Te ind On ty
ee
LST Et | |

 
    

ror OA |

Eig iia pe
| [|
ee oa a

 

       
 

 

 


[Attachment: image2.png (image text)]
STAGE 1
STAGE 2
STAGE 3

 

  

yt STAGE 1

Porter terete!

 
Log in to download the original file

Minor Change Report 132007.738.04.docx · 333 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.